The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Addition(s)
Proposed addition to existing third floor.
Applied Apr 9, 2026 · issued Apr 29, 2026 · Permit 26 140951 BLD
- Cancelled
Small residential project · Addition(s)
To construct third floor addition to existing dwelling
Applied Dec 9, 2025 · completed Dec 30, 2025 · Permit 25 264105 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition.
Decision: Approved (hearing Sep 17, 2025)
Filed Apr 8, 2025 · File A0248/25TEY
What’s planned nearby
Development sites within 500 m
- Approved
14 storeys · 81 homes · Mixed use
280 m away · Site plan · Approved · filed Oct 1, 2024
- Approved
4 storeys · 42 homes · Residential
330 m away · Site plan · Approved · filed Jun 25, 2024
- Approved
13 storeys · Mixed use
340 m away · Site plan · Approved · filed Mar 24, 2022
Neighbours’ Committee of Adjustment files within 250 m
245 Strathmore Blvd · Minor variance
To construct a new two-storey detached ancillary building (containing one laneway suite) cantilevered at the southeast portion of the second storey, abutting the laneway. There will be one undersized vehicular parking space (located below the cantilevered portion of the ancillary building), with a new rear driveway abutting the laneway at the southeast portion of the lot. There will be a total of three residential dwelling units on this lot (two units within the main house, and one unit within the ancillary building).
200 m away · filed May 4, 2026 · Approved
133 Lamb Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.
240 m away · filed Nov 19, 2025 · Approved
223 Chatham Ave · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title. Also, to maintain existing easements/rights-of-way.
250 m away · filed Jul 28, 2025 · Approved
1275 Danforth Ave · Minor variance
To alter the existing four-storey apartment building by constructing four accessible parking spaces at the ground level, two accessible barrier-free underground parking spaces, and a roundabout drop off area. A total of seven lawful parking spaces will be removed.
180 m away · filed Aug 14, 2024 · Approved
133 Lamb Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition. Also, to permit the enclosed front porch, which was constructed without an authorized building permit.
240 m away · filed Sep 28, 2023 · Approved
12 Mountjoy Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial rear two-storey addition and a second storey addition above the existing one-storey rear portion of the dwelling.
200 m away · filed Jun 20, 2022 · Approved
670 Greenwood Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear first storey covered deck.
110 m away · filed Mar 18, 2022 · Approved
15 Linnsmore Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a one-storey front addition, a two-storey rear addition, a complete third storey addition, a rear covered ground floor deck, and to install a parking pad in the rear yard.
150 m away · filed Mar 17, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.