Toronto address · Ward 4, Parkdale-High Park
110 Grenadier Rd
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started - express
Small residential project · Interior alterations
Proposed kitchen window enlargement.
Applied Sep 23, 2026 · Permit 26 242637 BLD
- Cancelled
Small residential project · Deck
Construct a second floor deck over existing first storey roof.
Applied Jan 17, 2018 · issued Jun 12, 2018 · completed May 28, 2026 · Permit 18 106147 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve
Applied Sep 18, 2017 · issued Sep 18, 2017 · completed Sep 19, 2017 · Permit 17 234386 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · 130 homes · Mixed use
370 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
15 Constance St · Minor variance
70 m away · filed Sep 24, 2026 · Accepted
374 Sunnyside Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a north side third storey dormer addition, a new enclosed front porch with a canopy and stairs, and a rear covered porch with stairs.
240 m away · filed Aug 5, 2026 · Tentatively scheduled
350 Sunnyside Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition with a new rear roof deck above. The existing partial one-storey ground floor addition with roof deck above will be demolished.
190 m away · filed Nov 26, 2025 · Approved
289 Roncesvalles Ave · Minor variance
To alter the existing three-storey mixed-use building by constructing rear second and third storey additions (above the existing ground level that will be partially reconstructed with a new rear basement addition below), a complete fourth storey addition with front and rear balconies, a rear basement walkout, a south side second storey balcony, as well as rooftop access for maintenance from two staircase enclosures and one elevator enclosure (located above the fourth level). There will be a total of one commercial unit and six residential dwelling units on this lot (one commercial unit occupy…
160 m away · filed Sep 11, 2025 · Approved
345 Sunnyside Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition (with a flat roof), and a rear ground floor deck with stairs. The existing one-storey ancillary building (garage), in the rear yard, will be maintained and unaltered.
140 m away · filed Aug 29, 2025 · Approved
76 Grenadier Rd · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing the front covered porch, as well as, to construct a rear second storey addition (above the existing one-storey), and a rear ground floor deck.
230 m away · filed Sep 1, 2024 · Approved
294 Roncesvalles Ave · Minor variance
To permit a wellness centre (located in the basement and ground floor) in the existing two-and-one-half-storey mixed-use building that contains two dwelling units (located on the second and third floor).
50 m away · filed Jan 19, 2024 · Approved
141 Geoffrey St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with a rear ground floor patio and stairs. Also, to construct a one-storey ancillary building (detached garage with a west side deck and stairs) in the rear yard.
150 m away · filed Jul 24, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.