Toronto address · Ward 14, Toronto-Danforth
137 Boston Ave
The City of Toronto has 8 building permits since 2017 (1 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for a new laneway suite for a handicapped person.
Applied Jun 3, 2025 · issued Sep 11, 2025 · Permit 25 170287 HVA
- Closed
Plumbing
Plumbing - Proposal for a new laneway suite for a handicapped person.
Applied Jun 3, 2025 · issued Sep 11, 2025 · completed Feb 21, 2026 · Permit 25 170287 PLB
- Closed
Small residential project · New laneway / rear yard suite
Proposal for a new laneway suite for a handicapped person.
Applied Jun 3, 2025 · issued Sep 11, 2025 · completed Mar 24, 2026 · Permit 25 170287 BLD
- Closed
Drains and site services
Drain - Proposal for a new laneway suite for a handicapped person.
Applied Jun 3, 2025 · issued Jul 25, 2025 · completed Feb 21, 2026 · Permit 25 170287 DRN
- Closed
Small residential project · Addition(s)
REVISION - - Proposed interior alterations . Load bearing wall removal on 1st floor- Change of third floor front window layout- Change of third floor bathroom layout- Kitchen renovationTo alter the existing 2 storey detached dwelling by constructing a new third storey addition and a new second storey balcony at rear.
Applied Sep 15, 2023 · issued Sep 19, 2023 · completed Jun 3, 2025 · Permit 22 145811 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Balcony addition on 2nd floor & Third floor addition
Applied May 13, 2022 · issued Dec 3, 2022 · completed Jun 3, 2025 · Permit 22 145811 HVA
- Closed
Small residential project · Addition(s)
To alter the existing 2 storey detached dwelling by constructing a new third storey addition and a new second storey balcony at rear.
Applied May 12, 2022 · issued Dec 2, 2022 · completed Jun 3, 2025 · Permit 22 145811 BLD
- Closed
Plumbing
Plumbing - Balcony addition on 2nd floor & Third floor addition
Applied May 12, 2022 · issued Dec 2, 2022 · completed Jun 3, 2025 · Permit 22 145811 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.
Decision: Approved (hearing Aug 13, 2025)
Filed Jul 17, 2025 · File A0548/25TEY
- Closed
Minor variance · R addition
To alter the existing two-storey detached dwelling by constructing a rear third floor addition, and a rear second floor balcony.
Decision: Approved (hearing Oct 26, 2022)
Filed Jul 20, 2022 · File A0835/22TEY
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
480 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
22 Badgerow Ave · Minor variance
To permit and maintain the existing front porch enclosure of the three-storey semi-detached dwelling, which was constructed beyond the limits of the approved building permit (24 150571 BLD 03 SR). There is a total of two residential dwelling units on this lot (one unit occupying the basement and first levels, and one unit occupying the second and third levels).
220 m away · filed Aug 28, 2026 · Hearing scheduled
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
160 m away · filed Jun 17, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
130 m away · filed Mar 2, 2026 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
130 m away · filed Jun 5, 2025 · Approved
1230 Dundas St E · Consent
To obtain consent to sever a portion of the lands within the existing building for a lot addition (stratified) and to maintain existing easements/rights-of-way. Note: 1230 and 1220 Dundas Street East are contiguous properties, under the same ownership and share a building envelope (with separate entrances) with modifiable demising walls. The adjacent property at 1210 Dundas Street East is occupied by Crow¿'s Theatre.
70 m away · filed Apr 23, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
250 m away · filed Apr 22, 2025 · Approved
326 Carlaw Ave · Minor variance
To alter the existing four-storey mixed-use building by constructing a one-storey rooftop addition (including a deck) above the residential condominium unit (Unit 109), as well as to construct a mezzanine addition within Unit 109.
160 m away · filed Apr 3, 2025 · Approved
53 Boston Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.
220 m away · filed Dec 3, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.