Toronto address · Ward 10, Spadina-Fort York
113 Massey St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Party wall admin permit related to 111 Massey St. (18-159292 BLD 00 SR)
Applied Nov 15, 2018 · issued May 28, 2019 · completed Aug 20, 2025 · Permit 18 256932 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
13 storeys · Mixed use
220 m away · Site plan · Under review · filed Dec 24, 2021
- Under review
17 storeys · 227 homes · Mixed use
260 m away · Site plan · Under review · filed Sep 8, 2022
- Approved
938-950 King Street West and 95-99 Strachan Avenue
18 storeys · 229 homes · Mixed use
260 m away · Site plan · Approved · filed Aug 4, 2021
- Approved
801-805 Wellington Street West and 53 Strachan Avenue
28 storeys · 296 homes · Residential
460 m away · Rezoning · Approved · filed Mar 17, 2026
Neighbours’ Committee of Adjustment files within 250 m
860 Richmond St W · Minor variance
To convert the existing three-storey non-residential building (office uses) into a hotel building containing 62 rooms (basement level to third level), with a restaurant use located on the first level, and a gym within the basement level. Also, to alter the existing building by constructing a new front canopy, and two new interior stairwells and one new elevator for the purpose of rooftop access. There will be no parking spaces provided on-site.
120 m away · filed Sep 4, 2026 · Postponed
106 Massey St · Minor variance
50 m away · filed Aug 12, 2026 · Postponed
71 Crawford St · Minor variance
To alter the existing rear ancillary building (detached garage) by constructing a second storey addition (containing one laneway suite), with a portion of the ground floor retained for garage parking (one parking space). There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit with the ancillary building).
100 m away · filed Nov 18, 2025 · Approved
69 Crawford St · Minor variance
To construct a new one-storey ancillary building (detached garage) abutting the lane, in the rear yard of the lot containing the exisitng two-and-one-half storey semi-detached dwelling. The existing detached garage will be demolished.
110 m away · filed Oct 3, 2025 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey cantilevered addition. Also, to alter the existing rear one-storey ancillary building (garage) by constructing a new cantilevered second storey laneway suite addition. There will be a total of two residential dwelling units (one unit occupying the main dwelling and one unit occupying the laneway suite).
250 m away · filed Jun 6, 2025 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition and to construct a new laneway suite (second floor) above existing garage in the rear yard.
250 m away · filed Jun 6, 2025 · Application withdrawn
897 Queen St W · Minor variance
To convert the existing three-storey mixed-use building into a rooming house containing 20 dwelling rooms and a restaurant use on the ground floor. There will be 6 dwelling rooms located on the ground floor, 11 dwelling rooms located on the second level, and 3 dwelling rooms on the third level of this building. The existing third storey residential dwelling unit will be demolished.
180 m away · filed Sep 29, 2024 · Application withdrawn
104 Massey St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey cantilevered addition (to replace the existing one-storey addition), and a rear third storey addition (to replace the existing rear third storey dormer).
50 m away · filed Oct 5, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.