143 Buckingham Ave
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal for a 3 story single family dwelling with attached double garage.
Applied Jun 9, 2025 · issued Jun 23, 2025 · Permit 24 248488 HVA
- Revision issued
New house · New building
REV: addition of 0.3m parapet and structural changes to all floors as bubbledProposal for a 3 story single family dwelling with attached double garage.
Applied Mar 26, 2025 · issued May 28, 2025 · Permit 24 248488 BLD (revision 01)
- Permit issued
Plumbing
Plumbing - Proposal for a 3 story single family dwelling with attached double garage.
Applied Dec 19, 2024 · issued Jan 24, 2025 · Permit 24 248488 PLB
- Permit issued
Drains and site services
Drain - Proposal for a 3 story single family dwelling with attached double garage.
Applied Dec 19, 2024 · issued Jan 24, 2025 · Permit 24 248488 DRN
- Permit issued
Demolition
Proposal for a 3 story single family dwelling with attached double garage.
Applied Dec 17, 2024 · issued Jan 24, 2025 · 1 home removed · Permit 24 251460 DEM
- Permit issued
New house · New building
Proposal for a 3 story single family dwelling with attached double garage.
Applied Dec 9, 2024 · issued Jan 24, 2025 · 1 home added · Permit 24 248488 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
Proposal to construct a new single family dwelling
Decision: Refused (hearing Apr 27, 2023)
Filed Mar 13, 2023 · File A0141/23NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
135 Cheltenham Ave · Minor variance
To construct a three-storey detached dwelling an integral garage and a covered front porch.
110 m away · filed Sep 8, 2026 · Hearing scheduled
124 Cheltenham Ave · Minor variance
To alter the existing detached dwelling by constructing a partially covered rear deck with upper and lower levels, and a storage room addition below.
110 m away · filed Apr 21, 2026 · Hearing scheduled
136 Cheltenham Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch and rear deck. Please note, this application was previously deferred by the Committee of Adjustment on April 30, 2026.
70 m away · filed Mar 5, 2026 · Approved
154 Rochester Ave · Minor variance
To construct a new dwelling.
180 m away · filed Jan 19, 2026 · conditional approval
136 Cheltenham Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch, basement walkout, covered deck and balcony in the rear yard of the property.
70 m away · filed Nov 20, 2025 · Refused
34 Mildenhall Rd · Minor variance
To construct an addition over the existing attached garage in conjunction with other interior and exterior alterations to the existing dwelling. Please note a previous application (A0381/25NY) with respect to the subject property was before the Committee of Adjustment on Thursday, October 23, 2025.
160 m away · filed Oct 8, 2025 · Approved
34 Mildenhall Rd · Minor variance
To legalize and maintain the existing landscape conditions. Please note this application was previously deferred Thursday, October 23, 2025.
160 m away · filed Sep 15, 2025 · Refused
115 Cheltenham Ave · Minor variance
To construct a new dwelling. Please note, this application was previously deferred Thursday, October 24, 2024.
200 m away · filed Sep 12, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.