Toronto address · Ward 6, York Centre
183 Brighton Ave
The City of Toronto has 6 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
REVISION 01:HVAC - Second storey addition, interior alterations, front porch and rear frame canopy
Applied Sep 25, 2023 · issued Oct 6, 2023 · completed Jul 29, 2024 · Permit 23 139190 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Second storey addition, interior alterations, front porch and rear frame canopy
Applied May 1, 2023 · issued May 9, 2023 · completed Jul 29, 2024 · Permit 23 139190 HVA
- Inspections under way
Small residential project · Multiple projects
Second storey addition, interior alterations, front porch and rear frame canopy
Applied Apr 28, 2023 · issued May 9, 2023 · Permit 23 139190 BLD
- Closed
Plumbing
Plumbing - Second storey addition, interior alterations, front porch and rear frame canopy
Applied Apr 28, 2023 · issued May 9, 2023 · completed Jul 29, 2024 · Permit 23 139190 PLB
- Closed
Drains and site services
Drain - Second storey addition, interior alterations, front porch and rear frame canopy
Applied Apr 28, 2023 · issued May 9, 2023 · completed Sep 29, 2023 · Permit 23 139190 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of a back water valve
Applied Oct 25, 2021 · issued Oct 25, 2021 · completed Nov 10, 2021 · Permit 21 230202 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
Proposal to construct second storey addition, new front porch and rear roof canopy onto existing dwelling.
Decision: Approved (hearing Feb 16, 2023)
Filed Dec 6, 2022 · File A0795/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
145 Brighton Ave · Minor variance
To Widen the Garage Driveway.
230 m away · filed Mar 26, 2025 · Approved
178 Waterloo Ave · Minor variance
Proposal to construct a new dwelling.
130 m away · filed Aug 15, 2022 · Approved
81 Combe Ave · Minor variance
To construct a first and second storey addition to the side of the existing dwelling.
190 m away · filed Jun 9, 2021 · Approved
81 Combe Ave · Minor variance
Proposed interior alterations and 2-storey addition to an existing single family detached dwelling.
190 m away · filed Oct 16, 2020 · Refused
153 Brighton Ave · Minor variance
To construct a front two-storey addition, in conjunction with a second storey addition over the existing dwelling.
160 m away · filed Sep 11, 2019 · Approved
56 Goddard St · Minor variance
To construct a new detached dwelling.
250 m away · filed Jan 17, 2019 · Approved
143 Waterloo Ave · Minor variance
To construct a new dwelling.
240 m away · filed Sep 11, 2018 · Approved
127 Searle Ave · Minor variance
To legalize and maintain the dwelling as constructed. The dwelling was not constructed in accordance with the issued building permit.
240 m away · filed Dec 8, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.