The City of Toronto has 10 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Partial permit · Partial permit - foundation
Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project
Applied Jan 16, 2026 · Permit 24 137195 FND
- Cancelled
Addition or alteration · Other
The proposed work will include excavation works to construct the future Scarborough Centre Station
Applied Dec 3, 2025 · completed Jan 22, 2026 · Permit 25 261783 BLD
- Under review
Alternative solution
To remove the requirement for standard prescriptive provisions (sprinkler coverage, full-height access, emergency lighting, and additional passive fire separations) within a 1 m high crawl space underneath each platform, as the inclusion of such in a space with limited height access may be impractical.
Applied Nov 4, 2025 · Permit 25 248884 ALT
- Deficiency notice issued
Alternative solution
The proposed alternative solution required for OBC Div. B 3.13.3.3 (4) - Service Rooms and Ancillary Spaces demonstrates compliance with the minimum performance level and objectives, as outlined in the assessment presented.
Applied Nov 4, 2025 · Permit 25 248877 ALT
- Deficiency notice issued
Alternative solution
It is proposed to instead supply emergency power from two alternate power supplies from Toronto Hydro in lieu of one primary power supply from Toronto Hydro and a back-up generator as prescribed by the OBC.
Applied Nov 4, 2025 · Permit 25 248874 ALT
- Under review
Alternative solution
The proposed alternative solution is to extend the prescribed 15 m maximum distance from the principal building entry to the fire department access route by 5 m, to a total of 20 m.
Applied Nov 4, 2025 · Permit 25 248882 ALT
- Deficiency notice issued
Alternative solution
Proposal to remove the requirement for a 1-hour fire-rated enclosure around the elevator shafts by implementing controls such as the minimization of fire loads adjacent to elevator shafts, installing smoke detectors in the top of shafts, fire separating shafts from service floors, and installing laminated glazing to limit the potential for glazing failure under heating stresses.
Applied Nov 3, 2025 · Permit 25 248426 ALT
- Permit issued
Temporary structure · Temporary structures
Proposal to place the temporary site trailers in the laydown area for the proposed Scarborough Centre Station
Applied Jun 16, 2025 · issued Aug 22, 2025 · Permit 25 177912 TPS
- Superseded
Partial permit · Partial permit - shoring
Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project
Applied May 2, 2025 · completed Jul 23, 2026 · Permit 24 137195 SHO
- Examiner's notice sent
New building
Construction of the Scarborough Centre Station for the SSE-SRS project
Applied Apr 17, 2024 · Permit 24 137195 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
59 storeys · 1,695 homes · Mixed use
180 m away · Rezoning · Approved · filed Jan 9, 2025
- Under review
40 storeys · Residential
220 m away · Site plan · Under review · filed Dec 31, 2021
- Under review
53 storeys · 561 homes · Residential
340 m away · Site plan · Under review · filed Jun 23, 2023
- Under appeal
55 storeys · 1,412 homes · Mixed use
380 m away · Rezoning · Under appeal · filed Mar 4, 2022
- Submitted
- Under review
Neighbours’ Committee of Adjustment files within 250 m
300 Consilium Pl · Consent
To obtain consent for a technical severance of the property to re-establish two lots which merged on title. Cross-Reference 20 160281 ESC 24 OZ
230 m away · filed Dec 11, 2023 · Approved
100 Consilium Pl · Minor variance
To permit recreational uses as a primary use. NOTE: This minor variance application applies to the property municipally known as 350 Consilium Place.
140 m away · filed May 25, 2023 · Approved
675 Progress Ave · Consent
Proposal to sever a 30 m2 parcel of land along the Progress Avenue frontage to be conveyed to the adjacent land shown as PART 2 on the attached plan. The parcels shown as PART 2 and PART 3 were created by severance in June, 2018 under File B0021/18SC.
200 m away · filed Dec 2, 2019 · Approved
675 Progress Ave · Consent
This application is for consent to sever the land into two parcels, shown as PART 2 and PART 3 on the attached draft Reference Plan. A separate application for subdivision approval will create blocks for a future mixed use development, a block for a public park, and public road allowances (File 20 13 175005 ESC 38 SB).
200 m away · filed Apr 13, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.