Toronto address · Ward 20, Scarborough Southwest
141 South Edgely Ave
The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
Rev 01: Revised walkout locationProposal to underpin and construct a basement walkout in an existing 2 storey SFD-detached dweling.
Applied Feb 6, 2020 · issued Feb 28, 2020 · Permit 19 127894 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposal to underpin and construct a basement walkout in an existing 2 storey SFD-detached dweling.
Applied Mar 19, 2019 · issued May 17, 2019 · Permit 19 127894 BLD
- Inspections under way
Drains and site services
Drain - Proposal to underpin and construct a basement walkout in an existing 2 storey SFD-detached dweling.
Applied Mar 19, 2019 · issued May 17, 2019 · Permit 19 127894 DRN
- Inspections under way
Plumbing
Plumbing - Proposal to underpin and construct a basement walkout in an existing 2 storey SFD-detached dweling.
Applied Mar 19, 2019 · issued May 17, 2019 · Permit 19 127894 PLB
- Closed
Heating and ventilation
HVAC - 2 storey rear addition and interior alterations to existing main and second floors
Applied Mar 15, 2016 · issued May 26, 2016 · completed Oct 2, 2017 · Permit 16 127822 HVA
- Closed
Plumbing
Plumbing - 2 storey rear addition and interior alterations to existing main and second floors
Applied Mar 15, 2016 · issued Apr 12, 2016 · completed Oct 2, 2017 · Permit 16 127822 PLB
- Closed
Small residential project · Multiple projects
2 storey rear addition and interior alterations to existing main and second floors
Applied Mar 15, 2016 · issued Apr 12, 2016 · completed Oct 2, 2017 · Permit 16 127822 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
100 Lillington Ave · Minor variance
To construct a new two-storey detached dwelling.
190 m away · filed Dec 1, 2022 · Approved
97 South Edgely Ave · Consent
To obtain consent to sever the property into two residential lots. The Committee of Adjustment approved the severance of the property into two parts in 2018, but the conditions were not met within one year and the approval lapsed (File B0037/18SC). The owner is now requesting consent to sever the property into two parts in the same configuration previously approved by the Committee of Adjustment.
130 m away · filed Nov 28, 2022 · Approved
121 Lillington Ave · Minor variance
To construct a new two-storey detached dwelling.
110 m away · filed Nov 30, 2021 · Approved
188 South Woodrow Blvd · Consent
This application is a consent to sever the property into two lots.
70 m away · filed Feb 16, 2021 · Application withdrawn
188 South Woodrow Blvd · Minor variance
To construct a new two-storey detached dwelling.
70 m away · filed Feb 16, 2021 · Approved
188 South Woodrow Blvd · Minor variance
To construct a new two-storey detached dwelling.
70 m away · filed Feb 16, 2021 · Approved
84 South Edgely Ave · Minor variance
To construct a new detached garage in the rear of the property.
180 m away · filed Aug 20, 2020 · Approved
97 South Edgely Ave · Consent
This application is for consent to sever the land into two lots, as shown on the attached Site Plan. Lots to be created Part 1 and Part 2 would have a frontage of 7.6 metres and a lot area of 294.9 square metres. In order to facilitate the proposed development, relief from the provision of the Zoning By-law was requested, as outlined in A0211/18SC and A0212/18SC.
130 m away · filed Jun 11, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.