Toronto address · Ward 11, University-Rosedale
13 Oxford St
The City of Toronto has 6 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Revision #02 - Proposal to insulate crawl space, add oval window and fire shutter to fire rated wall.HVAC - Proposal to construct a 2 storey rear addition.
Applied Mar 22, 2021 · issued Mar 29, 2021 · completed Jun 1, 2022 · Permit 20 150219 HVA (revision 01)
- Closed
Small residential project · Addition(s)
Revision #02 - Proposal to insulate crawl space, add oval window and fire shutter to fire rated wall.Revise attic framing from trusses to conventional framing (18.95sqm)
Applied Mar 22, 2021 · issued Nov 26, 2021 · completed Jun 17, 2022 · Permit 20 150219 BLD (revision 02)
- Closed
Small residential project · Addition(s)
Revise attic framing from trusses to conventional framing (18.95sqm)
Applied Nov 10, 2020 · issued Nov 18, 2020 · completed Jun 17, 2022 · Permit 20 150219 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a 2 storey rear addition.
Applied May 29, 2020 · issued Jun 19, 2020 · completed Jun 1, 2022 · Permit 20 150219 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a 2 storey rear addition.
Applied May 29, 2020 · issued Jun 19, 2020 · completed Jun 17, 2022 · Permit 20 150219 PLB
- Closed
Small residential project · Addition(s)
Proposal to construct a 2 storey rear addition.
Applied May 29, 2020 · issued Jun 19, 2020 · completed Jun 17, 2022 · Permit 20 150219 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey townhouse by constructing a fire shutter on the west side of the previously approved two-storey rear addition.
Decision: Approved (hearing Aug 18, 2021)
Filed Apr 27, 2021 · File A0542/21TEY
- Closed
Minor variance · R addition
To alter the existing two-storey townhouse by constructing a rear two-storey addition and to legalize and to maintain the front porch and air conditioning unit.
Decision: Approved (hearing Dec 11, 2019)
Filed May 12, 2019 · File A0499/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
- Approved
- Under review
9 storeys · 109 homes · Mixed use
250 m away · Site plan · Under review · filed Apr 20, 2022
- Now selling
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
490 m away · Site plan · Under review · filed Aug 28, 2022
Neighbours’ Committee of Adjustment files within 250 m
280 Augusta Ave · Minor variance
To permit the partial conversion of the ground floor garages into amenity and storage space, which will reduce the number of on-site parking spaces from 8 spaces to 3 spaces.
250 m away · filed Mar 5, 2026 · Approved
281 College St · Minor variance
To alter the existing three-storey mixed-use building by converting the office unit (occupying the rear portion of the ground level) into one additional residential dwelling unit. The exising retail unit (occupying the front portion of the ground level), and two residential units (occupying the second and third levels) will be maintained.
140 m away · filed Dec 18, 2025 · Approved
230 Augusta Ave · Minor variance
220 m away · filed Jun 30, 2025 · Postponed
265 Augusta Ave · Minor variance
To alter the existing two-storey mixed-use building by converting two of the existing commercial units (municipally known as 265 and 267 Augusta Avenue) into eating establishments on the ground floor with storage within the basement. The existing residential dwelling units and eating establishment (municipally known as 269 Augusta Avenue) will be maintained and unaltered. There will be a total of three eating establishments on this lot.
180 m away · filed Jan 21, 2025 · Approved
114 Baldwin St · Minor variance
To construct a four-storey townhouse complex containing three buildings (Blocks A, B, and C), for a total of 10 residential dwelling units on this lot. The south building (Block A) will contain three dwelling units with second storey balconies and fourth storey decks on the east walls. The northeast building (Block B) will contain three dwelling units with second storey balconies on the north and south walls, and fourth storey decks on the north walls. The northwest building (Block C) will contain 4 dwelling units with second storey balconies and fourth storey decks on the east walls, as well…
240 m away · filed Nov 6, 2024 · Refused
55 Oxford St · Minor variance
To alter the existing three-storey semi-detached dwelling by demolishing the rear one-storey addition and to construct a new rear two-storey addition.
110 m away · filed Oct 31, 2024 · Approved
71 Oxford St · Minor variance
To alter the existing four-storey mixed-use building by constructing a partial rear fourth storey addition, a front third storey balcony, a new side (east) entrance leading to the second storey commercial space (café), and to relocate the second storey main entrance leading to the residential dwelling units above. Also, to construct a side (east) outdoor patio abutting Augusta Avenue, which will replace the existing side (east) access ramp. The existing one-storey commercial space located at the rear of the property and the existing rear fourth storey rooftop deck will be maintained and unalt…
200 m away · filed May 15, 2024 · Approved
224 Augusta Ave · Minor variance
To convert the existing one-storey non-residential building into a two-storey mixed-use building by constructing a complete second storey addition, and a rear two-storey addition. The existing eating establishment will be maintained on the ground level. There will be one residential dwelling unit on the second level (with access from the ground level).
240 m away · filed Mar 15, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.