130 The Queensway

Humber Treatment Plant

The City of Toronto has 147 building permits since 2017 (63 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Inside and outside drains

    Drain - Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.

    Applied Aug 24, 2026 · Permit 23 136519 STS

    Not started
  • Addition or alteration · Interior alterations

    The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buildings with respect to structural, architectural, heating, ventilation, and air conditioning (HVAC), and lighting systems, and installation of a temporary blower system on a reinforced concrete pad.

    Applied Sep 12, 2025 · issued Nov 20, 2025 · Permit 25 224514 BLD

    Permit issued
  • Heating and ventilation

    HVAC - The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buildings with respect to structural, architectural, heating, ventilation, and air conditioning (HVAC), and lighting systems, and installation of a temporary blower system on a reinforced concrete pad.

    Applied Sep 12, 2025 · issued Nov 20, 2025 · Permit 25 224514 HVA

    Permit issued
  • Plumbing

    Plumbing - The project scope includes the removal and replacement of all existing blowers and associated systems in the North and South Blower Buildings, select upgrades to the existing blower buildings with respect to structural, architectural, heating, ventilation, and air conditioning (HVAC), and lighting systems, and installation of a temporary blower system on a reinforced concrete pad.

    Applied Sep 12, 2025 · issued Nov 20, 2025 · Permit 25 224514 PLB

    Permit issued
  • Plumbing

    REVISION 2 - pertaining to the material change for the domestic water pipingPlumbing - Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existing SP RAS Pump Station Sludge Pumping Station. Addition to the Pump station will be above the existing below grade level.

    Applied Feb 24, 2025 · issued Feb 25, 2025 · Permit 15 201211 PLB (revision 02)

    Revision issued
  • Plumbing

    Plumbing - Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction of a new vestibule with ventilation and lighting, separating hazardous classified Screen Room and unclassified Loading Bay. Plumbing repair of existing roof drain.

    Applied Jul 30, 2024 · issued Dec 2, 2024 · Permit 24 190387 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction of a new vestibule with ventilation and lighting, separating hazardous classified Screen Room and unclassified Loading Bay. Plumbing repair of existing roof drain.

    Applied Jul 30, 2024 · issued Dec 2, 2024 · Permit 24 190387 HVA

    Permit issued
  • Addition or alteration · Other

    Supply and install extension of the existing conveyor catwalk to Headhouse Loading Bay vestibule with installation of secondary egress on east side of the conveyor catwalk. Construction of a new vestibule with ventilation and lighting, separating hazardous classified Screen Room and unclassified Loading Bay. Plumbing repair of existing roof drain.

    Applied Jul 30, 2024 · issued Dec 2, 2024 · Permit 24 190387 BLD

    Permit issued
  • Fire and security upgrade · Fire alarm

    Proposal for replacement of fire alarm control panel, all zoning and devices to remain same

    Applied Sep 20, 2023 · issued Oct 20, 2023 · completed May 23, 2024 · Permit 23 204889 FSU

    Closed
  • Addition or alteration · Multiple projects

    Revision 01. Check the attached letter for all the changesDemolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Sep 7, 2023 · issued Dec 11, 2023 · completed Oct 15, 2025 · Permit 18 200915 BLD (revision 01)

    Closed
  • Heating and ventilation

    Revision 01. Check the attached letter for the changesHVAC - Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Sep 7, 2023 · issued Feb 27, 2024 · completed Aug 29, 2025 · Permit 18 200915 HVA (revision 01)

    Closed
  • Fire and security upgrade · Sprinklers

    Install new fire pump and sprinkler system (related to 18 200915 BLD)

    Applied Aug 15, 2023 · issued Feb 28, 2024 · Permit 23 189065 FSU

    Inspections under way
Show 135 more permits
  • Demolition

    Proposal to demolish existing boiler building for installation of a new north boiler building at the humber treatment plant

    Applied Aug 9, 2023 · issued Oct 25, 2023 · Permit 23 186164 DEM

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant

    Applied Jul 30, 2023 · issued Aug 6, 2024 · Permit 23 182043 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant

    Applied Jul 30, 2023 · issued Aug 6, 2024 · Permit 23 182043 PLB

    Inspections under way
  • Drains and site services · Inside and outside drains

    Drain - Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant

    Applied Jul 30, 2023 · issued Aug 6, 2024 · Permit 23 182043 STS

    Permit issued
  • New building

    Proposal to demolish existing boiler building and construct a new north boiler building at the Humber Treatment Plant

    Applied Jul 30, 2023 · issued Aug 6, 2024 · Permit 23 182043 BLD

    Inspections under way
  • Addition or alteration · Addition(s)

    Conversion of old substation building into new maintenance workshop

    Applied May 1, 2023 · completed May 22, 2024 · Permit 23 139899 BLD

    Cancelled
  • Plumbing

    Plumbing - CONVERSION OF OLD SUBSTATION BUILDING INTO NEW MAINTENANCE WORKSHOP

    Applied May 1, 2023 · completed May 22, 2024 · Permit 23 139899 PLB

    Cancelled
  • Heating and ventilation

    Hvac - conversion of old substation building into new maintenance workshop

    Applied May 1, 2023 · completed May 22, 2024 · Permit 23 139899 HVA

    Cancelled
  • Plumbing

    Plumbing - Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.

    Applied Apr 21, 2023 · issued Aug 6, 2024 · Permit 23 136519 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.

