Toronto address · Ward 6, York Centre
123 Garratt Blvd
The City of Toronto has 83 building permits since 2017 (13 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Temporary structure · Temporary structures
Proposal for the construction of two temporary structure for BTS Concert
Applied Aug 24, 2026 · completed Aug 26, 2026 · Permit 26 224718 TPS
- Under review
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers stadiumSet up: Aug. 28, 2026; Tear Down: Sept.18, 2026.
Applied Aug 21, 2026 · Permit 26 223655 TPS
- Cancelled
Temporary structure · Temporary structures
Proposal to Construct one temporary demountable stage for Rogers stadiumSet up: Aug. 20, 2026; Tear Down: Aug. 27, 2026.
Applied Aug 18, 2026 · completed Sep 10, 2026 · Permit 26 221733 TPS
- Permit issued
Temporary structure · Temporary structures
Construct temporary demountable grandstand for Rogers stadiumSet up: Aug. 18, 2026; Tear Down: Aug. 27, 2026.
Applied Aug 18, 2026 · issued Aug 26, 2026 · Permit 26 221635 TPS
- Permit issued
Temporary structure · Temporary structures
Construct one temporary demountable stage for Rogers stadiumSet up: Aug. 8, 2026; Tear Down: Aug. 13, 2026.
Applied Aug 10, 2026 · issued Aug 12, 2026 · Permit 26 216769 TPS
- Under review
Temporary structure · Temporary structures
Construct one temporary demountable structure - Brita ActivationSet up: Jul 29, 2026; Tear Down: Sept. 21, 2026.
Applied Jul 31, 2026 · Permit 26 211973 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers Stadium. Installation date: August 1 2026, Removal date: August 7, 2026
Applied Jul 28, 2026 · issued Aug 4, 2026 · completed Aug 5, 2026 · Permit 26 209996 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers Stadium. Install July 25, 2026, Tear Down July 30, 2026
Applied Jul 23, 2026 · issued Jul 27, 2026 · completed Jul 29, 2026 · Permit 26 207663 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers Stadium. Install June 26 2026, Tear Down June 30 2026
Applied Jun 24, 2026 · issued Jun 26, 2026 · completed Jul 10, 2026 · Permit 26 190661 TPS
- Closed
Temporary structure · Temporary structures
Proposed Construct one temporary demountable stage for Rogers stadiumSet up: Jun. 14 2026; Tear Down: Jun 17, 2026.
Applied Jun 11, 2026 · issued Jun 15, 2026 · completed Jun 16, 2026 · Permit 26 182803 TPS
- Permit issued
Temporary structure · Temporary structures
Construct one temporary demountable stage for Rogers stadiumSet up: June 11, 2026; Tear Down: Jun 14, 2026.- Mumford and Sons
Applied Jun 9, 2026 · issued Jun 12, 2026 · Permit 26 180477 TPS
- Closed
Temporary structure · Temporary structures
Revision: Quantity (4) wooden pergolas, off-the-shelf structure. These will be positioned adjacent to the Tour Catering tent. They will be anchored into the concrete with tapcon screws. Install date: May 13, 2026 Dismantle date: October 1, 2026.
Applied May 20, 2026 · issued May 22, 2026 · completed May 22, 2026 · Permit 26 115081 TPS (revision 01)
Show 71 more permits
- Closed
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers stadium.Set up: May 16, 2026; Tear Down: Jun 8, 2026.
Applied May 19, 2026 · issued May 21, 2026 · completed May 25, 2026 · Permit 26 162990 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct one temporary demountable stage for Rogers stadium.Set up: Jun 1, 2026; Tear Down: Jun 8, 2026.
