Toronto address · Ward 11, University-Rosedale
110 Charles St E
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation · Other
Proposal to replace heating riser.
Applied Mar 5, 2026 · issued Mar 16, 2026 · Permit 26 125362 MSA
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for localized concrete repairs, drain replacement, waterproofing replacement, overburden replacement and interlocking repairs
Applied Mar 20, 2025 · issued Apr 10, 2025 · completed Aug 25, 2026 · Permit 25 132321 BLD
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Proposed entrance / exit parking garage ramp repairs.
Applied Mar 15, 2024 · issued Apr 8, 2024 · Permit 24 125980 BLD
- Permit issued
Heating and ventilation · Other
Install heat exchangers for alternated source of heating for hot tub and pool and free cooling via cooling tower for energy savings
Applied Oct 23, 2014 · issued Nov 7, 2014 · Permit 14 241873 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
69 storeys · 837 homes · Mixed use
140 m away · Site plan · Under review · filed May 30, 2022
- Approved
- Under review
59 storeys · 656 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 30, 2021
- Under review
112-124 Isabella Street, 30-40 Huntley Street and 1 Mount Pleasant Road
60 storeys · 1,362 homes · Residential
160 m away · Site plan · Under review · filed Dec 11, 2025
- Approved
50 storeys · 508 homes · Residential
180 m away · Site plan · Approved · filed Apr 26, 2022
- Under review
47-65 Huntley Street, 8-26 Linden Street and 1-11 Selby Street
59 storeys · Mixed use
200 m away · Site plan · Under review · filed Apr 29, 2022
Neighbours’ Committee of Adjustment files within 250 m
235 Bloor St E · Minor variance
140 m away · filed Aug 31, 2026 · Postponed
1 Mount Pleasant Rd · Minor variance
To permit the replacement of 4 new mechanical units.
100 m away · filed Feb 11, 2025 · Approved
62 Charles St E · Minor variance
To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.
240 m away · filed Jan 12, 2024 · Approved
66 Charles St E · Minor variance
To convert the existing two-and-one-half-storey detached residential (heritage) building into an apartment building by maintaining only the front portion of the existing building and constructing a 9-storey rear addition (and one mechanical penthouse level). Also, to construct a front ground floor porch and stairs, a front basement walkout, rear balconies on the second to fourth storeys, a front deck on the fourth storey, as well as front and rear balconies on the fifth to nineth storeys. There will be a total of 16 dwelling units within this apartment building.
220 m away · filed Sep 6, 2023 · Approved
628 Church St · Minor variance
To alter an existing approved 47-storey mixed-use building by constructing three additional storeys for a total of 50-storeys. The number of residential units will increase from 403 units to 423 units.
190 m away · filed Mar 21, 2022 · Approved
92 Isabella St · Minor variance
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
150 m away · filed Feb 8, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.