Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

115 Tenth St

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 02: Proposed front porch.Rev 01: new second floor deck on existing carport roof added to scopeProposal for interior renovations and additon, convert SFD to duplex.

    Applied Jun 11, 2026 · issued Jun 26, 2026 · Permit 25 193487 BLD (revision 02)

    Revision issued
  • Small residential project · Multiple projects

    Rev 01: new second floor deck on existing carport roof added to scopeProposal for interior renovations and additon, convert SFD to duplex.

    Applied Mar 16, 2026 · completed Jun 18, 2026 · Permit 25 193487 BLD (revision 01)

    Cancelled
  • Small residential project · Multiple projects

    Proposal for interior renovations and additon, convert SFD to duplex.

    Applied Jul 14, 2025 · issued Dec 29, 2025 · Permit 25 193487 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior renovations and additon, convert SFD to duplex.

    Applied Jul 14, 2025 · issued Feb 12, 2026 · Permit 25 193487 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior renovations and a rear extension to existing SFD.

    Applied Jul 14, 2025 · issued Dec 29, 2025 · Permit 25 193487 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and to maintain an enclosed second storey front platform, to construct a second storey rear addition, and to convert the existing dwelling into a duplex.

    Decision: Approved (hearing Nov 20, 2025)

    Filed Oct 14, 2025 · File A0398/25EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 73 Tenth St · Minor variance

    To construct a one-storey rear addition and a new rear deck.

    170 m away · filed Dec 2, 2025 · Approved

  • 84 Tenth St · Minor variance

    To construct a second and third storey addition above the existing dwelling.

    150 m away · filed Apr 29, 2025 · Approved

  • 100 Tenth St · Minor variance

    To construct a one-storey vestibule addition along the front wall of the existing place of worship to accommodate an elevator.

    100 m away · filed Dec 4, 2024 · Approved

  • 69 Tenth St · Minor variance

    To construct a two-storey rear addition including a deck in the rear yard.

    190 m away · filed Aug 9, 2024 · Approved

  • 72 Eighth St · Minor variance

    To construct a new detached garage in the rear yard.

    250 m away · filed Dec 21, 2023 · Approved

  • 69 Ninth St · Minor variance

    To construct an ancillary structure in the rear yard which will contain a detached garage and a garden suite.

    240 m away · filed May 29, 2023 · Approved

  • 90 Eleventh St · Minor variance

    To construct a second storey addition above the existing dwelling, a new rear deck and new front porch. A previous Committee of Adjustment application (A0443/21EYK) approved variances relating to floor space index, front and side yard setbacks, height and a secondary suite.

    180 m away · filed Aug 23, 2022 · Approved

  • 3049-3051 Lake Shore Blvd W · Minor variance

    To maintain the existing medical centre on the first floor and the 12 dwelling units.

    110 m away · filed Jul 5, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.