Applied May 8, 2026 · issued May 27, 2026 · completed Sep 17, 2026 · Permit 26 157417 TPS
- Permit issued
Temporary structure · Temporary structures
Proposal to construct one temporary demountable structures for Birkenstock at Rogers Stadium. Set up date May 4, 2026; tear down date Sep. 21, 2026
Applied May 5, 2026 · issued Jun 2, 2026 · Permit 26 155456 TPS
- Permit issued
Temporary structure · Temporary structures
Proposal to construct two temporary demountable structures for Monster at Rogers Stadium. Set up date May 4, 2026; tear down date Sep. 21, 2026
Applied May 5, 2026 · issued Jun 2, 2026 · Permit 26 155448 TPS
- Approved
Alternative solution
ALTERNATIVE SOLUTION PROPOSAL TO ADDRESS A DEFFIENCY OUTLINED IN THE OBC NOTICE ASSOCIATED WITH THE ABOVER PERMIT APPLICATION, IN RELATION TO THE STANDPIPE REQUIREMENTS WITHIN TWO AIR SUPPORTED STRUCTURES EXCEEDING 2,500 m².THE PROPOSED CONSTRUCTION OF THESE AIR SUPPORTED STRUCTURES ARE VARY SIMILAR TO OTHERS WITHIN THIS NUMICAPALITY AS WELL AS OTHERS WHICH NO ALTERNATE SOLUTION WAS PROPOSED OR REQUIRED. PLEASE REFER TO CITY OF TORONTO PERMIT APPLICATION NUMBER 19 148348 FOR EXAMPLE.
Applied Apr 23, 2026 · completed May 12, 2026 · Permit 26 149109 ALT
- Closed
Temporary structure · Temporary structures
Temporary structures for open-air concert including Main entry tent, A party compound, Graphic tower/ wall, Container entry archway to replace main entry scaffold wall. Install date: March 16, 2026 Dismantle date: October 1, 2026.
Applied Apr 8, 2026 · issued May 4, 2026 · completed May 21, 2026 · Permit 26 140294 TPS
- Closed
Temporary structure · Other
Proposal for remaining items on site: Scaffold Wayfinding Towers, Scaffold Entrance Walls, Scaffold Wing Walls, -Vip Suites-Additional tents-Recording Studio cabinInstall date: March 16, 2026 Dismantle date: October 1, 2026
Applied Mar 6, 2026 · issued Apr 7, 2026 · completed May 19, 2026 · Permit 26 125623 TPS
- Under review
Temporary structure · Other
Proposal to construct a temporary air supported dome structure - Downsview Premeir Tennis Centre Pickleball CourtConvenience address is 2 Hanover Road
Applied Mar 3, 2026 · Permit 26 124325 TPS
- Closed
Temporary structure · Temporary structures
Temporary open-air concert grandstand structures and a fan plaza with container concession pods and back of house with ground level offices. Install date: March 16, 2026 Dismantle date: October 1, 2026
Applied Feb 9, 2026 · issued Mar 19, 2026 · completed May 22, 2026 · Permit 26 115081 TPS
- Closed
Temporary structure · Temporary structures
Construct temporary demountable stage. Set up date Aug. 31, 2025; tear down date Sep. 15, 2025.
Applied Aug 28, 2025 · issued Aug 29, 2025 · completed Sep 3, 2025 · Permit 25 217611 TPS
- Closed
Temporary structure · Temporary structures
Construct temporary demountable stage. Set up date Aug. 12, 2025; tear down date Sep. 25, 2025.
Applied Jul 28, 2025 · issued Aug 7, 2025 · completed Aug 21, 2025 · Permit 25 201078 TPS
- Closed
Temporary structure · Other temporary tents
Proposal to install temporary tent - Installed 21 July to 30 September 20251_15m x 15m Adams BSA Frame Tent anchored with goncrete anchore on concrete pad with steel
Applied Jul 18, 2025 · issued Jul 21, 2025 · completed Sep 16, 2026 · Permit 25 196119 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct temporary demountable stage. Set up - July 19, 2024, Tear down - Sep. 25, 2025. See Previous Permit 25 149469 TPS 00 TS
Applied Jul 17, 2025 · issued Jul 18, 2025 · completed Jul 22, 2025 · Permit 25 195795 TPS
- Closed
Temporary structure · Temporary structures
Proposal to install 5 TEMPORARY TENTS, Installed 10 July to 30 September 20251_15m x 50m Hoecker Frame Tent anchored with steel stakes - NO WALLS1_15m x 30m Adams BSA Frame Tent anchored with concrete anchore on concrete pad - NO WALLS1_15m Hexadome anchored with strrl stakes - NO WALLS' 1_20' x 45' Pipe Frame Tent amchored with steel stakes- No Walls. 1-12m x 12m NPT Frame Tent Anchored with steel stakes
Applied Jul 8, 2025 · issued Jul 9, 2025 · completed Sep 16, 2026 · Permit 25 190028 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct one stage Set up date July 3, 2025; tear down date Jul. 15, 2025
Applied Jul 3, 2025 · issued Jul 10, 2025 · completed Jul 11, 2025 · Permit 25 187726 TPS
- Approved
Alternative solution
Proposal for an alternative fire supression solution - onsite water storage and pump system
Applied Jun 26, 2025 · completed Jun 26, 2025 · Permit 25 184099 ALT
- Closed
Temporary structure · Temporary structures
REVISION - to fully temporary open air concert seating bowl permit (scaffold grandstands) due to alternative solution using water tanks for on-site fire suppression system instead of connection to Toronto FC Practice & Training Facility fire hydrant. Grandstands to be dismantled in October 2025. Fully Temporary Open Air Concert Seating Bowl constructed of scaffold grandstands.
