Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

13 Wellesley Ave

The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Install/Alter plumbing - only

    install fix. 3rd fl: 1 shower, 1 w.b., 1 w.c.--cost incl. under file #01-106461

    Applied Jan 30, 2001 · issued Mar 30, 2001 · Permit 01 106466 PLB

    Inspections under way
  • Residential building permit · Alteration to existing building

    construct a third floor shed dormer addition and deck at rear ---see: c. of a. dec., party wall letter

    Applied Jan 30, 2001 · issued Mar 30, 2001 · Permit 01 106461 CMB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 451 Wellesley St E · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear screened enclosure (replacing the ground floor deck), and rear second and third floor additions. The existing rear ground, second and third floor decks will be demolished.

    140 m away · filed Sep 9, 2025 · Approved

  • 5 Parkview Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear third storey dormer addition. Also, to reconstruct the rear second storey balcony.

    120 m away · filed Jul 17, 2024 · Approved

  • 116 Amelia St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a third storey addition with a rooftop deck.

    160 m away · filed Jan 30, 2023 · Approved

  • 82 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey rear addition (dormer).

    230 m away · filed Dec 14, 2022 · Approved

  • 340 Wellesley St E · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.

    250 m away · filed Nov 21, 2022 · Approved

  • 92 Amelia St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition, a rear third storey roof deck, a new rear ground floor addition (to replace the existing addition), and a rear second storey roof deck. This dwelling will have a total of two residential units.

    190 m away · filed Oct 25, 2022 · Approved

  • 499 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition, as approved by Minor Variance Application A0370/22TEY. The current application is necessitated to identify a depth variance to the altered dwelling (as cited in the variance below).

    150 m away · filed Aug 25, 2022 · Approved

  • 499 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition.

    150 m away · filed Mar 29, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.