Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

132 Queens Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Rev01- Proposed revision, interior alterations, owners decided not construct rear additionProposed ground floor addition, finished basement and interior alterations to existing single family dwelling.

    Applied Jun 20, 2023 · issued Sep 12, 2023 · completed Nov 29, 2023 · Permit 22 151820 BLD (revision 01)

    Closed
  • Heating and ventilation

    REV 01 - Proposed forced air system instead of boiler

    Applied Apr 26, 2023 · issued May 17, 2023 · completed Nov 29, 2023 · Permit 22 151820 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed ground floor addition, finished basement and interior alterations to existing single family dwelling.

    Applied Jun 22, 2022 · issued Aug 3, 2022 · completed Nov 29, 2023 · Permit 22 151820 HVA

    Closed
  • Plumbing

    Plumbing - Proposed ground floor addition, finished basement and interior alterations to existing single family dwelling.

    Applied May 26, 2022 · issued Aug 3, 2022 · completed Nov 29, 2023 · Permit 22 151820 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed ground floor addition, finished basement and interior alterations to existing single family dwelling.

    Applied May 26, 2022 · issued Aug 3, 2022 · completed Nov 29, 2023 · Permit 22 151820 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a one-storey rear addition with a new rear deck.

    Decision: Approved (hearing Apr 5, 2022)

    Filed Jan 17, 2022 · File A0038/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 63 Station Rd · Minor variance

    To convert the existing building under construction into an apartment building containing 8 dwelling units.

    240 m away · filed Feb 17, 2026 · Deferred

  • 40 Mimico Ave · Minor variance

    To maintain an existing enclosed porch and parking space located in the front yard.

    110 m away · filed Sep 10, 2024 · Approved

  • 120 Wheatfield Rd · Minor variance

    To permit a soft landscaping deficiency in the rear yard.

    160 m away · filed Oct 12, 2023 · Refused

  • 63 Queens Ave · Minor variance

    To construct a one-storey front addition, a second and third storey addition above the existing dwelling and to convert the basement into a secondary suite.

    230 m away · filed Mar 6, 2023 · Approved

  • 61 Queens Ave · Minor variance

    To construct a one-storey rear addition and a two-storey addition above the existing dwelling. The existing detached garage in the rear yard will be maintained.

    230 m away · filed Oct 20, 2022 · Approved

  • 37 Elizabeth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    240 m away · filed Apr 26, 2022 · Approved

  • 96 Stanley Ave · Minor variance

    To construct a one-storey rear and west side addition that will include an enlarged attached garage, a partial second storey addition and a rear yard deck.

    150 m away · filed Feb 9, 2022 · Approved

  • 41 Superior Ave · Consent

    To obtain consent to sever the property into two residential lots.

    250 m away · filed Jan 27, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.