Applied Jun 26, 2025 · issued Jun 26, 2025 · completed Jul 8, 2025 · Permit 24 214011 TPS (revision 01)
- Closed
Temporary structure · Temporary structures
Proposal to erect one stage/truss structure and 3 truss structures for Rogers Stadium - Live Nation CanadaSet up date June 20, 2025; tear down date Sep. 25, 2025
Applied Jun 25, 2025 · issued Jun 26, 2025 · completed Jun 30, 2025 · Permit 25 183733 TPS
- Closed
Temporary structure · Temporary structures
Construct one temporary demountable structure for Birkenstock at Rogers Stadium. Set up date June 20, 2025; tear down date Sep. 25, 2025
Applied Jun 5, 2025 · issued Jun 23, 2025 · completed Jun 30, 2025 · Permit 25 172455 TPS
- Closed
Temporary structure · Temporary structures
Proposal to construct three temporary demountable structures. Set up date June 20, 2025; tear down date Sep. 25, 2025.
Applied May 29, 2025 · issued Jun 26, 2025 · completed Jun 27, 2025 · Permit 25 167229 TPS
- Closed
Temporary structure · Temporary structures
Construct two temporary demountable structures. Set up date June 20, 2025; tear down date Sep. 25, 2025 - Rogers Stadium
Applied May 21, 2025 · issued Jun 26, 2025 · completed Jun 30, 2025 · Permit 25 162732 TPS
- Closed
Temporary structure · Temporary structures
Proposed two scaffolding structures in the main entry facade and guest services for a temporary open air concert venue. Install date May 5, 2025. Dismantle: maximum 26 weeks after installation.
Applied Apr 29, 2025 · issued May 26, 2025 · completed Jun 23, 2025 · Permit 25 151126 TPS
- Closed
Temporary structure · Temporary structures
Construct temporary demountable stage. Set up date June 23, 2025; tear down date Sep. 25, 2025
Applied Apr 25, 2025 · issued Jun 9, 2025 · completed Jun 30, 2025 · Permit 25 149469 TPS
- Closed
Temporary structure · Temporary structures
A Party Compound and VIP Suites fabricated with Infinite Structures system. A Party Compound to be installed May 22-May 27, 2025. VIP Suites to be installed May 22-June 6, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION.
Applied Apr 3, 2025 · issued May 26, 2025 · completed Jun 25, 2025 · Permit 25 139103 TPS
- Closed
Temporary structure · Temporary structures
Proposal to erect 15 tents to be installed April 1 to May 26, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION.
Applied Apr 2, 2025 · issued Apr 30, 2025 · completed Jun 27, 2025 · Permit 25 138514 TPS
- Closed
Temporary structure · Temporary structures
Container merchandise and concession pods to be installed May 8th-30th, 2025. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION.
