Toronto address · Ward 19, Beaches-East York
115 Spruce Hill Rd
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
REV#!- STRUCTURAL CHANGE TO LAYOUTProposal for a new ground floor bay window and interior alterations.
Applied Nov 8, 2018 · issued Dec 4, 2018 · completed May 30, 2019 · Permit 18 209854 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for a new ground floor bay window and interior alterations.
Applied Aug 15, 2018 · issued Oct 9, 2018 · completed May 27, 2019 · Permit 18 209854 PLB
- Closed
Small residential project · Multiple projects
Proposal for a new ground floor bay window and interior alterations.
Applied Aug 15, 2018 · issued Oct 9, 2018 · completed May 30, 2019 · Permit 18 209854 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct a new rear detached garage.
Decision: Approved (hearing Aug 4, 2021)
Filed Apr 1, 2021 · File A0433/21TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
264 Beech Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition (with a front and rear balcony, and a side (north) courtyard). Also, to construct a new front porch with stairs. The existing front second storey balcony will be demolished, and the lawfully existing front yard parking pad will be maintained.
210 m away · filed Jul 21, 2026 · Hearing scheduled
163 Balsam Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front one-storey addition (front porch enclosure), a new front porch with stairs, a front second storey balcony, and a rear one-storey addition (below the existing cantilevered second storey).
200 m away · filed Dec 4, 2024 · Approved
97 Spruce Hill Rd · Minor variance
To construct a new two-storey ancillary building (containing a one-car garage, and one laneway suite), in the rear yard, abutting the laneway. The existing shed will be demolished.
50 m away · filed May 6, 2024 · Approved
157 Maclean Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear one-storey and two-storey additions, a front porch with stairs, and a rear yard pergola. Also, to construct a one-storey ancillary building (detached garage) in the rear yard.
240 m away · filed Nov 4, 2022 · Approved
4 Pine Ter · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey addition (dormer).
240 m away · filed Sep 27, 2022 · Approved
65 Pine Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition to replace the existing second storey balcony above the front porch.
250 m away · filed Jul 15, 2022 · Approved
185 Beech Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a deck.
110 m away · filed Mar 23, 2022 · Approved
18 Cedar Ave · Minor variance
To alter the existing detached garage in the rear yard by constructing a new rooftop deck with stairs.
200 m away · filed Jan 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.