    Applied Apr 21, 2023 · issued Aug 6, 2024 · Permit 23 136519 HVA

    Permit issued
  • Addition or alteration · Multiple projects

    Modifications to HVAC, sumps, roof and floor drains, addition of exterior staircases, and other miscellaneous plant-wide upgrades at the Humber Treatment Plant.

    Applied Apr 21, 2023 · issued Aug 6, 2024 · Permit 23 136519 BLD

    Inspections under way
  • Drains and site services · Inside and outside drains

    Revision #01 - Revised site services for temp building A and added site services for temp building B.Drain - Site services 1. Additional storm connection for the proposed building expansion 2. Storm Drainage Structure for proposed parking area 3. Temporary sanitary and watermain connections for FUTURE temporary office and staff amenities Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and c…

    Applied Feb 2, 2022 · issued Feb 11, 2022 · completed Aug 22, 2025 · Permit 18 200915 STS (revision 01)

    Closed
  • Plumbing

    Revision - Add sanitary drain pipe and domestic cold water pipe to service Temporary Building B. Plumbing - Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Jan 7, 2022 · issued Feb 2, 2022 · completed Aug 22, 2025 · Permit 18 200915 PLB (revision 01)

    Closed
  • Plumbing

    Rev 01: Revision to use trap guard in lieu of trap seal primer.Plumbing - upgrades to existing west substation and construct concrete pads for transformers. News fans and heaters within building.

    Applied Sep 1, 2020 · issued Oct 29, 2020 · completed Dec 17, 2020 · Permit 16 157105 PLB (revision 01)

    Closed
  • Addition or alteration · Other

    Addition of maintenance loading platform and double doors in existing building

    Applied May 26, 2020 · issued Dec 14, 2020 · completed May 4, 2021 · Permit 20 148760 BLD

    Closed
  • New building

    New locker room, washroom and lunch room structure, temporary trailer B2(expected to remain for 22 months) with canopy for City of Toronto Humber Treatment Plant

    Applied Jan 6, 2020 · issued May 11, 2021 · Permit 20 101483 BLD

    Inspections under way
  • New building

    Office A2 to remain for about 22 months with canopy enclosure.TEMPORARY TRAILER COMPLEX FOR USE AS ADMINISTRATION OFFICES & STAFF AMENITIES DURING THE COURSE OF RENOVATION OF THE EXISTING ADMINISTRATION BUILDING FOR THE HUMBER TREATMENT PLANT. Trailers A1 and A2 with canopy enclosure are one building.

    Applied Jan 6, 2020 · issued Jun 2, 2020 · completed Jun 10, 2021 · Permit 20 101463 BLD

    Closed
  • Heating and ventilation

    HVAC - Construct new office (for about 22 months per applicant)

    Applied Jan 6, 2020 · issued May 20, 2021 · Permit 20 101483 HVA

    Revocation pending
  • New building

    Office structure, temporary trailer A1(expected to remain for 22 months) with canopy enclosure. TEMPORARY TRAILER COMPLEX FOR USE AS ADMINISTRATION OFFICES & STAFF AMENITIES DURING THE COURSE OF RENOVATION OF THE EXISTING ADMINISTRATION BUILDING FOR THE HUMBER TREATMENT PLANT. Trailers A1 and A2 with canopy enclosure are one building.

    Applied Jan 6, 2020 · issued Jun 2, 2020 · completed Jun 10, 2021 · Permit 20 101444 BLD

    Closed
  • New building

    New locker room, washroom and lunch room structure, temporary trailer B1(expected to remain for 22 months) with canopy for City of Toronto Humber Treatment Plant

    Applied Jan 6, 2020 · issued May 11, 2021 · Permit 20 101475 BLD

    Inspections under way
  • Plumbing

    Plumbing - New office (to exist about 22 months) per applicant

    Applied Jan 6, 2020 · issued May 11, 2021 · completed Apr 5, 2022 · Permit 20 101475 PLB

    Closed
  • Plumbing

    Plumbing - Office structure (expected to remain for 22 months) A1

    Applied Jan 6, 2020 · issued Jun 2, 2020 · completed Jun 24, 2021 · Permit 20 101444 PLB

    Closed
  • Heating and ventilation

    HVAC - New office (to exist about 22 months) per applicant

    Applied Jan 6, 2020 · issued May 20, 2021 · completed Apr 5, 2022 · Permit 20 101475 HVA

    Closed
  • Heating and ventilation

    HVAC - Office structure (expected to remain for 22 months) A1

    Applied Jan 6, 2020 · issued Jun 2, 2020 · completed Jun 16, 2021 · Permit 20 101444 HVA

    Closed
  • Heating and ventilation

    HVAC - Office A2 to remain for about 22 monthsTEMPORARY TRAILER COMPLEX FOR USE AS ADMINISTRATION OFFICES & STAFF AMENITIES DURING THE COURSE OF RENOVATION OF THE EXISTING ADMINISTRATION BUILDING FOR THE HUMBER TREATMENT PLANT.

