123 Wilmington Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a 2 storey rear addition, 2nd floor addition over existing, enclose front porch, new side covered porch, new walkout, new deck at rear, interior alterations, and detached garage at rear. See ZZC.

    Applied May 8, 2018 · issued May 22, 2018 · completed Apr 18, 2019 · Permit 17 165271 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a 2 storey rear addition, 2nd floor addition over existing, enclose front porch, new side covered porch, new walkout, new deck at rear, interior alterations, and detached garage at rear. See ZZC.

    Applied May 24, 2017 · issued Aug 9, 2017 · completed Jun 28, 2019 · Permit 17 165271 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct a 2 storey rear addition, 2nd floor addition over existing, enclose front porch, new side covered porch, new walkout, new deck at rear, interior alterations, and detached garage at rear. See ZZC.

    Applied May 24, 2017 · issued Aug 9, 2017 · completed Aug 27, 2021 · Permit 17 165271 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to build an new attached garage, 2nd floor addition above garage, interior alteration to the ground and basement level, new porch and basement walkout to existing dwelling.

    Applied Oct 28, 2015 · issued Feb 16, 2016 · completed Aug 10, 2017 · Permit 15 242486 PLB

    Cancelled
  • Small residential project · Multiple projects

    Proposal to build an new attached garage, 2nd floor addition above garage, interior alteration to the ground and basement level, new porch and basement walkout to existing dwelling.

    Applied Oct 26, 2015 · issued Feb 16, 2016 · completed Aug 10, 2017 · Permit 15 242486 BLD

    Cancelled
  • Drains and site services · Back water valve (Sewer only)

    Install one 4" MAINLINE FULLPORT backwater valve and sump pump

    Applied Oct 7, 2014 · issued Oct 7, 2014 · completed Jun 12, 2017 · Permit 14 234222 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 247 Brighton Ave · Minor variance

    To permit the dwelling currently under construction.

    160 m away · filed Jul 27, 2023 · Approved

  • 183 Brighton Ave · Minor variance

    Proposal to construct second storey addition, new front porch and rear roof canopy onto existing dwelling.

    250 m away · filed Dec 6, 2022 · Approved

  • 104 Combe Ave · Minor variance

    To construct a new dwelling.

    180 m away · filed Jan 26, 2022 · Approved

  • 199 Searle Ave · Minor variance

    To enclose the existing porch.

    200 m away · filed Mar 18, 2021 · Approved

  • 178 Acton Ave · Minor variance

    To construct a new dwelling.

    60 m away · filed Dec 3, 2020 · Approved

  • 109 Clifton Ave · Minor variance

    To construct a rear and front addition to the existing dwelling, in conjunction with a front porch and a rear deck.

    200 m away · filed Dec 18, 2019 · Approved

  • 249 Brighton Ave · Minor variance

    To construct a new dwelling

    180 m away · filed Apr 25, 2019 · Refused

  • 247 Brighton Ave · Consent

    The obtain consent to sever the property into three undersized residential lots.

    160 m away · filed Apr 25, 2019 · Refused

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.