Toronto address · Ward 10, Spadina-Fort York
130 Wolseley St
The City of Toronto has 14 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Approved
Alternative solution
The proposed alternative solution is to permit a single means of egress serving #rd floor and 2nd floor of a 3-storey residential building containing six (6) dwelling units by providing a fully automatic sprinkler system throughout the building in lieu of a second exit stairs. The Ontario Building Code requires two means of egress for a multi-unit residential building of this height. The proposed alternative solution replace the second means of egress with a fully automatic sprinkler system designed and installed in accordance with OBC Division B, Article 3.2.5 and NFPA 13.The building consis…
Applied Jan 15, 2026 · completed Jun 9, 2026 · Permit 26 105144 ALT
- Inspections under way
Heating and ventilation
HVAC - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units
Applied Nov 21, 2025 · issued Jun 11, 2026 · Permit 25 255296 HVA
- Closed
Drains and site services
Drain - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units
Applied Nov 18, 2025 · issued Jun 11, 2026 · completed Jul 23, 2026 · Permit 25 255296 DRN
- Inspections under way
Small residential project · Multiple projects
Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units
Applied Nov 18, 2025 · issued Jun 11, 2026 · 6 homes added · Permit 25 255296 BLD
- Inspections under way
Plumbing
Plumbing - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units
Applied Nov 18, 2025 · issued Jun 11, 2026 · Permit 25 255296 PLB
- Cancelled
Small residential project · Multiple projects
Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.
Applied Sep 30, 2025 · completed Oct 14, 2025 · 2 homes added · Permit 25 232817 BLD
- Cancelled
Heating and ventilation
HVAC - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.
Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 HVA
- Cancelled
Plumbing
Plumbing - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.
Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 PLB
- Cancelled
Drains and site services
Drain - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.
Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 DRN
- Inspections under way
Small residential project · Multiple projects
Proposal for interior alteration, redo the roof and exterior walls.
Applied May 21, 2025 · issued May 29, 2025 · 1 home added · Permit 25 163033 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alteration, redo the roof and exterior walls.
Applied May 21, 2025 · issued May 29, 2025 · Permit 25 163033 PLB
- Closed
Drains and site services
Drain - Proposal for interior alteration, redo the roof and exterior walls.
Applied May 21, 2025 · issued May 29, 2025 · completed Jul 23, 2026 · Permit 25 163033 DRN
Show 2 more permits
- Closed
Small residential project · Underpinning
Proposal to underpin the foundation with unfinished basement.
Applied Oct 29, 2024 · issued Nov 4, 2024 · completed Jul 10, 2026 · Permit 24 232340 BLD
- Closed
Drains and site services
Drain - Proposal to underpin the foundation with unfinished basement.
Applied Oct 29, 2024 · issued Nov 4, 2024 · completed Jul 10, 2026 · Permit 24 232340 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · NR addition
To alter the existing two-storey detached dwelling by constructing a complete third floor addition, and a rear basement walkout with stairs. There will be a total of four residential dwelling units on this lot.
Decision: Approved (hearing Jun 11, 2025)
Filed Dec 10, 2024 · File A1063/24TEY
What’s planned nearby
Development sites within 500 m
- Approved
152-164 Bathurst Street and 621-627 Richmond Street West
29 storeys · 384 homes · Mixed use
240 m away · Site plan · Approved · filed Apr 29, 2022
- Under review
141-161 Bathurst Street and 579-591 Richmond Street West
12 storeys · Non-residential
250 m away · Site plan · Under review · filed Dec 22, 2021
- Under review
16 storeys · 139 homes · Mixed use
290 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
16 storeys · 129 homes · Residential
410 m away · Condominium · Under review · filed Nov 4, 2021
Neighbours’ Committee of Adjustment files within 250 m
74 Markham St · Minor variance
To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the…
180 m away · filed Aug 17, 2026 · Hearing scheduled
157 Wolseley St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.
110 m away · filed May 29, 2026 · Approved
701 Queen St W · Minor variance
To construct a new three-storey attached mixed-use building, abutting a rear lane, with a rear ground floor patio, a rear second floor partially covered deck with stairs, and a rear third floor deck with stairs. There will be a total of three units within the mixed-use building (one commercial unit on the and basement and first storey, one residential dwelling unit on the second storey, and one residential dwelling unit on the third storey) and no visitor parking spaces will be provided.
150 m away · filed Aug 18, 2024 · Approved
51 Robinson St · Minor variance
To construct a new one-storey ancillary building (garden suite in the rear yard, abutting Palmerston Road) of the existing two-storey townhouse dwelling. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
150 m away · filed Aug 18, 2024 · Approved
69 Markham St · Minor variance
To construct a new three-storey detached dwelling with a rear basement walkout, a third floor south facing terrace, and an in-ground swimming pool. The existing detached garage, abutting the laneway, will be maintained.
200 m away · filed Oct 14, 2022 · Approved
55 Markham St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition and to install a secondary suite within the basement. Also, to construct a two-storey ancillary building (laneway suite) in the rear, abutting the laneway.
150 m away · filed Aug 16, 2022 · Approved
139 Wolseley St · Minor variance
To construct a two-storey detached dwelling with a front porch.
80 m away · filed Sep 13, 2021 · Approved
71 Euclid Ave · Minor variance
To convert the existing two-storey one-unit semi-detached dwelling to a two-storey two-unit semi-detached dwelling by creating a secondary suite in the basement.
230 m away · filed May 19, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.