Applied Mar 20, 2025 · issued May 28, 2025 · completed Jun 25, 2025 · Permit 25 132080 TPS
- Closed
Temporary structure · Other temporary tents
Proposal: 13 tent structures with various floor areas. Erection greater than 31 days. ALL STRUCTURES TO BE DISMANTLED MAXIMUM 26 WEEKS AFTER INSTALLATION.Tents to be installed April 1-May 26, 2025. BaAM Office Trailer to be installed March 31, 2025. Remaining Office Trailers to be installed April 14-28, 2025. GLOs (Ground Level Office) to be installed May 19-26, 2025.
Applied Mar 18, 2025 · issued May 26, 2025 · completed Jun 25, 2025 · Permit 25 130928 TPS
- Closed
Temporary structure · Temporary structures
Fully Temporary Open Air Concert Seating Bowl constructed of scaffold grandstands.
Applied Sep 17, 2024 · issued Nov 14, 2024 · completed Jul 8, 2025 · Permit 24 214011 TPS
- Closed
Fire and security upgrade · Fire alarm
Proposed upgrades to the existing life and safety systems. Installing additional exit signs, panic bar hardware, and adding/relocating manual pull stations.
Applied Aug 22, 2024 · issued Aug 23, 2024 · completed Sep 20, 2024 · Permit 24 202292 FSU
- Cancelled
Addition or alteration · Interior alterations
Proposal for interior alterations to demolish existing washrooms and offices - Bay 12 Art Centre, Downsview Airport. See also 24 105377 ZAPConveinece address is 30 Hanover Rd.
Applied Apr 23, 2024 · completed Feb 25, 2026 · Permit 24 139357 BLD
- Closed
Addition or alteration · Interior alterations
Revision #02 - Proposed changes in regards to the 2HR rated assembly protecting the new columns in the demising wall between tenants.Minor revisions to 2nd floor door/partitioning to alter required occupancy limit signage.Removal of 0HR rating to janitor rooms included on approved permit (not needed, building is sprinklered)Inclusion of updated Door Schedule to coordinate with approved permit plan design.
Applied Apr 17, 2024 · issued May 2, 2024 · completed Jun 20, 2024 · Permit 23 153514 BLD (revision 02)
- Closed
Heating and ventilation
REVISION TO EXISTING OPEN PERMIT 23_153514HVA00MS. (Please see attached cover letter)HVAC tenant fit-out of the project are now included (both ground and second)
Applied Nov 22, 2023 · issued Dec 18, 2023 · completed Jun 6, 2024 · Permit 23 153514 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
Minor revisions to 2nd floor door/partitioning to alter required occupancy limit signage.Removal of 0HR rating to janitor rooms included on approved permit (not needed, building is sprinklered)Inclusion of updated Door Schedule to coordinate with approved permit plan design.
Applied Nov 6, 2023 · issued Dec 20, 2023 · completed Jun 20, 2024 · Permit 23 153514 BLD (revision 01)
- Cancelled
Fire and security upgrade · Fire alarm
Proposed fire alarm replacement for tenant fit-out in an existing office space, in a aircraft hanger.
Applied May 31, 2023 · completed Nov 8, 2023 · Permit 23 153516 FSU
- Closed
Plumbing
Plumbing - Proposed interior demolition to an existing office space for future tenant fit-out and upgrade sprinklers and fire alarm.
Applied May 31, 2023 · issued Aug 15, 2023 · completed Jun 6, 2024 · Permit 23 153514 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior demolition to an existing office space for future tenant fit-out and upgrade sprinklers and fire alarm.
Applied May 31, 2023 · issued Aug 16, 2023 · completed Jun 20, 2024 · Permit 23 153514 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior demolition to an existing office space for future tenant fit-out and upgrade sprinklers and fire alarm.
Applied May 31, 2023 · issued Aug 15, 2023 · completed Jun 6, 2024 · Permit 23 153514 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposed Backflow Prevention Devices (Water only)for water mains.
Applied Feb 27, 2020 · issued Apr 22, 2020 · completed Dec 22, 2023 · Permit 20 120066 PSA
- Closed
Plumbing · Other
As per a Notice of Violation received from Toronto Water, all fixtures in the cafeteria's must pass thorugh the grease interceptor. The modification will redirect the cafeteria drains in the existing sanitary line to the grease interceptor and run a seperate line for the washroom drains into the sanitary line.
