Toronto address · Ward 10, Spadina-Fort York
132 Crawford St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Administrative permit for work being completed at 130 Crawford St - interior alterations, with ground and second floor additions. (20-212796)
Applied Nov 4, 2020 · issued Dec 2, 2020 · completed Sep 8, 2025 · Permit 20 214780 BLD
- Closed
Small residential project · Party wall admin permits
Proposal for a party wall admin permit related to the underpinning project on 130 CRAWFORD ST (20 184190 BLD 00 SR)
Applied Aug 22, 2020 · issued Aug 31, 2020 · completed Sep 5, 2025 · Permit 20 184192 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
13 storeys · Mixed use
460 m away · Site plan · Under review · filed Dec 24, 2021
- Under review
17 storeys · 227 homes · Mixed use
480 m away · Site plan · Under review · filed Sep 8, 2022
- Approved
938-950 King Street West and 95-99 Strachan Avenue
18 storeys · 229 homes · Mixed use
500 m away · Site plan · Approved · filed Aug 4, 2021
Neighbours’ Committee of Adjustment files within 250 m
106 Massey St · Minor variance
200 m away · filed Aug 12, 2026 · Postponed
205 Crawford St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing the front porch (below the existing front second storey balcony) for habitable space and by constructing a rear ground floor addition (enclosed sunroom).
250 m away · filed May 25, 2026 · Approved
192 Crawford St · Minor variance
To construct a new two-storey detached ancillary building (containing a one-car garage on a portion of the ground level, and one laneway suite occupying the basement, ground, and second levels). There will be a total of three residential dwelling units on this lot (two units occupying the main dwelling, and one unit occupying the ancillary building).
180 m away · filed Feb 25, 2026 · Approved
155 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the one-storey addition), and a partial third storey addition with a rear balcony.
70 m away · filed Feb 20, 2026 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey cantilevered addition. Also, to alter the existing rear one-storey ancillary building (garage) by constructing a new cantilevered second storey laneway suite addition. There will be a total of two residential dwelling units (one unit occupying the main dwelling and one unit occupying the laneway suite).
60 m away · filed Jun 6, 2025 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition and to construct a new laneway suite (second floor) above existing garage in the rear yard.
60 m away · filed Jun 6, 2025 · Application withdrawn
112 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, front and rear rooftop patios (above the third floor addition) with an enclosed rooftop access staircase, a rear basement addition, and a rear ground floor deck (above the rear basement addition).
110 m away · filed Aug 7, 2024 · Approved
3 Rebecca St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a front balcony.
220 m away · filed Jun 29, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.