Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 10, Spadina-Fort York

130 Wolseley St

The City of Toronto has 14 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    The proposed alternative solution is to permit a single means of egress serving #rd floor and 2nd floor of a 3-storey residential building containing six (6) dwelling units by providing a fully automatic sprinkler system throughout the building in lieu of a second exit stairs. The Ontario Building Code requires two means of egress for a multi-unit residential building of this height. The proposed alternative solution replace the second means of egress with a fully automatic sprinkler system designed and installed in accordance with OBC Division B, Article 3.2.5 and NFPA 13.The building consis…

    Applied Jan 15, 2026 · completed Jun 9, 2026 · Permit 26 105144 ALT

    Approved
  • Heating and ventilation

    HVAC - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units

    Applied Nov 21, 2025 · issued Jun 11, 2026 · Permit 25 255296 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units

    Applied Nov 18, 2025 · issued Jun 11, 2026 · completed Jul 23, 2026 · Permit 25 255296 DRN

    Closed
  • Small residential project · Multiple projects

    Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units

    Applied Nov 18, 2025 · issued Jun 11, 2026 · 6 homes added · Permit 25 255296 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed 3rd floor addition and interior alterations to convert existing dwelling into 6 units

    Applied Nov 18, 2025 · issued Jun 11, 2026 · Permit 25 255296 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.

    Applied Sep 30, 2025 · completed Oct 14, 2025 · 2 homes added · Permit 25 232817 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.

    Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.

    Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 PLB

    Cancelled
  • Drains and site services

    Drain - Proposal to construct third floor addition with interior alterations convertting 2 unit dwelling to 4 unit dwelling.

    Applied Sep 30, 2025 · completed Oct 14, 2025 · Permit 25 232817 DRN

    Cancelled
  • Small residential project · Multiple projects

    Proposal for interior alteration, redo the roof and exterior walls.

    Applied May 21, 2025 · issued May 29, 2025 · 1 home added · Permit 25 163033 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alteration, redo the roof and exterior walls.

    Applied May 21, 2025 · issued May 29, 2025 · Permit 25 163033 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal for interior alteration, redo the roof and exterior walls.

    Applied May 21, 2025 · issued May 29, 2025 · completed Jul 23, 2026 · Permit 25 163033 DRN

    Closed
Show 2 more permits
  • Small residential project · Underpinning

    Proposal to underpin the foundation with unfinished basement.

    Applied Oct 29, 2024 · issued Nov 4, 2024 · completed Jul 10, 2026 · Permit 24 232340 BLD

    Closed
  • Drains and site services

    Drain - Proposal to underpin the foundation with unfinished basement.

    Applied Oct 29, 2024 · issued Nov 4, 2024 · completed Jul 10, 2026 · Permit 24 232340 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To alter the existing two-storey detached dwelling by constructing a complete third floor addition, and a rear basement walkout with stairs. There will be a total of four residential dwelling units on this lot.

    Decision: Approved (hearing Jun 11, 2025)

    Filed Dec 10, 2024 · File A1063/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Markham St · Minor variance

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the…

    180 m away · filed Aug 17, 2026 · Hearing scheduled

  • 157 Wolseley St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.

    110 m away · filed May 29, 2026 · Approved

  • 701 Queen St W · Minor variance

    To construct a new three-storey attached mixed-use building, abutting a rear lane, with a rear ground floor patio, a rear second floor partially covered deck with stairs, and a rear third floor deck with stairs. There will be a total of three units within the mixed-use building (one commercial unit on the and basement and first storey, one residential dwelling unit on the second storey, and one residential dwelling unit on the third storey) and no visitor parking spaces will be provided.

    150 m away · filed Aug 18, 2024 · Approved

  • 51 Robinson St · Minor variance

    To construct a new one-storey ancillary building (garden suite in the rear yard, abutting Palmerston Road) of the existing two-storey townhouse dwelling. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    150 m away · filed Aug 18, 2024 · Approved

  • 69 Markham St · Minor variance

    To construct a new three-storey detached dwelling with a rear basement walkout, a third floor south facing terrace, and an in-ground swimming pool. The existing detached garage, abutting the laneway, will be maintained.

    200 m away · filed Oct 14, 2022 · Approved

  • 55 Markham St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition and to install a secondary suite within the basement. Also, to construct a two-storey ancillary building (laneway suite) in the rear, abutting the laneway.

    150 m away · filed Aug 16, 2022 · Approved

  • 139 Wolseley St · Minor variance

    To construct a two-storey detached dwelling with a front porch.

    80 m away · filed Sep 13, 2021 · Approved

  • 71 Euclid Ave · Minor variance

    To convert the existing two-storey one-unit semi-detached dwelling to a two-storey two-unit semi-detached dwelling by creating a secondary suite in the basement.

    230 m away · filed May 19, 2021 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.