Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

141 Craighurst Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REVISION 01: convert the house into SFD and to eliminate the legal basement apartmentProposed second and third floor addition, interior alterations, basement apartment, walkout, deck, and balcony.

    Applied Nov 1, 2024 · issued Nov 12, 2024 · completed Dec 30, 2024 · 1 home removed · Permit 24 104136 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed second and third floor addition, interior alterations, basement apartment, walkout, deck, and balcony.

    Applied Jan 12, 2024 · issued Feb 13, 2024 · completed Dec 30, 2024 · Permit 24 104136 HVA

    Closed
  • Plumbing

    Plumbing - Proposed second and third floor addition, interior alterations, basement apartment, walkout, deck, and balcony.

    Applied Jan 12, 2024 · issued Feb 13, 2024 · completed Dec 12, 2024 · Permit 24 104136 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed second and third floor addition, interior alterations, basement apartment, walkout, deck, and balcony.

    Applied Jan 12, 2024 · issued Feb 13, 2024 · completed Dec 30, 2024 · 1 home added · Permit 24 104136 BLD

    Closed
  • Drains and site services

    Drain - Proposed second and third floor addition, interior alterations, basement apartment, walkout, deck, and balcony.

    Applied Jan 12, 2024 · issued Feb 13, 2024 · completed Oct 30, 2024 · Permit 24 104136 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 84 Alexandra Blvd · Minor variance

    To construct a one storey rear addition to the existing dwelling.

    250 m away · filed Mar 3, 2026 · Approved

  • 172 Briar Hill Ave · Minor variance

    To construct a new dwelling. Further to the previous Public Hearing Notice, an additional variance has been added that was inadvertently missed in conjunction with other revisions, as outlined below.

    180 m away · filed Dec 18, 2025 · Approved

  • 158 Albertus Ave · Minor variance

    To construct a 3rd storey front addition, a 2 storey rear addition, and rebuild the existing front porch.

    70 m away · filed Sep 11, 2025 · Approved

  • 57 Lytton Blvd · Minor variance

    Proposal to demolish existing single family dwelling and construct a new 4-unit multiplex building.

    150 m away · filed Apr 25, 2025 · Approved

  • 33 Lytton Blvd · Minor variance

    To construct an inground pool in the rear yard.

    210 m away · filed Apr 25, 2025 · Approved

  • 145 Rosewell Ave · Minor variance

    To construct a second storey addition to the rear of the existing dwelling.

    190 m away · filed Apr 1, 2025 · Approved

  • 71 Alexandra Blvd · Minor variance

    To construct a new detached dwelling and a garden suite

    220 m away · filed Apr 26, 2024 · Approved

  • 160 Albertus Ave · Minor variance

    To construct 2-storey rear addition to existing 2-storey detached dwelling and add new third floor.

    80 m away · filed Mar 13, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.