Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

15 Rushbrooke Ave

The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    Rev 02: revision to shed & carport, removal of insulation, concealed gutter and simplified carport post designRev 01: revision to remove carport from scopeDetached shed and carport in the rear yard

    Applied Mar 26, 2026 · issued Mar 27, 2026 · Permit 24 247161 BLD (revision 02)

    Revision issued
  • Small residential project · Accessory Building(s)

    Rev 01: revision to remove carport from scopeDetached shed and carport in the rear yard

    Applied Mar 3, 2026 · completed Mar 4, 2026 · Permit 24 247161 BLD (revision 01)

    Cancelled
  • Small residential project · Accessory Building(s)

    Detached shed and carport in the rear yard

    Applied Dec 5, 2024 · issued Dec 12, 2024 · Permit 24 247161 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 28 Rushbrooke Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space) with stairs, and to construct a rear one-storey sunroom addition with stairs , and a rear second floor balcony.

    40 m away · filed Jul 17, 2025 · Approved

  • 789 Eastern Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear basement walkout with a terrace, and a rear two-storey addition with a ground floor deck. Also, to construct a rear parking pad (two vehicular parking spaces), abutting the laneway. There will be a total of two residential dwelling units on this lot (one primary unit and one secondary suite in the basement).

    110 m away · filed Dec 11, 2024 · Deferred

  • 20 Leslie St · Minor variance

    To permit a personal service shop within the second storey (northwestern corner) of the existing two-storey detached building, use within the two-storey detached building.

    150 m away · filed Jan 20, 2024 · Approved

  • 20 Leslie St · Minor variance

    To permit a commercial use on the ground floor of the existing three-storey building, which will be independent of any permitted manufacturing use on the same lot.

    150 m away · filed Oct 4, 2022 · Approved

  • 2 Marigold Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front ground floor addition, and reconstructing the front porch and stairs.

    50 m away · filed Aug 12, 2022 · Approved

  • 67 Leslie St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition with a rooftop terrace, balconies on the second and third levels, and a rear ground floor deck. Also, to construct a secondary suite within this dwelling, which will occupy the basement and first levels.

    220 m away · filed Jun 27, 2022 · Approved

  • 13 Larchmount Ave · Minor variance

    To convert the existing enclosed porch into living space.

    170 m away · filed Jan 20, 2022 · Approved

  • 17 Rushbrooke Ave · Minor variance

    To alter the existing 1½-storey semi-detached dwelling by constructing a rear deck with a pergola, a lower deck and a detached carport in the rear yard.

    0 m away · filed Sep 15, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.