The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for a second storey addition (23.90sqm) rear covered porch and interior alterations (213.65sqm).
Applied Jan 7, 2026 · issued Jan 22, 2026 · Permit 25 260859 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for a second storey addition (23.90sqm) rear covered porch and interior alterations (213.65sqm).
Applied Dec 1, 2025 · issued Dec 16, 2025 · Permit 25 260859 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for a second storey addition (23.90sqm) rear coverd porch and interior alterations (213.65sqm).
Applied Dec 1, 2025 · issued Dec 16, 2025 · Permit 25 260859 PLB
- Closed
Drains and site services · Back water valve (Sewer only)
bwv installation
Applied Jul 28, 2022 · issued Jul 29, 2022 · completed Aug 3, 2022 · Permit 22 183210 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey east side addition above the existing attached garage and a covered deck in the rear yard.
Decision: Approved (hearing May 29, 2025)
Filed Apr 15, 2025 · File A0157/25EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
32 Orchard Cres · Minor variance
To convert the existing attached garage into habitable space.
180 m away · filed Apr 17, 2026 · Approved
118 Thompson Ave · Minor variance
To convert the basement into a second unit and to construct a new covered front porch and a rear yard deck.
130 m away · filed Jul 14, 2025 · Approved
142 Thompson Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front platform, and a new deck in the rear yard.
60 m away · filed Jul 11, 2025 · Approved
17 Leland Ave · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front porch and a new rear deck.
190 m away · filed Nov 19, 2024 · Approved
1 Orchard Cres · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Oct 9, 2024 · Approved
17 Orchard Cres · Minor variance
230 m away · filed Feb 26, 2024 · Application withdrawn
30 Orchard Cres · Minor variance
To construct a two-storey rear addition, a new covered front porch and a new rear deck.
180 m away · filed Jun 29, 2023 · Approved
4 Leamington Ave · Minor variance
To construct a one-storey east side addition and a second storey addition above the existing dwelling.
240 m away · filed Jun 7, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.