Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

45 Esgore Dr

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to alter existing rear wood deck size and construct new roof structure over deck (not enclosed), install one new sink on deck

    Applied May 13, 2025 · issued May 16, 2025 · completed Sep 10, 2025 · Permit 25 158881 PLB

    Closed
  • Small residential project · Deck

    ZAP Credit Not Applied ZAP Folder status - Notice Issued has not been closed see 25 11005 ZAP 00 SRPlans have been approved by MV A0046/25NYProposal to alter existing rear wood deck size and construct new roof structure over deck (not enclosed), install one new sink on deck

    Applied May 13, 2025 · issued May 16, 2025 · completed Sep 10, 2025 · Permit 25 158881 BLD

    Closed
  • Drains and site services

    Drain - Proposal to alter existing rear wood deck size and construct new roof structure over deck (not enclosed), install one new sink on deck

    Applied May 13, 2025 · issued May 16, 2025 · completed Sep 10, 2025 · Permit 25 158881 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing rear deck in conjunction with constructing a new roof over the deck. Please note, this application was previously deferred Thursday, March 20, 2025.

    Decision: Approved (hearing Apr 17, 2025)

    Filed Feb 5, 2025 · File A0046/25NY

    Closed

What’s planned nearby

Development sites within 500 m

  • 190-200 Ridley Boulevard

    4 storeys · 20 homes · Residential

    420 m away · Site plan · Under appeal · filed Jan 18, 2023

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 123 Ridley Blvd · Minor variance

    To construct two ancillary structures (cabana and pergola) in the rear yard of the property.

    170 m away · filed May 15, 2025 · Approved

  • 41 Esgore Dr · Minor variance

    To construct a new detached dwelling.

    20 m away · filed Oct 1, 2024 · Approved

  • 449 Elm Rd · Minor variance

    To construct a new dwelling.

    190 m away · filed Aug 7, 2024 · Approved

  • 12 Esgore Dr · Minor variance

    To construct a new detached dwelling.

    180 m away · filed Jun 6, 2024 · Approved

  • 127 Joicey Blvd · Minor variance

    To construct a new dwelling.

    100 m away · filed Nov 7, 2022 · Approved

  • 448 Elm Rd · Minor variance

    Proposal for first and second storey addition to the front and back of the existing building, as well as alteration of existing building and front and backyard

    240 m away · filed Sep 11, 2022 · Approved

  • 88 Felbrigg Ave · Minor variance

    Proposal to construct a new dwelling. Please note, this application was deferred November 3rd, 2022 to revise plans.

    190 m away · filed Aug 26, 2022 · approved on condtion

  • 25 Haddington Ave · Minor variance

    Proposal to construct a new two storey detached single family dwelling with integral garage. Please note, this application was deferred Aug 11, 2022 to revise drawings.

    60 m away · filed May 19, 2022 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.