Toronto address · Ward 10, Spadina-Fort York
136 Markham St
The City of Toronto has 5 building permits since 2017 (3 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Construct a rear two storey addition, interior alterations, rear deck and basement walkout, and convert basement to secondary suite. Townhouse.
Applied Dec 4, 2020 · issued Dec 7, 2020 · completed Aug 18, 2021 · Permit 19 262120 HVA
- Revision issued
Small residential project · Multiple projects
Revision to foundation wall underpinning
Applied May 12, 2020 · issued May 22, 2020 · Permit 19 262120 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Construct a rear two storey addition, interior alterations, rear deck and basement walkout, and convert basement to secondary suite. Townhouse.
Applied Dec 17, 2019 · issued Jan 9, 2020 · 1 home added · Permit 19 262120 BLD
- Inspections under way
Plumbing
Plumbing - Construct a rear two storey addition, interior alterations, rear deck and basement walkout, and convert basement to secondary suite
Applied Dec 17, 2019 · issued Jan 9, 2020 · Permit 19 262120 PLB
- Closed
Small residential project · Other
Administrative partywall permit in conjunction with 12 236154 BLD, 134 Markham Street.
Applied Sep 27, 2012 · issued Sep 27, 2012 · completed Jul 7, 2017 · Permit 12 254673 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey townhouse by constructing a basement secondary suite and a rear two-storey addition with a rear deck and basement walkout.
Decision: Approved (hearing Aug 28, 2019)
Filed Apr 4, 2019 · File A0343/19TEY
- Closed
Minor variance · R addition
To convert the basement of the existing two-storey townhouse into a dwelling unit and to construct a rear two-storey addition.
Decision: Withdrawn
Filed Jan 23, 2019 · File A0066/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
6 storeys · 49 homes · Mixed use
490 m away · Site plan · Under review · filed Oct 15, 2021
Neighbours’ Committee of Adjustment files within 250 m
74 Markham St · Minor variance
To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the…
180 m away · filed Aug 17, 2026 · Hearing scheduled
129 Palmerston Ave · Minor variance
To construct a new rear two-storey detached ancillary building (containing two laneway suites, each occupying the basement, first, and second levels) with a side (west) cantilever second storey. There will be a total of three residential dwelling units on this lot (one unit occupying the main dwelling, and two units occupying the ancillary building).
70 m away · filed Jul 9, 2026 · Approved
123 Palmerston Ave · Minor variance
To legalize and to maintain the canopy (along the south side and east rear side of the dwelling), which was constructed without an authorized building permit.
70 m away · filed Feb 24, 2026 · Approved
104 Markham St · Minor variance
To construct a new three-storey detached dwelling with a front basement walkout, a front covered porch with stairs, front second and third storey bay windows, a rear ground floor deck with stairs, and a rear third storey rooftop patio. Also, to construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot.
80 m away · filed Feb 5, 2026 · Approved
328 Bathurst St · Minor variance
To alter the existing one-storey detached ancillary building (garage in the rear yard, abutting the laneway) into one laneway suite. The parking space will be removed. The existing two-storey detached dwelling will be maintained and unaltered. There will be a total of two residential dwelling units on this lot (one dwelling unit within the main dwelling, and one unit within the ancillary building).
110 m away · filed Oct 1, 2025 · Approved
769 Dundas St W · Minor variance
To alter the existing two-storey attached building by constructing a rear second storey addition, and a third storey addition. There will be commercial on the ground level and one residential dwelling unit (occupying the second and third levels) on this site.
110 m away · filed Feb 19, 2025 · Approved
320 Bathurst St · Minor variance
To permit a rear outdoor patio in conjunction with the existing ground and second floor eating establishment.
110 m away · filed Aug 31, 2023 · Approved
179 Palmerston Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial third storey addition with a rear balcony, a front second storey balcony, a rear ground level concrete platform, and a canopy over the existing rear basement walkout.
220 m away · filed Jan 16, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.