Applied Mar 6, 2018 · issued Apr 16, 2018 · completed Apr 19, 2018 · Permit 18 125276 PSA
- Cancelled
Fire and security upgrade
FS - Sprinkler Shop Drawing - Construction of air craft assembly facility with attached three storey office space to Bomardier Aerospace Site Facilites Development.
Applied Jan 21, 2014 · completed Apr 3, 2019 · Permit 13 251923
- Closed
New building
New below grade storm water Tank
Applied Nov 8, 2013 · issued Feb 11, 2014 · completed Dec 21, 2023 · Permit 13 262983 BLD
- Cancelled
Drains and site services · Inside and outside drains
Drain - Site service for Construction of air craft assembly facility with attached three storey office space to Bomardier Aerospace Site Facilites Development.
Applied Oct 17, 2013 · completed Apr 3, 2019 · Permit 13 251923 STS
- Cancelled
Plumbing
Plumbing - Construction of air craft assembly facility with attached three storey office space to Bomardier.
Applied Oct 17, 2013 · completed Apr 3, 2019 · Permit 13 251923 PLB
- Cancelled
Heating and ventilation
HVAC - Construction of air craft assembly facility with attached three storey office space to Bomardier.
Applied Oct 17, 2013 · completed Apr 3, 2019 · Permit 13 251923 HVA
- Cancelled
New building
Construction of air craft assembly facility with attached three storey office space to Bomardier Aerospace Site Facilites Development.
Applied Oct 17, 2013 · completed Apr 3, 2019 · Permit 13 251923 BLD
- Closed
Fire and security upgrade · Fire alarm
Fire Alarm System Upgrade to Bomadier Aerospace
Applied Oct 2, 2012 · issued Feb 21, 2013 · completed Aug 1, 2018 · Permit 12 256760 FSU
- Closed
Addition or alteration · Interior alterations
Retrofit Bombardier office space in Bay 11.
Applied Jul 18, 2012 · issued Jan 8, 2013 · completed Aug 2, 2018 · Permit 12 213646 BLD
- Closed
Plumbing
Plumbing - Retrofit existing Bombardier office space in Bay 11.
Applied Jul 18, 2012 · issued Jan 8, 2013 · completed Aug 2, 2018 · Permit 12 213646 PLB
- Closed
Heating and ventilation
HVAC - Retrofit existing Bombardier office space in Bay 11.
Applied Jul 18, 2012 · issued Jan 8, 2013 · completed Aug 2, 2018 · Permit 12 213646 HVA
- Closed
Addition or alteration · Interior alterations
Bombardier Bay 6 - Convert production area into auditorium area on 2nd floor.
Applied Apr 25, 2012 · issued Aug 7, 2012 · completed Aug 2, 2018 · Permit 12 161208 BLD
- Closed
Addition or alteration · Canopy w/o enclosure
Bombardier- Canopy with turnstiler
Applied Jun 24, 2011 · issued Apr 25, 2012 · completed Aug 2, 2018 · Permit 11 226786 BLD
- Closed
Heating and ventilation
HVAC - Bombardier - Bay 3 - Lunchroom and Locker renovation
Applied May 27, 2011 · issued Aug 10, 2011 · completed Jul 4, 2018 · Permit 11 202384 HVA
- Closed
Plumbing
Plumbing - Bombardier - Bay 3 - Lunchroom and Locker renovation
Applied May 27, 2011 · issued Aug 8, 2011 · completed Jul 4, 2018 · Permit 11 202384 PLB
- Closed
Addition or alteration · Interior alterations
Bombardier - Bay 3 - Lunchroom and Locker renovation
Applied May 25, 2011 · issued Aug 8, 2011 · completed Aug 2, 2018 · Permit 11 202384 BLD
- Closed
Addition or alteration · Interior alterations
Bombardier - Bay 2 - Washroom renovation
Applied May 25, 2011 · issued Jul 12, 2011 · completed Jun 15, 2018 · Permit 11 202416 BLD
- Closed
Addition or alteration · Interior alterations
Add new windows - Building 6 - Bombardier
Applied May 5, 2011 · issued May 11, 2011 · completed Jul 27, 2018 · Permit 10 294723 BLD (revision 01)
- Closed
Plumbing · Backflow prevention devices (Water only)
Bay 12 Pump House - backflow prevention device
Applied Mar 4, 2011 · issued Mar 8, 2011 · completed Jun 1, 2018 · Permit 11 138357 PSA