    Applied Jan 6, 2020 · issued Jun 2, 2020 · completed Jun 16, 2021 · Permit 20 101463 HVA

    Closed
  • Plumbing

    Plumbing - Construct new office (for about 22 months per applicant)

    Applied Jan 6, 2020 · issued May 11, 2021 · Permit 20 101483 PLB

    Inspections under way
  • Plumbing

    Revision #01 - Changes to use dry trap rector seal. Plumbing - Construct new main electrical (1) storey substation for waste water facility *Humber Treatment Plant* to replace existing. (2) sump pumps, drain pirpes, and floor drains

    Applied Jul 29, 2019 · issued Jun 29, 2020 · completed Nov 9, 2020 · Permit 11 108763 PLB (revision 01)

    Closed
  • Alternative solution

    Permission is sought to change the potable and non potable water pipe header material from ductile iron to stainless steel. The change is at the request of plant staff due to the humid and corrosive atmosphere within the Return Activated Sludge (RAS) Plumbing Station and adjacent galleries.

    Applied Jul 17, 2019 · completed Feb 21, 2025 · Permit 19 190429 ALT

    Cancelled
  • Plumbing

    Revision 01- Revision to plumbing layout due to removal of equipment and uncovering services see clouded area on drawings Plumbing - Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existing SP RAS Pump Station Sludge Pumping Station. Addition to the Pump station will be above the existing below grade level.

    Applied May 16, 2019 · completed Feb 21, 2025 · Permit 15 201211 PLB (revision 01)

    Cancelled
  • Drains and site services · Inside and outside drains

    Drain - Site services 1. Additional storm connection for the proposed building expansion 2. Storm Drainage Structure for proposed parking area 3. Temporary sanitary and watermain connections for FUTURE temporary office and staff amenities Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Apr 30, 2019 · issued Oct 5, 2020 · completed Aug 22, 2025 · Permit 18 200915 STS

    Closed
  • Alternative solution

    Alternative solution for sump pump discharge in lieu of sanitary drainage by gravity due to site conditions.

    Applied Apr 3, 2019 · completed Apr 10, 2019 · Permit 19 134945 ALT

    Approved
  • Heating and ventilation

    HVAC - Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Jul 27, 2018 · issued Feb 1, 2021 · completed Aug 29, 2025 · Permit 18 200915 HVA

    Closed
  • Addition or alteration · Multiple projects

    Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Jul 27, 2018 · issued Oct 5, 2020 · completed Oct 15, 2025 · Permit 18 200915 BLD

    Closed
  • Plumbing

    Plumbing - Demolition and removals, new elevator, expansion to the building, renovate main entrance, lobby, exterior ramp. Renovate 1st and 2nd floor office space, relocate control room, plumbing, drainage, HVAC, fire protection, standpipe, electrical, fire alarm, and communications.

    Applied Jul 27, 2018 · issued Oct 5, 2020 · completed Aug 22, 2025 · Permit 18 200915 PLB

    Closed
  • Plumbing

    Plumbing - A precast concrete building to contain electrical and controls equipment is to be installed including aconcrete pad and foundation. HVAC shall be installed in the building with electrical connection to theplant. In addition, work includes alterations to the existing waste gas burner building, including removing and replacing waste gas burners and process systems. Also included are structural upgrades, enclosing the building, HVAC and electrical works and installation of floor drains.

    Applied May 11, 2018 · issued Jul 19, 2018 · completed Jul 6, 2023 · Permit 18 157335 PLB

    Cancelled
  • Addition or alteration · Multiple projects

    A precast concrete building to contain electrical and controls equipment is to be installed including aconcrete pad and foundation. HVAC shall be installed in the building with electrical connection to theplant. In addition, work includes alterations to the existing waste gas burner building, including removing and replacing waste gas burners and process systems. Also included are structural upgrades, enclosing the building, HVAC and electrical works and installation of floor drains.

    Applied May 11, 2018 · issued May 25, 2018 · completed Jul 31, 2023 · Permit 18 157335 BLD

    Closed
  • Heating and ventilation

    HVAC - A precast concrete building to contain electrical and controls equipment is to be installed including aconcrete pad and foundation. HVAC shall be installed in the building with electrical connection to theplant. In addition, work includes alterations to the existing waste gas burner building, including removing and replacing waste gas burners and process systems. Also included are structural upgrades, enclosing the building, HVAC and electrical works and installation of floor drains.

    Applied May 11, 2018 · issued Jul 19, 2018 · completed Feb 15, 2023 · Permit 18 157335 HVA

    Closed
  • Alternative solution

    Related to #16 112178 PSA 00 PS and 16 112192 STS 00 Proposal to use 316L stainless steele as alternative for the portable water piping located in the basement and tunnel system. This piping is located inside and in the basement of the Sludge Thickening Building, tunnel and the Old Substation at the Humber Treatment plant.

    Applied Jan 15, 2018 · completed Jul 26, 2018 · Permit 18 105265 ALT

    Approved
  • Plumbing · Holding Tank: sewage system

    Proposal to construct a sewage holding tank for propose modular office building structure. See related permit 17 229802 BLD 00 NB.

    Applied Nov 3, 2017 · issued Dec 27, 2017 · completed May 30, 2018 · Permit 17 257865 PSA

    Closed
  • Heating and ventilation

    HVAC - Proposal to contruct a 1storey modular office building.

    Applied Sep 8, 2017 · issued Jan 22, 2018 · completed Jan 25, 2018 · Permit 17 229802 HVA

    Closed
  • New building

    Construct temporary trailer

    Applied Sep 8, 2017 · issued Oct 31, 2017 · completed Jan 25, 2018 · Permit 17 229802 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to contruct a 1storey modular office building.

