Toronto address · Ward 9, Davenport
143 Emerson Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to legalize existing detached garage constructed in 2012 in the rear yard of the existing single family dwelling. See order 12-184666 WNP 00 VI.
Applied Apr 13, 2016 · issued Sep 29, 2016 · completed Jan 13, 2026 · Permit 16 139770 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
390 m away · Rezoning · Under review · filed May 14, 2026
- Under review
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
50 storeys · 588 homes · Residential
440 m away · Site plan · Under review · filed Mar 25, 2026
- Under appeal
1260 Dufferin Street, 1245 Dupont Street and 213 Emerson Avenue
37 storeys · 3,547 homes · Residential
440 m away · Rezoning · Under appeal · filed Apr 5, 2022
Neighbours’ Committee of Adjustment files within 250 m
45 Armstrong Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.
240 m away · filed May 15, 2026 · Approved
80 Armstrong Ave · Minor variance
To alter the existing rear one-storey detached ancillary building (two-car garage, abutting the laneway) by constructing a complete second storey addition (cantilevered at the south side of the building), to contain one laneway suite. There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).
200 m away · filed Mar 3, 2026 · Approved
111 Emerson Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front ground floor deck with stairs and privacy screening (located beyond the existing front enclosed porch).
140 m away · filed Feb 24, 2026 · Approved
656 St Clarens Ave · Minor variance
To legalize and to maintain the conversion of the existing two-storey mixed-use building into a houseplex, without an authorized building permit. There is a total of five residential dwelling units on this lot.
240 m away · filed Nov 14, 2025 · Approved
750 Brock Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.
190 m away · filed Sep 12, 2025 · Approved
172 Emerson Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition (removing the existing attic and dormers). The existing gutter at the third storey level will be maintained and unaltered. Also, to reconstruct the existing rear one-storey addition.
170 m away · filed Jul 9, 2025 · Approved
107 Lappin Ave · Minor variance
To permit a portion of the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) from the abutting westerly property, municipally known as 109 Lappin Avenue (as approved under Committee of Adjustment File A0465/24TEY), which encroaches onto this lot. Also, the existing garage height, gable roof, and eaves will be maintained and unaltered.
210 m away · filed Jun 2, 2025 · Approved
98 Millicent St · Minor variance
To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).
200 m away · filed Jan 27, 2025 · Postponed
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.