Toronto address · Ward 13, Toronto Centre
127 Church St
The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Addition or alteration · Multiple projects
Interior alterations to existing restaurant suite *McDonalds*
Applied Jul 16, 2020 · issued Jul 23, 2020 · Permit 20 168478 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations *McDonalds*
Applied Jul 16, 2020 · issued Aug 20, 2020 · Permit 20 168478 HVA
- Closed
Plumbing
Plumbing - Interior alterations *McDonalds*
Applied Jul 16, 2020 · issued Aug 20, 2020 · completed Jan 9, 2026 · Permit 20 168478 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install backflow preventer device and expansion tank.
Applied Feb 1, 2018 · issued Feb 26, 2018 · completed May 30, 2018 · Permit 18 112529 PSA
- Inspections under way
Plumbing
Plumbing - Interior alterations to exiting McDonalds restaurant on the ground floor. Less than 30 seats.
Applied Jul 20, 2010 · issued Jul 26, 2010 · Permit 10 218335 PLB
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to exiting McDonalds restaurant on the ground floor. Less than 30 seats.
Applied Jul 13, 2010 · issued Jul 16, 2010 · Permit 10 218335 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
119-127 Church Street and 83-89 Queen Street East
61 storeys · 691 homes · Mixed use
10 m away · Site plan · Under review · filed Aug 4, 2022
- Now selling
- Approved
114-120 Church Street and 59 Richmond Street East
48 storeys · 592 homes · Mixed use
120 m away · Condominium · Approved · filed Mar 4, 2025
- Under review
59 storeys · 480 homes · Mixed use
140 m away · Site plan · Under review · filed Aug 18, 2022
- Under review
- Under appeal
110-112 Adelaide Street East and 85 Lombard Street
65 storeys · 600 homes · Mixed use
210 m away · Site plan · Under appeal · filed Aug 4, 2022
Neighbours’ Committee of Adjustment files within 250 m
30 Bond St · Minor variance
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
190 m away · filed Nov 14, 2025 · Approved
134 Jarvis St · Minor variance
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
190 m away · filed Sep 4, 2025 · Approved
89 Church St · Minor variance
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
120 m away · filed Nov 4, 2024 · Approved
90 Queen St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
120 m away · filed Aug 19, 2024 · Approved
88 Queen St E · Consent
To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.
70 m away · filed Jan 26, 2024 · Approved
30 Mutual St · Consent
To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the south (municipally known as 88 Queen Street East), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.
130 m away · filed Dec 11, 2023 · Approved
88 Queen St E · Consent
To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the north (municipally known as 30 Mutual Street & 25 Dalhousie Street), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.
70 m away · filed Oct 16, 2023 · Approved
88 Queen St E · Minor variance
To permit the increase of residential dwelling units by constructing an additional floor above the current maximum permitted building height of the 51-storey mixed-use building, currently under construction. There will be a total of 587 dwelling units provided.
70 m away · filed Apr 17, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.