Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 15, Don Valley West

12B Fifeshire Rd

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Revision 01: Removed front addition to keep existing exterior walls, added small addition to existing front porch, interior renos to ground floor main entrance, stairs, and second floor bathroom.Plumbing - Proposed addition and interior alterations to existing single family detached dwelling.

    Applied May 9, 2019 · issued May 9, 2019 · completed Oct 29, 2024 · Permit 18 111673 PLB (revision 01)

    Closed
  • Small residential project · Multiple projects

    Revision 01: Removed front addition to keep existing exterior walls, added small addition to existing front porch, interior renos to ground floor main entrance, stairs, and second floor bathroom.Proposed addition and interior alterations to existing single family detached dwelling.

    Applied May 9, 2019 · issued Jan 22, 2020 · completed Oct 29, 2024 · Permit 18 111673 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed addition and interior alterations to existing single family detached dwelling.

    Applied Jan 30, 2018 · issued Sep 21, 2018 · completed Oct 29, 2024 · Permit 18 111673 HVA

    Closed
  • Plumbing

    Plumbing - Proposed addition and interior alterations to existing single family detached dwelling.

    Applied Jan 30, 2018 · issued Sep 21, 2018 · completed Oct 29, 2024 · Permit 18 111673 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed addition and interior alterations to existing single family detached dwelling.

    Applied Jan 30, 2018 · issued Sep 21, 2018 · completed Oct 29, 2024 · Permit 18 111673 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 2654-2668 Bayview Avenue

    7 storeys · 168 homes · Residential

    270 m away · Rezoning · Under review · filed Apr 29, 2025

    Under review
  • 2619-2621 Bayview Avenue

    6 storeys · 60 homes · Residential

    280 m away · Site plan · Submitted · filed Jan 29, 2026

    Submitted
  • 2673-2675 Bayview Avenue

    Residential

    400 m away · Condominium · Approved · filed Feb 16, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 6 Baytree Cres · Minor variance

    To legalize and maintain the waste enclosure bin in the front yard.

    130 m away · filed Oct 15, 2024 · Approved

  • 17 Chieftain Cres · Minor variance

    To construct a new dwelling.

    140 m away · filed Nov 6, 2018 · Approved

  • 28 Fifeshire Rd · Minor variance

    To construct a new two-storey dwelling. The existing dwelling would be demolished.

    240 m away · filed Mar 24, 2017 · Refused

  • 6 Baytree Cres · Consent

    Appeal Received - August 25, 2015Appeal Reason: Failure to Make a DecisionAppeal sent to OMB - Sept. 25, 2015OMB Case Planner Leesa Kwong 416-326-6785Appeal withdrawn. Appeal was not sent to OMB

    130 m away · filed Nov 6, 2013 · Withdrawn

Everything planned in Don Valley West

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.