Toronto address · Ward 9, Davenport
145 Symington Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct a 3rd storey addition and interior alterations to the 2nd floor to create a secondary suite. Conversion to 2-unit house.
Applied May 27, 2019 · issued Jun 20, 2019 · completed Oct 9, 2019 · Permit 18 257100 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a 3rd storey addition and interior alterations to the 2nd floor to create a secondary suite. Conversion to 2-unit house.
Applied May 27, 2019 · issued May 27, 2019 · completed Oct 17, 2019 · Permit 18 257100 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a 3rd storey addition and interior alterations to the 2nd floor to create a secondary suite. Conversion to 2-unit house.
Applied Nov 15, 2018 · issued May 23, 2019 · completed Feb 17, 2026 · 1 home added · Permit 18 257100 BLD
- Closed
Plumbing
Plumbing - Proposed relocation of stairs and underpinning in basement of an existing single family semi-detached dwelling.
Applied Oct 25, 2018 · issued Oct 25, 2018 · completed Dec 12, 2025 · Permit 18 216008 PLB
- Closed
Small residential project · Multiple projects
Proposed relocation of stairs and underpinning in basement of an existing single family semi-detached dwelling.
Applied Aug 27, 2018 · issued Oct 5, 2018 · completed Feb 17, 2026 · Permit 18 216008 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by establishing a second dwelling unit and by constructing a third storey with rear second storey and third storey decks.
Decision: Approved (hearing Apr 17, 2019)
Filed Dec 13, 2018 · File A1178/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
350 m away · Rezoning · Under review · filed May 14, 2026
- Under review
29 storeys · 288 homes · Mixed use
440 m away · Site plan · Under review · filed Jul 25, 2024
- Under review
21 storeys · 861 homes · Residential
440 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
42 storeys · 56 homes · Not stated in the file
440 m away · Site plan · Under review · filed Jun 27, 2025
- Under review
19 storeys · 325 homes · Mixed use
470 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
480 m away · Site plan · Under review · filed Aug 20, 2021
Neighbours’ Committee of Adjustment files within 250 m
209 Symington Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level) with a covered deck and stairs.
210 m away · filed Jul 28, 2026 · Approved
261 Perth Ave · Minor variance
To alter the existing semi-detached dwelling by constructing a partial rear second storey addition (that will partially be cantilevered), and a front basement walkout with stairs. There are two residential dwelling units in this dwelling.
140 m away · filed Jul 7, 2026 · Approved
193 Rankin Cres · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.
170 m away · filed May 6, 2025 · Approved
182 Symington Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting Royce Lane.
100 m away · filed Nov 7, 2024 · Approved
105 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.
160 m away · filed Jan 17, 2024 · Refused
104 Campbell Ave · Minor variance
To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.
200 m away · filed Dec 12, 2023 · Approved
89 Symington Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear third storey deck, and a rear ground floor deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
150 m away · filed Oct 30, 2023 · Approved
105 Campbell Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.
160 m away · filed Jun 1, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.