    Applied Sep 8, 2017 · issued Jan 22, 2018 · completed Jan 25, 2018 · Permit 17 229802 PLB

    Closed
  • Heating and ventilation

    HVAC - Design and installation of modular building office. Design HVC system to provide required heating/cooling of the building. Installation of sump basin and sump sewage pumps for building sanitary

    Applied Aug 4, 2017 · issued Apr 1, 2019 · completed Dec 23, 2019 · Permit 17 174913 HVA

    Closed
  • Alternative solution

    Proposing to construct with 316L stainless steel as an alternative for the new designed service water system to serve eyewash and sink.

    Applied Jul 26, 2017 · completed Aug 21, 2017 · Permit 17 206154 ALT

    Approved
  • Alternative solution

    Proposal to replace existing domestic potable water piping with stainless steel piping in lieu of copper piping.

    Applied Jul 10, 2017 · completed Sep 21, 2017 · Permit 17 195820 ALT

    Approved
  • Plumbing

    Plumbing - Design and installation of modular building office. Design HVC system to provide required heating/cooling of the building. Installation of sump basin and sump sewage pumps for building sanitary

    Applied Jul 4, 2017 · issued Apr 10, 2019 · completed Dec 23, 2019 · Permit 17 174913 PLB

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Design and installation of modular building office. Design HVC system to provide required heating/cooling of the building. Installation of sump basin and sump sewage pumps for building sanitary

    Applied Jun 9, 2017 · issued Apr 10, 2019 · completed Dec 23, 2019 · Permit 17 174913 STS

    Closed
  • New building

    Design and installation of modular building office. Design HVC system to provide required heating/cooling of the building. Installation of sump basin and sump sewage pumps for building sanitary

    Applied Jun 7, 2017 · issued Oct 20, 2017 · completed Dec 23, 2019 · Permit 17 174913 BLD

    Closed
  • Plumbing · Other

    To retrofit 7 existing sump pumps, including changing the pumps and installing a gas tight cover and vent. Demolish one of the sump pump and installing a new eyewash and new hand wash sink.

    Applied May 25, 2017 · issued Aug 22, 2017 · completed May 27, 2025 · Permit 17 166524 PSA

    Closed
  • Heating and ventilation

    HVAC - *Humber Treatment Plant*REPLACEMENT OF 4 EXISITNG HAVC SYSTEMS. ADDITON OF 1 HAVC UNIT, FAN AND BASE. BUILDING 3 NEW OUTDOORS STAIR CASES AND 3 INDOOR LADDERS AND PLATEFORMS. REPLACEMENT OF THE EXISITNG PLANT WATER SYSTEMS WITH NEW STAINLESS STEEL PIPES AND ACCESSORIES. REHABILITATION OF THE PLANT WATER FACILITY CEILING. ASSOCIATED ELECTRICAL, I&C, SCADA AND BUILDING AUTOMATION SYSTEM WORK.

    Applied May 3, 2017 · Permit 17 153411 HVA

    Under review
  • Addition or alteration · Multiple projects

    *Humber Treatment Plant*REPLACEMENT OF 4 EXISITNG HAVC SYSTEMS. ADDITON OF 1 HAVC UNIT, FAN AND BASE. BUILDING 3 NEW OUTDOORS STAIR CASES AND 3 INDOOR LADDERS AND PLATEFORMS. REPLACEMENT OF THE EXISTNG PLANT WATER SYSTEMS WITH NEW STAINLESS STEEL PIPES AND ACCESSORIES. REHABILITATION OF THE PLANT WATER FACILITY CEILING. ASSOCIATED ELECTRICAL, I&C, SCADA AND BUILDING AUTOMATION SYSTEM WORK.

    Applied May 3, 2017 · issued Jul 13, 2017 · Permit 17 153411 BLD

    Inspections under way
  • Plumbing

    Plumbing - *Humber Treatment Plant*REPLACEMENT OF 4 EXISITNG HAVC SYSTEMS. ADDITON OF 1 HAVC UNIT, FAN AND BASE. BUILDING 3 NEW OUTDOORS STAIR CASES AND 3 INDOOR LADDERS AND PLATEFORMS. REPLACEMENT OF THE EXISITNG PLANT WATER SYSTEMS WITH NEW STAINLESS STEEL PIPES AND ACCESSORIES. REHABILITATION OF THE PLANT WATER FACILITY CEILING. ASSOCIATED ELECTRICAL, I&C, SCADA AND BUILDING AUTOMATION SYSTEM WORK.

    Applied May 3, 2017 · Permit 17 153411 PLB

    Examiner's notice sent
  • Plumbing

    Plumbing - Proposal to portable washroom structure which includes construction of concrete pad, and installation of plumbing and sanitary services.

    Applied Mar 22, 2017 · issued Apr 28, 2017 · completed Feb 22, 2018 · Permit 17 132477 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct washroom trailer which includes construction of concrete pad, and installation of plumbing and sanitary services.Note: SB-10 was not submitted

    Applied Mar 22, 2017 · issued Jun 21, 2017 · completed Apr 5, 2018 · Permit 17 132477 HVA

    Closed
  • New building

    Proposal to portable washroom structure which includes construction of concrete pad, and installation of plumbing and sanitary services.

