Toronto address · Ward 9, Davenport
129 Campbell Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Proposal to obtain a party wall admin permit in relation to 127 Campbell Ave, permit file 20 142976.
Applied Jan 26, 2021 · issued Jan 28, 2021 · completed Apr 18, 2023 · Permit 21 109005 BLD
- Closed
Small residential project · Party wall admin permits
Admin permit work being done at 127 Campbell ave
Applied May 25, 2020 · issued May 26, 2020 · completed Apr 18, 2023 · Permit 20 148158 BLD
- Closed
Drains and site services
Drain - Proposal to construct a new rear two storey addition with a new basement walkout rear deck, basement underpinning, interior alterations to all floors.
Applied Mar 4, 2020 · issued Apr 9, 2020 · completed Apr 20, 2021 · Permit 20 121848 DRN
- Closed
Heating and ventilation
HVAC - Proposal to construct a new rear two storey addition with a new basement walkout rear deck, basement underpinning, interior alterations to all floors.
Applied Mar 4, 2020 · issued Apr 9, 2020 · completed Apr 20, 2021 · Permit 20 121848 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new rear two storey addition with a new basement walkout rear deck, basement underpinning, interior alterations to all floors.
Applied Mar 4, 2020 · issued Apr 9, 2020 · completed Apr 20, 2021 · Permit 20 121848 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a new rear two storey addition with a new basement walkout rear deck, basement underpinning, interior alterations to all floors.
Applied Mar 4, 2020 · issued Apr 9, 2020 · completed Apr 28, 2025 · Permit 20 121848 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition containing a rear ground floor deck, a rear second storey deck, and a rear basement walkout.
Decision: Approved (hearing Mar 6, 2019)
Filed Oct 29, 2018 · File A1008/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
21 storeys · 861 homes · Residential
340 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
370 m away · Rezoning · Under review · filed May 14, 2026
- Under review
19 storeys · 325 homes · Mixed use
390 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
33 storeys · 634 homes · Mixed use
410 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
420 m away · Site plan · Under review · filed Aug 20, 2021
- Approved
33 storeys · 377 homes · Residential
460 m away · Rezoning · Approved · filed Dec 24, 2025
Neighbours’ Committee of Adjustment files within 250 m
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
250 m away · filed Jul 7, 2026 · Approved
149 Perth Ave · Minor variance
To legalize and to maintain the existing one-storey detached dwelling (including one and two-storey rear additions) by constructing a front ground floor covered porch with stairs, a front second storey addition, and a new rear ground floor stairs (for the existing one-storey sunroom). The existing rear two-storey ancillary building (containing a garage and storage space) will be maintained and unaltered. There will be a total of three residential dwelling units on this lot.
240 m away · filed Feb 3, 2026 · Approved
193 Rankin Cres · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.
80 m away · filed May 6, 2025 · Approved
182 Symington Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.
210 m away · filed Nov 7, 2024 · Approved
105 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.
60 m away · filed Jan 17, 2024 · Refused
104 Campbell Ave · Minor variance
To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.
120 m away · filed Dec 12, 2023 · Approved
89 Symington Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
110 m away · filed Oct 30, 2023 · Approved
105 Campbell Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.
60 m away · filed Jun 1, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.