Toronto address · Ward 15, Don Valley West
117 Beechwood Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
Revision 01. Proposal to add a cold room below front porchConstruct a new two storey dwelling, with a intergal garage, finished basement, basement walkout, two covered terraces at rear of dwelling, 2nd floor balcony from master bedroom, covered entrance
Applied Dec 15, 2023 · issued Jan 12, 2024 · completed Aug 15, 2024 · Permit 22 125570 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Construct a new two storey dwelling, with a intergal garage, finished basement, basement walkout, two covered terraces at rear of dwelling, 2nd floor balcony from master bedroom, covered entrance
Applied May 8, 2023 · issued May 29, 2023 · completed Jul 2, 2024 · Permit 22 125570 HVA
- Closed
Plumbing
Plumbing - Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwelling, with integral garage, finished basement with walkout, covered terrace at rear and second storey balcony
Applied Mar 22, 2022 · issued May 18, 2022 · completed Jul 8, 2024 · Permit 22 125570 PLB
- Closed
New house · New building
Construct a new two storey dwelling, with a intergal garage, finished basement, basement walkout, two covered terraces at rear of dwelling, 2nd floor balcony from master bedroom, covered entrance
Applied Mar 22, 2022 · issued May 18, 2022 · completed Aug 15, 2024 · 1 home added · Permit 22 125570 BLD
- Closed
Demolition
Demolish existing dwelling and construct a new two storey dwelling
Applied Mar 22, 2022 · issued May 18, 2022 · completed Jun 6, 2023 · 1 home removed · Permit 22 125624 DEM
- Closed
Drains and site services
Drain - Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwelling, with integral garage, finished basement with walkout, covered terrace at rear and second storey balcony
Applied Mar 22, 2022 · issued May 18, 2022 · completed Jul 2, 2024 · Permit 22 125570 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new dwelling.
Decision: Approved (hearing Jun 17, 2021)
Filed May 4, 2021 · File A0320/21NY
What’s planned nearby
Development sites within 500 m
- Under review
Neighbours’ Committee of Adjustment files within 250 m
198 York Mills Rd · Minor variance
To construct a new detached dwelling with a rear deck.
170 m away · filed Mar 20, 2025 · Approved
55 Fenn Ave · Minor variance
Proposal to construct a two-storey addition and full third storey addition to existing Single Family Dwelling, proposal to also include interior alterations throughout with secondary suite.
170 m away · filed Mar 30, 2023 · Approved
26 York Rd · Minor variance
To construct a new dwelling.
130 m away · filed Oct 4, 2021 · Approved
94 Highland Cres · Minor variance
To construct a new dwelling.
170 m away · filed Jan 13, 2021 · Approved
23 Birchwood Ave · Minor variance
To construct a new dwelling.
70 m away · filed Nov 10, 2020 · Approved
107 Munro Blvd · Minor variance
To construct a new dwelling.
220 m away · filed Feb 6, 2019 · Approved
107 Munro Blvd · Minor variance
To construct a new dwelling.
220 m away · filed Sep 25, 2018 · Refused
9 York Rd · Minor variance
To construct a new one-storey addition (sunroom) to the rear of the existing dwelling.
110 m away · filed Jul 24, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.