Toronto address · Ward 14, Toronto-Danforth
124 Bertmount Ave
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Construct interior alterations, relocate window and door on west wall
Applied Apr 29, 2016 · issued May 2, 2016 · Permit 16 148033 PLB
- Inspections under way
Small residential project · Interior alterations
Construct interior alterations, relocate window and door on west wall
Applied Apr 29, 2016 · issued May 2, 2016 · Permit 16 148033 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
27 Brooklyn Ave · Minor variance
250 m away · filed Aug 21, 2026 · Postponed
99 Dagmar Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).
160 m away · filed Jun 17, 2026 · Hearing scheduled
12 Audley Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.
140 m away · filed Jun 17, 2026 · Approved
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
170 m away · filed Apr 23, 2026 · Approved
22 Galt Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear one-storey ground floor addition, a deck with stairs and a rear basement walkout.
190 m away · filed Mar 5, 2026 · Approved
75 Badgerow Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch with stairs.
150 m away · filed May 27, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
230 m away · filed Apr 22, 2025 · Approved
53 Bertmount Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.
210 m away · filed Apr 14, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.