    Applied Mar 22, 2017 · issued Apr 12, 2017 · completed May 14, 2018 · Permit 17 132477 BLD

    Closed
  • Alternative solution

    Alternative solution to use the decommissioned old substation building to exclusively house the plant eastern feeds backflow preventor. The solution we propose is a system which includes floor drains and sump to manage the approx 100L per year of potable water discharged from performing annual backflow preventor maintenance. The 75mm sump discharge line was designed to cross a plant service road (1.8m below grade) and enter the basement of another building (Ozone Building) and discharge into a sanitary sump.

    Applied Jan 26, 2017 · completed Mar 20, 2017 · Permit 17 109609 ALT

    Approved
  • Addition or alteration · Multiple projects

    upgrades to existing west substation and construct concrete pads for transformers and fence around it . News fans and heaters within building.

    Applied May 17, 2016 · issued Jun 3, 2016 · completed May 17, 2019 · Permit 16 157105 BLD

    Closed
  • Heating and ventilation

    HVAC - upgrades to existing west substation and construct concrete pads for transformers. News fans and heaters within building.

    Applied May 17, 2016 · issued Jun 14, 2016 · completed Jan 16, 2020 · Permit 16 157105 HVA

    Closed
  • Plumbing

    Plumbing - upgrades to existing west substation and construct concrete pads for transformers. News fans and heaters within building.

    Applied May 17, 2016 · issued Jun 14, 2016 · completed Dec 17, 2020 · Permit 16 157105 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 2 back flow prevention devices, 2 double check valves and 2 sump pumps for Humber Treatment Plant. Scope of work related to site services permit 16 112192 STS 00 DR.

    Applied Feb 3, 2016 · issued Mar 24, 2016 · completed Oct 29, 2018 · Permit 16 112178 PSA

    Closed
  • Drains and site services · Site service

    Proposal to install 200mm WM, 200mm DCW, 200mm FW & 75mm sanitary line to existing water treatment plant. Scope of work related to plumbing permit 16 112178 PSA 00 PS.

    Applied Feb 3, 2016 · issued Mar 24, 2016 · completed Apr 4, 2019 · Permit 16 112192 STS

    Closed
  • Plumbing

    Plumbing - (see application form for description); Addition of five new vestibules in north grit building, new electrical building at the headhouse, headhouse building loading bay, stairs area and five vestibules, north grit new electrical building, removal of exisiting concrete grit bins and walls, removal of existing trench drain grating and frame, existing door frame and door, existing roll up door and some slab in north grit building, etc.

    Applied Jan 29, 2016 · issued Mar 17, 2016 · completed Mar 8, 2021 · Permit 12 281237 PLB

    Closed
  • Heating and ventilation

    HVAC - Demolish, modify, replace and add HVAC equipment, ductwork, plumbing fixtures and piping (see application form); Addition of five new vestibules in north grit building, new electrical building at the headhouse, headhouse building loading bay, stairs area and five vestibules, north grit new electrical building, removal of exisiting concrete grit bins and walls, removal of existing trench drain grating and frame, existing door frame and door, existing roll up door and some slab in north grit building, etc.

    Applied Jan 29, 2016 · issued Mar 17, 2016 · completed May 6, 2021 · Permit 12 281237 HVA

    Closed
  • Addition or alteration · Shoring

    FILE BY PICK UP AREA...............ldTo construct new retaining walls for East and West laydown areas (95 M East and 75 M West) to an existing Water Treatment Plant.

    Applied Aug 26, 2015 · issued Mar 8, 2016 · completed Oct 10, 2019 · Permit 15 212972 BLD

    Closed
  • Addition or alteration · Multiple projects

    Proposal to demolish and rebuild 3 gallery access houses, renovations to the existing galleries (31.2 sq.m, 3.5m height (houses), 2120 sq.m for galleries.

    Applied Aug 14, 2015 · issued Nov 13, 2015 · Permit 15 206929 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to demolish and rebuild 3 gallery access houses, renovations to the existing galleries (31.2 sq.m, 3.5m height (houses), 2120 sq.m for galleries.

    Applied Aug 14, 2015 · issued Nov 13, 2015 · completed Jan 30, 2024 · Permit 15 206929 HVA

    Closed
  • New building

    Proposal to construct a Ferous chloride building with associated tanks on existing Humber Water Treatment Plant.

    Applied Aug 7, 2015 · issued Mar 9, 2016 · completed Oct 5, 2022 · Permit 15 203241 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal to construct a Ferous chloride building with associated tanks on existing Humber Water Treatment Plant.

    Applied Aug 7, 2015 · issued Mar 9, 2016 · completed Oct 5, 2022 · Permit 15 203241 PLB

    Cancelled
  • Plumbing

    Plumbing - Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existing SP RAS Pump Station Sludge Pumping Station. Addition to the Pump station will be above the existing below grade level.

    Applied Aug 4, 2015 · issued Nov 30, 2015 · Permit 15 201211 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existing SP RAS Pump Station Sludge Pumping Station. Addition to the Pump station will be above the existing below grade level. Demo some exterior walls.

    Applied Aug 4, 2015 · issued Nov 16, 2015 · Permit 15 201211 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations (interior and exterior stairs, new openings in exterior wall etc) and addition to existing SP RAS Pump Station Sludge Pumping Station. Addition to the Pump station will be above the existing below grade level.

