Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1233 St Clair Ave W

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a 3-storey, mixed-use building containing retail and office uses.

    Decision: Approved (hearing Mar 31, 2016)

    Filed Mar 1, 2016 · File A173/16EYK

    OMB appeal

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Mackay Ave · Minor variance

    To construct a new two-storey detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. This ancillary building will have a partially cantilevered second storey (at the west portion of the building), and canopies at the north and south sides of the building. There will be a total of five residential dwelling units on this lot (four units within the main detached dwelling and one unit within the ancillary building).

    180 m away · filed Feb 6, 2026 · Approved

  • 93 Mackay Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) by constructing a complete second storey addition for the purposes of constructing one laneway suite. The existing parking space will be maintained.

    150 m away · filed Jan 15, 2024 · Approved

  • 26 Mackay Ave · Minor variance

    To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.

    120 m away · filed May 10, 2022 · Approved

  • 156 Rosemount Ave · Minor variance

    To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.

    160 m away · filed Oct 5, 2021 · Approved

  • 43 Norton Ave · Minor variance

    To construct a rear detached garage.

    110 m away · filed Aug 25, 2021 · Refused

  • 53 Boon Ave · Minor variance

    To alter the existing 2½-storey semi-detached dwelling by constructing: a partial second storey addition; a third storey addition; a front basement walkout; front and rear second storey balconies; and a rear third storey balcony. Also, this dwelling will contain 4 dwelling units (1 primary and 3 secondary suites).

    180 m away · filed Jun 30, 2021 · Approved

  • 1626 Dufferin St · Minor variance

    To convert the existing triplex into a fourplex. The proposal includes constructing a fourth storey addition with front and rear balconies. Also, the garage will be converted for bicycle parking spaces.

    240 m away · filed Jun 18, 2021 · Approved

  • 1640 Dufferin St · Minor variance

    To convert the existing single family, two-storey detached dwelling into a two-unit, three-storey detached dwelling by constructing a rear two-storey addition, a full third-storey addition, a rear basement walkout, a rear ground floor deck, and rear second and third storey balconies. A new rear detached garage will also be constructed.

    220 m away · filed Apr 15, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.