Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

138 Brentwood Rd N

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal for interior alterations to the ground and 2nd floor of an existing SFD-detached dwelling.Proposal also includes converting the existing detached garage to a home office.

    Applied Apr 7, 2022 · issued Aug 9, 2022 · Permit 22 131807 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the ground and 2nd floor of an existing SFD-detached dwelling.

    Applied Apr 7, 2022 · issued Aug 9, 2022 · Permit 22 131807 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to the ground and 2nd floor of an existing SFD-detached dwelling.Proposal also includes converting the existing detached garage to a home office.

    Applied Apr 7, 2022 · issued Aug 9, 2022 · Permit 22 131807 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Belvale Ave · Minor variance

    To construct a two storey rear and north side addition, a one storey south side addition and a one storey front addition. The existing wood shed in the rear yard will be demolished. A previous Committee of Adjustment Decision (A280/15EYK) approved variances related to gross floor area, length and depth.

    130 m away · filed Apr 10, 2026 · Approved

  • 6 Princeton Rd · Minor variance

    To construct a third storey addition above the existing dwelling, a three-storey north side and rear addition, a new rear yard deck, a new one-storey cabana and a new pool in the rear yard. The existing detached garage in the rear yard will be demolished.

    180 m away · filed Feb 27, 2026 · Withdrawn

  • 59 Westrose Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Feb 4, 2026 · Approved

  • 7 Lynngrove Ave · Minor variance

    To construct a one-storey west side addition.

    250 m away · filed Nov 6, 2025 · Approved

  • 89 Westrose Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Apr 29, 2025 · Approved

  • 42 Highgate Rd · Minor variance

    To construct a rear two-storey addition to the existing dwelling, a second storey addition above the existing attached garage, a covered front porch, and a covered deck in the rear yard.

    130 m away · filed Jan 10, 2025 · Approved

  • 19 Kingsgrove Blvd · Minor variance

    To permit a front yard parking pad. A previous Committee of Adjustment application (A0064/23EYK) approved variances related to lot coverage, floor space index, side yard setback, platform location and roof eaves.

    90 m away · filed Nov 29, 2024 · Approved

  • 17 Highgate Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    80 m away · filed Sep 30, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.