Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

14 Willowhurst Cres

The City of Toronto has 5 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for addition and interior alteration to covert existing 2 unit SFD to 3 Units Dwelling.and rear deck

    Applied Oct 10, 2024 · issued Aug 25, 2025 · Permit 24 224675 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for addition and interior alteration to covert existing 2 unit SFD to 3 Units Dwelling.and rear deck

    Applied Oct 10, 2024 · issued Aug 25, 2025 · Permit 24 224675 HVA

    Permit issued
  • Small residential project · Multiple projects

    Proposal for addition and interior alteration to covert existing 2 unit SFD to 3 Units Dwelling.and rear deck

    Applied Oct 10, 2024 · issued Aug 25, 2025 · 1 home added · Permit 24 224675 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal to legalize the as-built basement apartment, enlarge the existing window, and driveway extension of the existing detached single family house.

    Applied Aug 16, 2022 · issued Oct 27, 2022 · completed Feb 27, 2023 · Permit 22 191195 HVA

    Closed
  • Small residential project · Second suite (New)

    Proposal to legalize the as-built basement apartment, enlarge the existing window, and driveway extension of the existing detached single family house.

    Applied Aug 16, 2022 · issued Oct 27, 2022 · completed Feb 27, 2023 · 1 home added · Permit 22 191195 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 2 Willowhurst Cres · Minor variance

    To construct a new two-storey detached dwelling with three residential units, an integral garage with vehicular access from Willowhurst Crescent, a side (north) porch, a rear basement walkout, a rear ground floor deck and a rear second storey balcony. The existing one-storey detached dwelling and shed will be demolished. NOTE: This item was previously rescheduled from the Committee of Adjustment hearing on December 4, 2024 hearing and deferred at the Committee of Adjustment hearing on January 16, 2025.

    70 m away · filed Oct 25, 2024 · Approved

  • 252 Tower Dr · Minor variance

    130 m away · filed Mar 8, 2024 · Deferred

  • 132 Ellington Dr · Minor variance

    To demolish the existing dwelling and to construct a new two storey detached dwelling.

    220 m away · filed Feb 15, 2024 · Approved

  • 18 Willowhurst Cres · Minor variance

    To permit the construction of a new 2-storey detached dwelling and integral garage.

    40 m away · filed Aug 26, 2021 · Approved

  • 12 Ilfracombe Cres · Minor variance

    To permit the construction of a front and rear porch roof cover, a rear frame garage and front concrete stairs.

    240 m away · filed Dec 15, 2020 · Approved

  • 1 Rossford Rd · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new second storey addition to the existing one and a half storey dwelling with a two storey front and side addition.

    210 m away · filed Jul 13, 2017 · Approved

  • 1343 Warden Ave · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey rear addition and a second storey to the existing dwelling.

    180 m away · filed Jun 9, 2017 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.