Toronto address · Ward 6, York Centre
81 Combe Ave
The City of Toronto has 5 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
REVISION - changing from a two storey renovation to a one-storey renovationPROPOSED Ground and full second floor additions and interior alterations
Applied Nov 28, 2022 · issued Apr 26, 2023 · completed Apr 3, 2024 · Permit 22 102719 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - PROPOSED Ground and full second floor additions and interior alterations
Applied Nov 23, 2022 · issued Jan 5, 2023 · completed Mar 28, 2024 · Permit 22 102719 HVA
- Closed
Plumbing
PROPOSED Ground and full second floor additions and interior alterations
Applied Jan 11, 2022 · issued Jan 5, 2023 · completed Mar 28, 2024 · Permit 22 102719 PLB
- Closed
Small residential project · Multiple projects
PROPOSED Ground and full second floor additions and interior alterations
Applied Jan 11, 2022 · issued May 6, 2022 · completed Apr 3, 2024 · Permit 22 102719 BLD
- Cancelled
Small residential project · Addition(s)
Proposed interior alterations and 2-storey addition to an existing single family detached dwelling.
Applied Jul 26, 2019 · completed Jul 7, 2025 · Permit 19 195955 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a first and second storey addition to the side of the existing dwelling.
Decision: Approved (hearing Aug 5, 2021)
Filed Jun 9, 2021 · File A0431/21NY
- Closed
Minor variance · R addition
Proposed interior alterations and 2-storey addition to an existing single family detached dwelling.
Decision: Refused (hearing Jan 28, 2021)
Filed Oct 16, 2020 · File A0544/20NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
145 Brighton Ave · Minor variance
To Widen the Garage Driveway.
250 m away · filed Mar 26, 2025 · Approved
45 Acton Ave · Minor variance
Proposal to construct a deck in the rear yard of a single family detached dwelling.
240 m away · filed Dec 8, 2022 · Approved
183 Brighton Ave · Minor variance
Proposal to construct second storey addition, new front porch and rear roof canopy onto existing dwelling.
190 m away · filed Dec 6, 2022 · Approved
104 Combe Ave · Minor variance
To construct a new dwelling.
180 m away · filed Jan 26, 2022 · Approved
153 Brighton Ave · Minor variance
To construct a front two-storey addition, in conjunction with a second storey addition over the existing dwelling.
210 m away · filed Sep 11, 2019 · Approved
45 Acton Ave · Minor variance
To construct a second storey addition over the existing dwelling, in conjunction with other interior and exterior alterations.
240 m away · filed Apr 25, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.