Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

120 Ridley Blvd

The City of Toronto has 3 building permits since 2017 and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 01 - rear stairs west sideProposal to construct new ground floor deck over new basement addition, new second storey deck over one storey addition, new basement walkout, new rear stairwell, and interior alterations.

    Applied Jun 22, 2023 · issued Jul 12, 2023 · completed Oct 13, 2023 · Permit 20 132756 BLD (revision 01)

    Closed
  • Small residential project · Deck

    Exterior deck stairs moved from the west to the east side of the deck

    Applied Sep 14, 2022 · issued Sep 21, 2022 · completed Oct 17, 2023 · Permit 22 203321 BLD

    Cancelled
  • Small residential project · Multiple projects

    Proposal to construct new ground floor deck over new basement addition, new second storey deck over one storey addition, new basement walkout, new rear stairwell, and interior alterations.

    Applied Apr 14, 2020 · issued Aug 10, 2020 · completed Oct 13, 2023 · Permit 20 132756 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a rear addition to the existing dwelling in conjunction with a new rear deck. Please note, a previous application (A0215/19NY) with respect to the Subject Property, was before the Committee of Adjustment, Thursday, May 23, 2019 which was ultimately refused.

    Decision: Approved (hearing Jul 18, 2019)

    Filed Jun 6, 2019 · File A0415/19NY

    Closed
  • Minor variance · R addition

    To construct a rear addition to the existing dwelling including walkout terraces on the ground floor and second floor.

    Decision: Refused (hearing May 23, 2019)

    Filed Mar 25, 2019 · File A0215/19NY

    Closed

What’s planned nearby

Development sites within 500 m

  • 190-200 Ridley Boulevard

    4 storeys · 20 homes · Residential

    480 m away · Site plan · Under appeal · filed Jan 18, 2023

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 123 Ridley Blvd · Minor variance

    To construct two ancillary structures (cabana and pergola) in the rear yard of the property.

    70 m away · filed May 15, 2025 · Approved

  • 45 Esgore Dr · Minor variance

    To alter the existing rear deck in conjunction with constructing a new roof over the deck. Please note, this application was previously deferred Thursday, March 20, 2025.

    230 m away · filed Feb 5, 2025 · Approved

  • 127 Yonge Blvd · Minor variance

    To construct a new three storey detached dwelling through interior alterations and additions to an existing two storey house.

    200 m away · filed Dec 31, 2024 · Approved

  • 41 Esgore Dr · Minor variance

    To construct a new detached dwelling.

    250 m away · filed Oct 1, 2024 · Approved

  • 9 Haddington Ave · Minor variance

    To construct two rear yard decks.

    250 m away · filed Nov 18, 2021 · Approved

  • 66 Esgore Dr · Minor variance

    To construct a new dwelling with a rear cabana.

    190 m away · filed Aug 17, 2021 · Approved

  • 107 Ridley Blvd · Minor variance

    To construct a new dwelling.

    90 m away · filed Aug 8, 2021 · Approved

  • 96 Esgore Dr · Minor variance

    To construct a one-storey addition (covered screen porch) to the rear of the existing dwelling.

    200 m away · filed Jun 23, 2021 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.