Toronto address · Ward 9, Davenport
125 Lisgar St
The City of Toronto has 2 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Small residential project · Multiple projects
Proiposed interior alterations to convert an existing single family detached dwelling into a 2-unit dwelling, 3-storey addition in the side yard and thrid storey addition.
Applied Jul 19, 2023 · issued Jul 2, 2024 · 1 home added · Permit 23 177067 BLD
- Permit issued
Heating and ventilation
HVAC - Proiposed interior alterations to convert an existing single family detached dwelling into a 2-unit dwelling, 3-storey addition in the side yard and thrid storey addition.
Applied Jul 19, 2023 · issued Jul 2, 2024 · Permit 23 177067 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear balcony, and one and two-storey rear additions. This dwelling will contain one primary unit and one secondary suite (which will be located within the basement with a front walkout).
Decision: Approved (hearing Feb 8, 2023)
Filed Oct 17, 2022 · File A1148/22TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
29 storeys · 272 homes · Mixed use
150 m away · Rezoning · Under appeal · filed Oct 3, 2023
- Under appeal
27 storeys · 367 homes · Mixed use
210 m away · Rezoning · Under appeal · filed Nov 13, 2024
- Under review
3 storeys · 2 homes · Residential
220 m away · Condominium · Under review · filed Jan 19, 2024
- Under review
6 storeys · 28 homes · Residential
310 m away · Site plan · Under review · filed Dec 10, 2021
Neighbours’ Committee of Adjustment files within 250 m
61 Northcote Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a cantilevered side (north) bay window, and a rear balcony. Also, to alter the existing rear one-storey semi-detached ancillary building (one-car garage abutting the laneway) by constructing a complete second storey addition (containing storage space).
220 m away · filed Jul 29, 2026 · Hearing scheduled
18 Beaconsfield Ave · Minor variance
To legalize and to maintain the existing rear two-storey ancillary building (containing a one-car garage, and one laneway suite), abutting the laneway. This building was constructed without an authorized building permit. There is a total of two residential dwelling units on this lot (one unit within the main building, and one unit within the ancillary building).
140 m away · filed Jul 8, 2026 · Hearing scheduled
144 Dovercourt Rd · Minor variance
To alter the existing rear two-storey ancillary building (containing two laneway suites), as approved by Minor Variance Decision Number A0641/25TEY, by constructing a second storey landing and stairs on the east side of this building. There will be a total of five residential dwelling units on this lot (three dwelling units within the main house and two dwelling units within the ancillary building).
90 m away · filed Feb 25, 2026 · Approved
11 Northcote Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex), with side (south) cantilevered second and third storeys, a rear covered ground floor deck with stairs, a front second storey balcony, front third storey balcony, a rear second storey balcony, front and rear basement walkouts with patios and a side (north) basement level patio. Also, to construct a new two-storey ancillary building (containing one Laneway suite) with a rear (east) cantilevered second storey, in the rear yard abutting the laneway There will be a total of five residential dwelling units on this lot (four units within…
210 m away · filed Dec 29, 2025 · Approved
167 Argyle St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (west) one-storey addition, including a basement addition, and a rear ground floor deck. Also, to construct one vehicular parking space, located in the rear yard of the property, abutting the laneway.
200 m away · filed Dec 22, 2025 · Approved
131 Dovercourt Rd · Minor variance
To construct a new rear two-storey ancillary building (containing two laneway suites), with exterior stairs and a platform providing access to the second unit, abutting the laneway. The existing one-storey detached garage will be demolished. The existing three-storey semi-detached dwelling containing four residential dwelling units is currently under construction. There will be a total of six residential dwelling units on this lot.
110 m away · filed Dec 2, 2025 · Approved
155 Dovercourt Rd · Minor variance
To permit an eating establishment use, located within a portion of the ground floor of the existing mixed-use detached building (which is currently under construction (for a third storey addition), as approved under Minor Variance Decision A0162/25TEY). There will be a total of four residential dwelling units, one retail use, and one eating establishment (including take-out) use, on this lot.
160 m away · filed Sep 10, 2025 · Approved
1100 Queen St W · Minor variance
To permit a place of assembly use (private art gallery) on the second floor of the existing two-storey commercial building. The existing ground floor restaurant use, as well as the retail use, will be maintained and unaltered. There will be no parking spaces provided on-site.
90 m away · filed Sep 2, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.