    Applied Aug 4, 2015 · issued Nov 16, 2015 · completed Apr 3, 2024 · Permit 15 201211 HVA

    Closed
  • Heating and ventilation

    Revision 01: re-submission of mechanical drawings: as per inspector from Hatch Mott MacDonald "The contractor was supposed to have provided these drawings for permit amendment at the start of construction with the Maintenance Building pre-engineered building package but included old mechanical drawings by mistake."HVAC - Interior alterations to an existing building to create a control room in existing Water Treatment Plant.

    Applied Jul 20, 2015 · issued Sep 14, 2015 · Permit 13 117364 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Interior alterations, new roof top raling to South Swith Gear Building (213.64M2) - to Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Aug 30, 2016 · completed Jan 26, 2024 · Permit 15 189533 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations, new roof top raling to South Swith Gear Building (213.64M2) - to Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Aug 28, 2015 · completed Apr 8, 2024 · Permit 15 189533 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations, new roof top railing, new exterior stairs to North Switch Gear Buiding.(Building #5).

    Applied Jul 13, 2015 · issued Aug 28, 2015 · completed Jan 29, 2024 · Permit 15 189511 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to Instrument Air building (Building #4, 134.2M2), also add exterior railing to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Aug 28, 2015 · completed Jan 29, 2024 · Permit 15 189444 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to an existing Ferrous Chloride Facility (Building #3) to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Jul 14, 2016 · completed Jan 30, 2024 · Permit 15 189394 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to an existing Ferrous Chloride Facility (Building #3) to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Jul 14, 2016 · completed Jan 30, 2024 · Permit 15 189394 PLB

    Closed
  • Heating and ventilation

    HVAC - To construct new Plant Water Pump Station Building (84.59 M2) proposed at the East side of the property to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Jul 14, 2016 · completed Jun 9, 2021 · Permit 15 189287 HVA

    Closed
  • New building

    To construct new Plant Water Pump Station Building (84.59 M2) proposed at the East side of the property to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Mar 9, 2016 · completed Apr 8, 2021 · Permit 15 189287 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to Instrument Air building (Building #4, 134.2M2), also add exterior railing to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Jul 14, 2016 · completed Jan 30, 2024 · Permit 15 189444 HVA

    Closed
  • Heating and ventilation

    HVAC - Interior alterations, new roof top railing, new exterior stairs to North Switch Gear Buiding.(Building #5).

    Applied Jul 13, 2015 · issued Jul 14, 2016 · completed Jan 30, 2024 · Permit 15 189511 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to an existing Ferrous Chloride Facility (Building #3) to an existing Water Treatment Plant site.

    Applied Jul 13, 2015 · issued Dec 11, 2015 · completed Jan 29, 2024 · Permit 15 189394 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new electrical building within existing water treatment plant site 96.81 M2 AREA, 4.43 M HEIGHT

    Applied Jun 12, 2015 · issued Jul 14, 2016 · completed Jan 2, 2020 · Permit 15 173355 HVA

    Closed
  • New building

    Proposal to construct a new electrical building within existing water treatment plant site 96.81 M2 AREA, 4.43 M HEIGHT

    Applied Jun 12, 2015 · issued Jul 3, 2015 · completed Dec 8, 2020 · Permit 15 173355 BLD

    Closed
  • Demolition

    Proposal to demolish existing Humber Treatment consultant office.

    Applied Apr 28, 2015 · issued Jun 9, 2015 · Permit 15 147865 DEM

    Inspections under way
  • Plumbing

    Rev#1 - Revision for a new sanitary connection for new Maintenance BuildingPlumbing - To construct new Maintenance Building to an existing Water treatment Plant.

    Applied Apr 27, 2015 · issued May 21, 2015 · Permit 13 117426 PLB (revision 01)

    Revision issued
  • New building

    Revision #1: Revision to add sprinklers Proposed new building to house electrical distribution equipment on site of existing sewage treatment plant.

    Applied Aug 29, 2013 · issued Sep 17, 2013 · Permit 09 191648 BLD (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Interior alterations to existing office of *Humber Treatment * consultant office. Changes to walls, ceilings, emergency light/lighting. Construct new roof. No sprinkler work.

    Applied May 15, 2013 · issued Jan 15, 2014 · Permit 13 169356 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to existing office of *Humber Treatment * consultant office. Changes to walls, ceilings, emergency light/lighting. Construct new roof. No sprinkler work. Redistribute supply and return air ducting

    Applied May 15, 2013 · issued Nov 30, 2017 · Permit 13 169356 HVA

    Permit issued
  • Addition or alteration · Other

    Construction of earth retaining wall at south side of new substation

    Applied Apr 3, 2013 · issued Nov 1, 2013 · completed Apr 1, 2019 · Permit 13 143895 BLD

    Closed
  • New building

    To construct new Maintenance Building to an existing Water treatment Plant.

    Applied Feb 7, 2013 · issued Aug 11, 2014 · Permit 13 117426 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to an existing building to create a control room in existing Water Treatment Plant.

    Applied Feb 7, 2013 · issued Mar 20, 2013 · Permit 13 117364 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to an existing building to create a control room in existing Water Treatment Plant.See also 13-117426

    Applied Feb 7, 2013 · issued Mar 6, 2013 · Permit 13 117364 BLD

    Permit issued
  • Plumbing

    Plumbing - To construct new Maintenance Building to an existing Water treatment Plant.