- Closed
Plumbing · Backflow prevention devices (Water only)
Main Pump House - backflow prevention device
Applied Mar 4, 2011 · issued Mar 9, 2011 · completed Jun 1, 2018 · Permit 11 138360 PSA
- Refusal notice
Addition or alteration · Interior alterations
Revise - Bombardier Aerospace - Modifications to bay 9 ( Review Bubble area only)
Applied Feb 8, 2011 · Permit 10 218940 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Interior alteration to accomodate Tim Horton food service at Bombadier
Applied Nov 12, 2010 · issued Apr 1, 2011 · completed Aug 2, 2018 · Permit 10 294723 HVA
- Closed
Addition or alteration · Interior alterations
Interior alteration to accomodate Tim Horton food service at Bombardier
Applied Nov 10, 2010 · issued Mar 10, 2011 · completed Jul 27, 2018 · Permit 10 294723 BLD
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Open convenience stair, balcony and guardrail and second floor office ara - Bombardier - Bay 9
Applied Aug 17, 2010 · Permit 10 218940
- Inspections under way
Addition or alteration · Interior alterations
Open convenience stair, balcony and guardrail and second floor office ara - Bombardier - Bay 9
Applied Jul 13, 2010 · issued Aug 18, 2010 · Permit 10 218940 BLD
- Closed
Heating and ventilation
HVAC - Convert existing open mezzanine space from manufacturing to office/cafeteria space
Applied Oct 22, 2009 · issued Nov 18, 2009 · completed Jun 14, 2018 · Permit 09 175442 HVA
- Closed
Fire and security upgrade · Electromagnetic locks
Bombardier Aerospace Canada - ground floor
Applied Jun 16, 2008 · issued Jul 15, 2008 · completed Aug 2, 2018 · Permit 08 170862 FSU
- Closed
Heating and ventilation · Special ventilation system
Generator room ventilation for Aerospace building, Bay 12 - Bombardier Inc
Applied Mar 3, 2008 · issued Mar 4, 2008 · completed Aug 2, 2018 · Permit 08 116059 MSA
- Application received
Non-residential building permit · Addition/Alteration to existing building
Con of a lunchroom.
Applied Oct 5, 1999 · Permit 99 101147 000
- Closed
Addition or alteration · Other
Six 20x20 & 40x60 tents
Applied May 7, 1999 · issued Feb 5, 2001 · completed Aug 2, 2018 · Permit 99 251179 BLD
- Closed
Addition or alteration · Interior alterations
Data centre flight test
Applied Jun 13, 1996 · issued Dec 25, 1996 · completed Aug 2, 2018 · Permit 96 251109 BLD
- Closed
Plumbing
17 FIX
Applied Oct 25, 1995 · issued Oct 25, 1995 · completed Dec 21, 2023 · Permit 95 251223 PLB
- Closed
Addition or alteration · Addition(s)
Chiller plant addition
Applied Jun 14, 1991 · issued Dec 25, 1991 · completed Aug 1, 2018 · Permit 91 251005 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To permit two air-supported indoor sports domes. The lands are subject to holding provisions as identified in Site-Specific Zoning By-law No. 707-2024. The proposed recreation use is not permitted until the holding symbol (H) has been lifted.
Decision: Approved (hearing Aug 20, 2026)
Filed Jul 8, 2026 · File A0248/26NY
What’s planned nearby
Development sites within 500 m
- Under review
Not stated in the file
170 m away · Rezoning · Under review · filed Jul 21, 2026
- Approved
23 storeys · 2,957 homes · Residential
170 m away · Subdivision · Approved · filed May 18, 2022
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
130 Gilley Rd · Minor variance
To construct a rear one-storey addition, in conjunction with a new second storey addition over the existing one-storey dwelling. The applicant is also proposing a new attached garage along with other interior and exterior alterations.
220 m away · filed Dec 21, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.