Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

12 Audley Ave

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed ground floor addition and extension on rear side, basement to-footing, and interior alterations in basement and ground floor

    Applied Sep 11, 2026 · Permit 26 235937 PLB

    Issuance pending
  • Small residential project · Multiple projects

    Proposed ground floor addition and extension on rear side, basement to-footing, and interior alterations in basement and ground floor

    Applied Sep 11, 2026 · Permit 26 235937 BLD

    Not started
  • Drains and site services

    Drain - Proposed ground floor addition and extension on rear side, basement to-footing, and interior alterations in basement and ground floor

    Applied Sep 11, 2026 · Permit 26 235937 DRN

    Issuance pending

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

    Decision: Approved (hearing Aug 5, 2026)

    Filed Jun 17, 2026 · File A0447/26TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    180 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    170 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    160 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    170 m away · filed Jun 5, 2025 · Approved

  • 75 Badgerow Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.

    130 m away · filed May 27, 2025 · Approved

  • 1230 Dundas St E · Consent

    To obtain consent to sever a portion of the lands within the existing building for a lot addition (stratified) and to maintain existing easements/rights-of-way. Note: 1230 and 1220 Dundas Street East are contiguous properties, under the same ownership and share a building envelope (with separate entrances) with modifiable demising walls. The adjacent property at 1210 Dundas Street East is occupied by Crow¿'s Theatre.

    190 m away · filed Apr 23, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    210 m away · filed Apr 22, 2025 · Approved

  • 202 Pape Ave · Minor variance

    To alter the existing two-and-one-half-storey dwelling by constructing a rear two-storey addition, a complete third storey addition with a front balcony, a front covered porch extension with stairs, a rear basement walkout with terrace, a rear ground floor deck, and rear second and third storey balconies. Also, to convert the dwelling into a fourplex dwelling for a total of four residential dwelling units on this lot.

    130 m away · filed Aug 22, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.