    Applied Feb 7, 2013 · issued Aug 11, 2014 · Permit 13 117426 PLB

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to an existing building to create a control room in existing Water Treatment Plant.

    Applied Feb 7, 2013 · issued Mar 20, 2013 · Permit 13 117364 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Addition of five new vestibules in north grit building, new electrical building at the headhouse, headhouse building loading bay, stairs area and five vestibules, north grit new electrical building, removal of exisiting concrete grit bins and walls, removal of existing trench drain grating and frame, existing door frame and door, existing roll up door and some slab in north grit building, etc.

    Applied Nov 19, 2012 · issued Jan 23, 2013 · Permit 12 281237 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Upgrades and repairs to existing digester gas fuelled cogeneration system: exterior structural slab, service platform and demising wall for gas building and new structural platform for equipment supporta at Eng. building.

    Applied May 30, 2012 · issued Aug 24, 2012 · completed Jan 12, 2017 · Permit 12 182883 HVA

    Closed
  • Heating and ventilation

    HVAC - Replace existing interior wall with new block wall between basement and mezzanine, structural support for new air conditioning unit (1) on roof. Install and change concrete pads for electrical equipment in basement for Administration Building for Humber Treatment Plant.

    Applied Apr 29, 2011 · issued May 31, 2011 · Permit 11 179798 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Replace existing interior wall with new block wall between basement and mezzanine, structural support for new air conditioning unit (1) on roof. Install and change concrete pads for electrical equipment in basement for Administration Building for Humber Treatment Plant.

    Applied Apr 20, 2011 · issued May 31, 2011 · Permit 11 179798 BLD

    Permit issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Interior alterations to relocate workshop and add washroom within existing building. New platform and stairs. New outside concrete pad to support new generator. Sprinkler work.

    Applied Feb 4, 2011 · Permit 10 313761 FSU

    Application on hold
  • Plumbing

    Plumbing - Construct new main electrical (1) storey substation for waste water facility *Humber Treatment Plant* to replace existing. (2) sump pumps, drain pirpes, and floor drains

    Applied Jan 24, 2011 · issued Nov 4, 2011 · completed Nov 9, 2020 · Permit 11 108763 PLB

    Closed
  • Heating and ventilation

    HVAC - Construct new main electrical (1) storey substation for waste water facility *Humber Treatment Plant* to replace existing. New HVAC system

    Applied Jan 24, 2011 · issued Nov 4, 2011 · completed Jul 28, 2020 · Permit 11 108763 HVA

    Closed
  • Demolition

    Demolition of existing main south electrical substation to *Humber Treatment Plant*

    Applied Jan 18, 2011 · issued Nov 4, 2011 · completed Feb 9, 2018 · Permit 11 108791 DEM

    Cancelled
  • New building

    Construct new main electrical (1) storey substation for waste water facility *Humber Treatment Plant* to replace existing.

    Applied Jan 18, 2011 · issued Nov 4, 2011 · completed Nov 18, 2019 · Permit 11 108763 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to relocate workshop and add washroom within existing building. New platform and stairs. New outside concrete pad to support new generator. Sprinkler work. Water heater and washrooms

    Applied Dec 16, 2010 · issued Feb 25, 2011 · Permit 10 313761 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to relocate workshop and add washroom within existing building. New platform and stairs. New outside concrete pad to support new generator. Sprinkler work.

    Applied Dec 16, 2010 · issued Feb 25, 2011 · Permit 10 313761 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    Interior alterations to relocate workshop and add washroom within existing building. New platform and stairs. New outside concrete pad to support new generator. Sprinkler work.

    Applied Dec 14, 2010 · issued Feb 7, 2011 · Permit 10 313761 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposed new building to house electrical distribution equipment on site of existing sewage treatment plant.

    Applied Apr 23, 2010 · issued May 26, 2010 · Permit 09 191648 HVA

    Work not started
  • Heating and ventilation

    HVAC - Alterations to ventilation system of existing sewage treatment plant.

    Applied Mar 24, 2010 · issued Jun 15, 2010 · completed Jun 8, 2026 · Permit 09 191632 HVA

    Closed (dormant)
  • New building

    Proposed new building to house electrical distribution equipment on site of existing sewage treatment plant.

    Applied Nov 26, 2009 · issued May 21, 2010 · completed Jun 8, 2026 · Permit 09 191648 BLD

    Closed (dormant)
  • Addition or alteration · Other

    New structural supports for alterations to HVAC in existing sewage treatment plant.

    Applied Nov 26, 2009 · issued Jun 15, 2010 · completed Jun 8, 2026 · Permit 09 191632 BLD

    Closed (dormant)
  • Fire and security upgrade · Sprinklers

    installation of a new sprinkler system and standpipe (in conjunction with 06-142279)

    Applied Aug 25, 2009 · issued Nov 20, 2009 · Permit 09 161839 FSU

    Inspections under way
  • Addition or alteration · Multiple projects

    Construct an outdoor chemical containment facility at the south end of the existing chlorine facility, interior alterations to install chemical metering equipment

    Applied Feb 26, 2009 · issued Mar 25, 2009 · Permit 09 112434 BLD

    Inspections under way
  • Addition or alteration · Other

    New concrete slab and steel platform for an outdoor stand-by generator.

