Toronto address · Ward 9, Davenport
115 Miller St
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Proposed interior alterations to existing basement of sfd. Work to include moving existing kitchen to rear, creating 3-piece bath, and installing a back water valve. Basement to be used in conjunction with upper floors.
Applied Jan 11, 2023 · issued Feb 13, 2023 · completed Jul 20, 2023 · Permit 23 102546 DRN
- Closed
Plumbing
Plumbing - Proposed interior alterations to existing basement of sfd. Work to include moving existing kitchen to rear, creating 3-piece bath, and installing a back water valve. Basement to be used in conjunction with upper floors.
Applied Jan 10, 2023 · issued Feb 13, 2023 · completed Jul 20, 2023 · Permit 23 102546 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations to existing basement of sfd. Creating 3-piece bath, and installing a back water valve. Basement to be used in conjunction with upper floors.
Applied Jan 10, 2023 · issued Feb 13, 2023 · completed Jul 17, 2023 · Permit 23 102546 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
44-52 Lindner Street and 189-195 Old Weston Road
27 storeys · 405 homes · Residential
210 m away · Site plan · Under review · filed Mar 31, 2023
- Approved
- Under review
35 storeys · Residential
240 m away · Subdivision · Under review · filed Jul 9, 2021
- Under review
27 storeys · 321 homes · Residential
290 m away · Site plan · Under review · filed Apr 29, 2022
- Under review
45 storeys · 1,151 homes · Mixed use
410 m away · Site plan · Under review · filed Apr 29, 2022
Neighbours’ Committee of Adjustment files within 250 m
8 Ford St · Minor variance
To convert the existing rear one-storey detached ancillary building (three-car garage, abutting the laneway) into a two-storey ancillary building (containing a one-car garage on the ground level, and one laneway suite that will occupy the north portion of the ground level and the second storey), by constructing a second storey addition with a second story balcony (located at the west side of the building). There will be a total of three residential dwelling units on this lot (two units within the detached main dwelling and one unit within the ancillary building).
170 m away · filed Feb 2, 2026 · Approved
61 Pelham Park Gdns · Minor variance
To alter the existing 17-storey residential apartment building by replacing the existing entrance vestibule with a larger reconstructed resident lobby and mail room.
230 m away · filed Sep 11, 2025 · Approved
257 Osler St · Minor variance
To legalize and to maintain the existing two-storey detached ancillary building (two-car garage), in the rear yard.
80 m away · filed Feb 20, 2024 · Approved
46 Lindner St · Minor variance
To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.
200 m away · filed May 14, 2021 · Approved
44 Lindner St · Minor variance
To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.
190 m away · filed May 14, 2021 · Approved
78 Miller St · Minor variance
To alter the existing lawful non-conforming Class B Motor Vehicle Repair Shop by constructing a rear three-storey addition with a rear second storey deck, and a front third storey deck.
110 m away · filed Mar 26, 2021 · Approved
1993 Davenport Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor deck and rear carport.
230 m away · filed Dec 30, 2019 · Approved
25 Miller St · Minor variance
To create an additional secondary suite. The dwelling will contain one dwelling unit and two secondary suites.
240 m away · filed Nov 20, 2018 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.