Toronto address · Ward 9, Davenport
1626 Dufferin St
The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposal for multiple projects to an existing 2 storey detached dwelling with 3 units. Scope of work includes a 3rd floor addition, front 3rd floor balcony, rear 3rd floor balcony, 1 additional residential unit for a total of 4 units. See also 21 132401 ZZC and 21 172990 MV.
Applied Sep 28, 2022 · issued Apr 13, 2023 · 1 home added · Permit 22 210241 BLD
- Revocation pending
Heating and ventilation
HVAC - Proposal for multiple projects to an existing 2 storey detached dwelling with 3 units. Scope of work includes a 3rd floor addition, front 3rd floor balcony, rear 3rd floor balcony, 1 additional residential unit for a total of 4 units. See also 21 132401 ZZC and 21 172990 MV.
Applied Sep 28, 2022 · issued Apr 13, 2023 · Permit 22 210241 HVA
- Revocation pending
Plumbing
Plumbing - Proposal for multiple projects to an existing 2 storey detached dwelling with 3 units. Scope of work includes a 3rd floor addition, front 3rd floor balcony, rear 3rd floor balcony, 1 additional residential unit for a total of 4 units. See also 21 132401 ZZC and 21 172990 MV.
Applied Sep 28, 2022 · issued Apr 13, 2023 · Permit 22 210241 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To convert the existing triplex into a fourplex. The proposal includes constructing a fourth storey addition with front and rear balconies. Also, the garage will be converted for bicycle parking spaces.
Decision: Approved (hearing Apr 27, 2022)
Filed Jun 18, 2021 · File A0812/21TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
1525 Dufferin St · Minor variance
250 m away · filed May 11, 2026 · Postponed
47 Northcliffe Blvd · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear one-storey addition (sunroom). The existing rear one-storey ancillary building (garage) will be maintained and unaltered.
220 m away · filed Feb 7, 2025 · Approved
26 Mackay Ave · Minor variance
To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.
150 m away · filed May 10, 2022 · Approved
45 Via Italia · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.
220 m away · filed Apr 7, 2022 · Approved
156 Rosemount Ave · Minor variance
To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.
100 m away · filed Oct 5, 2021 · Approved
1640 Dufferin St · Minor variance
To convert the existing single family, two-storey detached dwelling into a two-unit, three-storey detached dwelling by constructing a rear two-storey addition, a full third-storey addition, a rear basement walkout, a rear ground floor deck, and rear second and third storey balconies. A new rear detached garage will also be constructed.
40 m away · filed Apr 15, 2021 · Approved
32 Peterborough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and to convert the one-unit building to a two-unit building.
170 m away · filed Mar 23, 2021 · Approved
44 Peterborough Ave · Minor variance
To alter the two-storey detached house by constructing a front three-storey addition and a front basement walkout.
200 m away · filed Aug 20, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.