Toronto address · Ward 3, Etobicoke-Lakeshore
141 Prince Edward Dr S
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Interior alterations to the existing basement including new interior finishes, re-fixtured and moved bathroom, added insulation and new furnace. Replacement of all windows in existing openings. Addition of a porch with an unheated cantina below. Replacing the existing roof over the bedroom suite over the garage and adding a bathroom over the garage.
Applied Jun 14, 2022 · issued Jul 7, 2022 · completed Apr 24, 2024 · Permit 22 159941 HVA
- Closed
Plumbing
Plumbing - Interior alterations to the existing basement including new interior finishes, re-fixtured and moved bathroom, added insulation and new furnace. Replacement of all windows in existing openings. Addition of a porch with an unheated cantina below. Replacing the existing roof over the bedroom suite over the garage and adding a bathroom over the garage.
Applied Jun 14, 2022 · issued Jul 7, 2022 · completed Apr 24, 2024 · Permit 22 159941 PLB
- Closed
Drains and site services
Drain - Interior alterations to the existing basement including new interior finishes, re-fixtured and moved bathroom, added insulation and new furnace. Replacement of all windows in existing openings. Addition of a porch with an unheated cantina below. Replacing the existing roof over the bedroom suite over the garage and adding a bathroom over the garage.
Applied Jun 14, 2022 · issued Jul 7, 2022 · completed Apr 24, 2024 · Permit 22 159941 DRN
- Closed
Small residential project · Multiple projects
Interior alterations to the existing basement including new interior finishes, re-fixtured and moved bathroom, added insulation and new furnace. Replacement of all windows in existing openings. Addition of a porch with an unheated cantina below. Replacing the existing roof over the bedroom suite over the garage and adding a bathroom over the garage.
Applied Jun 9, 2022 · issued Jul 7, 2022 · completed May 28, 2024 · Permit 22 159941 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
17 Kirk Bradden Rd E · Minor variance
To construct a new detached dwelling with an attached garage.
110 m away · filed Jan 20, 2026 · Approved
9 Kirk Bradden Rd E · Minor variance
To construct a partial second storey addition on the existing dwelling.
70 m away · filed Dec 24, 2025 · Approved
9 Fairmar Ave · Minor variance
To construct a new detached dwelling with an attached garage.
180 m away · filed Aug 25, 2025 · Approved
15 Reid Manor · Minor variance
To construct a new detached dwelling with an attached garage.
220 m away · filed Aug 11, 2025 · Approved
7 Kirk Bradden Rd E · Minor variance
To construct a new detached dwelling with an attached garage.
50 m away · filed Aug 6, 2025 · Approved
7 Fairmar Ave · Minor variance
To construct a second storey addition above the existing garage, a rear two-storey addition and a new covered porch in the rear yard.
180 m away · filed Jun 9, 2025 · Approved
32 Bernice Ave · Minor variance
To construct rear two-storey addition and second storey addition above the existing dwelling along with a cabana in the rear yard.
220 m away · filed Sep 12, 2024 · Approved
2 Bernice Ave · Minor variance
To construct an accessory structure (cabana) in the rear yard. A previous Committee of Adjustment application (A0293/23EYK) approved variances related to a new dwelling on the property.
60 m away · filed May 29, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.