Toronto address · Ward 19, Beaches-East York
111 Stephenson Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to install 1 backflow prevention device in an existing apartment building.
Applied Sep 13, 2011 · issued Oct 11, 2011 · Permit 11 273617 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under appeal
55 storeys · 1,543 homes · Residential
260 m away · Rezoning · Under appeal · filed Aug 26, 2022
- Approved
37 storeys · 897 homes · Residential
320 m away · Site plan · Approved · filed Apr 25, 2022
- Under appeal
48 storeys · 1,050 homes · Residential
370 m away · Rezoning · Under appeal · filed Dec 21, 2022
- Under appeal
55 storeys · 1,139 homes · Mixed use
450 m away · Subdivision · Under appeal · filed Nov 7, 2021
- Under review
8 storeys · 64 homes · Not stated in the file
480 m away · Site plan · Under review · filed Mar 10, 2026
Neighbours’ Committee of Adjustment files within 250 m
48 Norwood Rd · Minor variance
To permit the construction of a new two-storey detached dwelling with a front porch with stairs, and a front walkway. The existing one-storey detached ancillary building (garage) abutting the laneway, will be maintained and unaltered.
220 m away · filed Aug 12, 2025 · Approved
286 Main St · Minor variance
To alter the development standards for a 27-storey mixed-use building (as approved under Site Specific Zoning By-law 265-2021(LPAT)) to permit the ground floor non-residential area to be converted into a childcare centre with south and west outdoor recreational areas. Also, three short-term parking spaces will be removed.
140 m away · filed May 5, 2025 · Approved
286 Main St · Minor variance
To alter the development standards for a 27-storey mixed-use building (approved under Site Specific Zoning By-laws 266-2021(LPAT) and 265-2021(LPAT)) to permit non-residential uses (other than office space use) on the ground floor.
140 m away · filed Jul 30, 2024 · Approved
108 Enderby Rd · Minor variance
To permit the existing one-storey ancillary building (garden suite) in the rear yard, abutting Norwood Terrace. There will be a total of four residential dwelling units on this lot (three dwelling units within the main house and one dwelling unit located in the ancillary building containing a garden suite). Also, no bicycle parking spaces will be provided on-site.
200 m away · filed Jun 5, 2024 · Approved
276 Main St · Minor variance
To permit a reduced non-residential gross floor area (office or medical office) within the building.
110 m away · filed Mar 14, 2023 · Approved
45 Norwood Ter · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition, with a ground floor deck, a second storey side (east) deck, and a front basement walkout (for the existing one primary unit and two secondary suites). The existing one-storey ancillary building (detached garage), in the rear yard, will be fully demolished.
230 m away · filed Feb 16, 2023 · Approved
101 Enderby Rd · Minor variance
To alter the existing two-storey detached dwelling (rooming house) by constructing a two-storey rear addition and to construct 5 additional dwelling rooms (from 11 rooms to 16 rooms).
210 m away · filed Dec 14, 2022 · Refused
165 Stephenson Ave · Minor variance
To construct a new maintenance building.
110 m away · filed Feb 8, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.