Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1275 Danforth Ave

The City of Toronto has 10 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Proposed exterior work for the following: (COA approved decision A0787/24TEY)North Entrance - Accessibility upgrades to the exterior, including new lighting.West Entrance - New accessible parking spaces, drop-off area, and resurfacing.Underground (U/G) Parking: New accessible parking spaces and an accessible connection between the parking level and basement floor.

    Applied Apr 1, 2025 · issued Jun 2, 2025 · Permit 25 137872 BLD

    Permit issued
  • Heating and ventilation

    Hvac - interior common area accessibility upgrades, new entrance doors, floor finishes in vestibules, lobbies, new kitchen in recreation room, new scooter storage, new exercise room, laundry room

    Applied Dec 10, 2024 · issued Jan 10, 2025 · Permit 24 246847 HVA

    Inspections under way
  • Plumbing

    Plumbing - INTERIOR COMMON AREA ACCESSIBILITY UPGRADES, NEW ENTRANCE DOORS, FLOOR FINISHES IN VESTIBULES, LOBBIES, NEW KITCHEN IN RECREATION ROOM, NEW SCOOTER STORAGE, NEW EXERCISE ROOM, LAUNDRY ROOM

    Applied Dec 10, 2024 · issued Jan 10, 2025 · Permit 24 246847 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior common area accessibility upgrades, new entrance doors, floor finishes in vestibules, lobbies, new kitchen in recreation room, new scooter storage, new exercise room, laundry room

    Applied Dec 4, 2024 · issued Jan 10, 2025 · Permit 24 246847 BLD

    Inspections under way
  • Addition or alteration · Garage Repair/Reconstruction

    localized concrete repair

    Applied Sep 23, 2022 · issued Oct 26, 2022 · completed Oct 3, 2024 · Permit 22 207834 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to administration offices.

    Applied Oct 27, 2020 · issued May 26, 2021 · completed Jan 25, 2023 · Permit 20 211200 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to administration offices.

    Applied Oct 27, 2020 · issued May 26, 2021 · completed Sep 20, 2022 · Permit 20 211200 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to administration offices.

    Applied Oct 27, 2020 · issued May 26, 2021 · completed Sep 29, 2022 · Permit 20 211200 HVA

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal to Upgrade fire alarm system

    Applied Feb 2, 2016 · issued Mar 2, 2016 · Permit 16 111476 FSU

    Permit issued
  • Heating and ventilation · Other

    Existing laundry room - ventilation system upgarades with in Apartment Building.

    Applied Sep 23, 2015 · issued Oct 21, 2015 · completed Oct 30, 2025 · Permit 15 227026 MSA

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing four-storey apartment building by constructing four accessible parking spaces at the ground level, two accessible barrier-free underground parking spaces, and a roundabout drop off area. A total of seven lawful parking spaces will be removed.

    Decision: Approved (hearing Jan 8, 2025)

    Filed Aug 14, 2024 · File A0787/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 1117 Danforth Avenue

    14 storeys · 81 homes · Mixed use

    360 m away · Site plan · Approved · filed Oct 1, 2024

    Approved
  • 184 Chatham Avenue

    4 storeys · 42 homes · Residential

    380 m away · Site plan · Approved · filed Jun 25, 2024

    Approved
  • 1095-1111 Danforth Avenue

    13 storeys · Mixed use

    410 m away · Site plan · Approved · filed Mar 24, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 245 Strathmore Blvd · Minor variance

    To construct a new two-storey detached ancillary building (containing one laneway suite) cantilevered at the southeast portion of the second storey, abutting the laneway. There will be one undersized vehicular parking space (located below the cantilevered portion of the ancillary building), with a new rear driveway abutting the laneway at the southeast portion of the lot. There will be a total of three residential dwelling units on this lot (two units within the main house, and one unit within the ancillary building).

    200 m away · filed May 4, 2026 · Approved

  • 133 Lamb Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.

    90 m away · filed Nov 19, 2025 · Approved

  • 223 Chatham Ave · Consent

    To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title. Also, to maintain existing easements/rights-of-way.

    240 m away · filed Jul 28, 2025 · Approved

  • 199 Strathmore Blvd · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition.

    180 m away · filed Apr 8, 2025 · Approved

  • 167 Gillard Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard of the existing two-storey dwelling, abutting Mountjoy Avenue.

    220 m away · filed Apr 8, 2025 · Approved

  • 80 Lamb Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground level deck and stairs, and a rear second storey balcony. Also, to construct a new two-storey ancillary building containing one laneway suite with a rear second storey balcony, and a rooftop equipment area, in the rear yard, abutting the laneway. There will be a total of two residential dwelling units (one unit within the main dwelling and one unit within the ancillary building) on this lot.

    150 m away · filed Mar 21, 2025 · Approved

  • 153 Gillard Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new rear one-storey addition (with new basement extension below). The existing one-storey addition will be demolished.

    240 m away · filed Aug 29, 2024 · Approved

  • 584 Greenwood Ave · Minor variance

    To legalize and to maintain the rear one-storey addition with a basement walkout enclosure, and a rear ground floor deck with stairs, which is currently under construction, without the benefit of an authorized building permit. There will be a total of two residential dwelling units (one primary unit and one secondary suite located within the basement).

    220 m away · filed Jun 14, 2024 · Application withdrawn

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.