    Applied Jun 6, 2008 · issued Oct 30, 2008 · completed Jun 8, 2026 · Permit 08 166909 BLD

    Closed (dormant)
  • Addition or alteration · Other

    Removal of mould-contaminated finishes and replacement with new at the areas indicated on plans, and installation of 3 temporary trailers (on wheels) to be used as office space for the duration of renovation.

    Applied Mar 13, 2008 · issued Apr 3, 2008 · completed Jun 8, 2026 · Permit 08 119070 BLD

    Closed (dormant)
  • Addition or alteration · Multiple projects

    Upgrades to waste activated sludge thickening facilities and chlorine building for Humber Treatment Plant.

    Applied Jun 5, 2006 · issued Dec 21, 2006 · Permit 06 142279 BLD

    Inspections under way
  • Plumbing

    Plumbing - Upgrades to waste activated sludge thickening facilities and chlorine building for Humber Treatment Plant.

    Applied Jun 2, 2006 · issued Dec 21, 2006 · Permit 06 142279 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Upgrades to waste activated sludge thickening facilities and chlorine building for Humber Treatment Plant.

    Applied Jun 2, 2006 · issued Dec 21, 2006 · Permit 06 142279 HVA

    Inspections under way
  • Plumbing

    Plumbing - Rehabilitation of exist. digestor tanks & construction of 3 new gas compressor buildings and 1 new electrical room to exist. City of Toronto Humber Wastewater Treatment Plant. - Addition(s)

    Applied Jan 15, 2004 · issued May 7, 2004 · Permit 04 100364 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Rehabilitation of exist. digestor tanks & construction of 3 new gas compressor buildings and 1 new electrical room to exist. City of Toronto Humber Wastewater Treatment Plant. - Addition(s)

    Applied Jan 15, 2004 · issued May 7, 2004 · Permit 04 100364 HVA

    Inspections under way
  • Addition or alteration · Addition(s)

    Rehabilitation of exist. digestor tanks & construction of 3 new gas compressor buildings and 1 new electrical room to exist. City of Toronto Humber Wastewater Treatment Plant.

    Applied Jan 6, 2004 · issued May 7, 2004 · Permit 04 100364 BLD

    Inspections under way
  • Addition or alteration · Addition(s)

    To construct new prefabricated building over existing foundation as part of building permit # 00-362533 and 00-352790

    Applied Apr 15, 2003 · issued Jul 14, 2003 · Permit 03 124230 BLD

    Inspections under way
  • Plumbing · Other

    Upgrade the existing plumbing system for the sludge thickening building at the Humber Treatment Plant Refer:01-205265(H)

    Applied Dec 27, 2001 · issued Jan 8, 2002 · completed Jun 8, 2026 · Permit 01 205298 PSA

    Closed (dormant)
  • Non-residential building permit · Partial permit - foundation

    Foundation permit for water filtration building. Refer: 00-352790.

    Applied Dec 18, 2000 · issued Feb 22, 2001 · Permit 00 362533 PRT

    Inspections under way
  • Non-residential building permit · Addition/Alteration to existing building

    Addition/Alterations to Humber Sewage Treatment Plant. HVAC & Plumbing included.

    Applied Dec 7, 2000 · issued Apr 5, 2001 · Permit 00 360543 CMB

    Inspections under way
  • Non-residential building permit · New building

    New one storey institutional building. HVAC & Plumbing included.Refer: 00-362533

    Applied Nov 9, 2000 · issued Jul 14, 2003 · Permit 00 352790 CMB

    Inspections under way
  • Non-residential building permit · Alteration to existing building

    Interior alterations to industrial building.

    Applied Jul 24, 2000 · issued Oct 23, 2000 · completed Aug 25, 2026 · Permit 00 174422 CMB

    Closed
  • Non-residential building permit · Addition to existing building

    New exterior door to Humber Treatment Plant. Fees to be paid on journal entry (debit) with D. Smout.

    Applied Nov 8, 1999 · issued Nov 25, 1999 · Permit 99 108403 COM

    Inspections under way
  • Addition or alteration · Other

    Replace steel beams-humber treatmt plant

    Applied Mar 11, 1999 · issued Mar 24, 1999 · completed Jun 8, 2026 · Permit 99 083544 BLD

    Closed (dormant)
  • Plumbing · Other

    Fixtures/sani to governmental building

    Applied Feb 5, 1998 · issued Feb 11, 1998 · completed Jun 8, 2026 · Permit 98 083884 PLB

    Closed (dormant)
  • Addition or alteration · Addition(s)

    Add'n/alts. To sewage treatment plant

    Applied Feb 13, 1997 · issued Jun 20, 1997 · completed Jun 8, 2026 · Permit 97 083682 BLD

    Closed (dormant)
  • Heating and ventilation

    Add'n/alts. To sewage treatment plant

    Applied Feb 13, 1997 · issued Jun 20, 1997 · completed Jun 8, 2026 · Permit 97 083682 HVA

    Closed (dormant)
  • Heating and ventilation

    Field office & add'n to sewage plant

    Applied Sep 28, 1993 · issued Jan 12, 1994 · completed Jun 8, 2026 · Permit 93 083514 HVA

    Closed (dormant)
  • New building

    Field office & add'n to sewage plant

    Applied Sep 28, 1993 · issued Jan 12, 1994 · completed Jun 8, 2026 · Permit 93 083514 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 125 The Queensway

    50 storeys · Mixed use

    370 m away · Rezoning · Under appeal · filed Mar 11, 2025

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.