Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

115 The Esplanade

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposed replacement of existing fire alarm panel

    Applied Oct 31, 2025 · issued Nov 26, 2025 · Permit 25 247593 FSU

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for a new medical office fit-out with to be completed with new plumbing, reconfiguring HVAC system and addition of a universal washroom.

    Applied Mar 26, 2025 · issued Jun 19, 2025 · Permit 25 134887 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for a new medical office fit-out with to be completed with new plumbing, reconfiguring HVAC system and addition of a universal washroom.

    Applied Mar 26, 2025 · issued Jun 19, 2025 · Permit 25 134887 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a new medical office fit-out with to be completed with new plumbing, reconfiguring HVAC system and addition of a universal washroom.

    Applied Mar 26, 2025 · issued Jun 19, 2025 · Permit 25 134887 PLB

    Inspections under way
  • Designated structure · Communication tower

    Install telecommunications equipment including equipment shelter on the roof.

    Applied May 16, 2001 · issued Jun 28, 2001 · Permit 01 138096 000

    Permit issued
  • Multiple-use permit · Unknown

    Build new buiding (site a) hold for parks levy (717-89); see new dpw mun.# (formerly 1 & 1a church st) hold for dpw survey appvl see by-law 417-91. Mr.wade tam fam. /sp

    Applied Jul 20, 1992 · issued Jan 15, 1996 · completed Sep 18, 2026 · 142 homes added · Permit 92 019394 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 45 The Esplanade

    39 storeys · 630 homes · Mixed use

    220 m away · Site plan · Approved · filed Dec 29, 2021

    Approved
  • 175-185 King Street East

    46 storeys · 437 homes · Mixed use

    320 m away · Site plan · Approved · filed Aug 11, 2022

    Approved
  • 65 George Street and 187 King Street East

    17 storeys · Non-residential

    330 m away · Site plan · Under review · filed Apr 25, 2022

    Under review
  • 49-51 Yonge Street

    60 storeys · 256 homes · Mixed use

    420 m away · Condominium · Under review · filed Nov 8, 2021

    Under review
  • 53-55 Yonge Street

    68 storeys · 836 homes · Residential

    420 m away · Rezoning · Under review · filed Oct 21, 2024

    Under review
  • 53-55 Yonge Street

    66 storeys · 511 homes · Mixed use

    420 m away · Site plan · Under review · filed Apr 27, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 110 George St S · Minor variance

    To alter the existing 11-storey apartment building, from the original building permit, by removing four vehicle parking spaces in order to construct a new storage and bicycle room on Parking Level 1.

    220 m away · filed Aug 23, 2021 · Approved

  • 140 The Esplanade · Minor variance

    To alter parking level one of the existing mixed-use building by converting four parking spaces into two accessible parking spaces.

    180 m away · filed Jul 8, 2021 · Approved

  • 80 Front St E · Minor variance

    APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.

    170 m away · filed Dec 12, 2019 · Withdrawn

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.