Toronto address · Ward 9, Davenport
32 Peterborough Ave
The City of Toronto has 7 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Examiner's notice sent
Small residential project · Garage
Revision: plans with drop on the garage south elevation
Applied Oct 20, 2025 · Permit 23 234374 BLD (revision 04)
- Cancelled
Small residential project · Garage
Rev 03 - Revision of the above permit (plans with drop on the garage south elevation).Revision #02 - addition of side doorproposing to rebuild existing garage
Applied Dec 23, 2024 · completed Oct 7, 2025 · Permit 23 234374 BLD (revision 03)
- Revision issued
Small residential project · Garage
Revision #02 - addition of side doorproposing to rebuild existing garage
Applied Sep 5, 2024 · issued Sep 25, 2024 · Permit 23 234374 BLD (revision 02)
- Revision issued
Small residential project · Garage
Revision #01 - Proposed change of location of the garage.proposing to rebuild existing garage
Applied Mar 15, 2024 · issued Mar 27, 2024 · Permit 23 234374 BLD (revision 01)
- Inspections under way
Small residential project · Garage
proposing to rebuild existing garage
Applied Dec 11, 2023 · issued Feb 27, 2024 · Permit 23 234374 BLD
- Revocation pending
Plumbing
Plumbing - Proposal for 2 units in the building, interior alterations, construct a rear two-storey addition, and new wood deck in the rear.
Applied Sep 30, 2021 · issued Oct 5, 2022 · Permit 21 220089 PLB
- Permit issued
Small residential project · Multiple projects
Proposal to creat a second unit, interior alterations, construct a rear two-storey addition, and new wood deck in the rear.
Applied Sep 30, 2021 · issued Oct 5, 2022 · 1 home added · Permit 21 220089 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition and to convert the one-unit building to a two-unit building.
Decision: Approved (hearing Jul 21, 2021)
Filed Mar 23, 2021 · File A0401/21TEY
What’s planned nearby
Development sites within 500 m
- Submitted
9 storeys · 60 homes · Residential
460 m away · Site plan · Submitted · filed Jul 29, 2026
Neighbours’ Committee of Adjustment files within 250 m
1525 Dufferin St · Minor variance
160 m away · filed May 11, 2026 · Postponed
54 Peterborough Ave · Minor variance
To alter the existing two-storey mixed-use building by constructing a complete third storey addition, a rear three-storey addition, and a front third storey balcony. Also, to permit residential and personal service (salon) uses on this lot. There will be a total of three residential dwelling units, and one commercial unit (salon) on this lot (the residential dwelling units will occupy the basement, first, second, and third levels, and the commercial unit will occupy the basement and first levels). The existing on-site parking will be removed.
130 m away · filed May 15, 2025 · Approved
2 Westmount Ave · Minor variance
To convert the existing detached garage, accessed from Regal Road, into a two-storey garden suite by constructing a second storey addition (cantilevered on the east side), located at the rear of the existing two-and-one-half-storey, three-unit, detached main dwelling (triplex). Also, to retain two existing parking spaces (one of which is undersized) on the lot, abutting Regal Road. There will be a total of four residential dwelling units on the lot.
200 m away · filed May 31, 2024 · Approved
54 Peterborough Ave · Minor variance
To alter the existing two-storey mixed-use detached building (one retail (convenience) store and one residential unit) by constructing side exterior stairs (fronting Via Italia).
130 m away · filed Jun 30, 2023 · Approved
87 Peterborough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front basement walkout which will lead to a secondary suite.
210 m away · filed Mar 17, 2023 · Approved
1502 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a third storey deck. Also, to convert this dwelling from two-units into four-units (one primary unit and three secondary suites).
160 m away · filed Apr 11, 2022 · Approved
45 Via Italia · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.
110 m away · filed Apr 7, 2022 · Approved
156 Rosemount Ave · Minor variance
To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.
180 m away · filed Oct 5, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.