Toronto address · Ward 3, Etobicoke-Lakeshore
150 Berry Rd
The City of Toronto has 14 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
Application for a permit to erect and display one first party illuminated wall sign, displaying static copy located at first storey of east elevation.Dimensions:0.48m L x 2.98m W x 0.1m D at a height of 4.07m.*****ALTARA MD*****
Applied Apr 22, 2022 · issued May 10, 2022 · completed Jun 1, 2022 · Permit 22 137358 DST
- Closed
Designated structure · Sign building permit related
To erect two illuminated overhanging signs displaying static copy. The one on south elevation measuring 7.8 meters horizontally by 0.7 meters vertically at the height of 4.33 meters and the one on east elevation measuring 8.9 meters horizontally by 0.7 meters vertically at the height of 4.33 meters. ****F45****
Applied Jan 31, 2020 · issued Feb 19, 2020 · completed May 15, 2020 · Permit 20 110937 DST
- Closed
Designated structure · Sign building permit related
To erect and display two illuminated overhanging structure signs on the south and west elevations. One measuring 7.5 meters horizontally by 0.7 meters vertically at the height of 3.3 meters and one measuring 5.44 meters horizontally by 0.5 meters vertically at the height of 3.15 meters.****BERRY ROAD FOOD CO-OP****
Applied Jan 15, 2020 · issued Jan 27, 2020 · completed May 29, 2020 · Permit 20 103443 DST
- Closed
Designated structure · Sign building permit related
To erect and display one illuminated overhanging structure sign.****STONEGATE Community Health Centre****
Applied Mar 20, 2019 · issued Jun 14, 2019 · completed Oct 22, 2019 · Permit 19 128064 DST
- Closed
Designated structure · Sign building permit related
To erect and display two static illuminated wall signs.**VITAL URGENT CARE****IDA PHARMACY**
Applied Nov 28, 2018 · issued Dec 4, 2018 · completed Sep 25, 2019 · Permit 18 261712 DST
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a back flow prevention device
Applied Jul 31, 2017 · issued Aug 8, 2017 · completed Aug 10, 2017 · Permit 17 208813 PSA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alteration for a medical centre and pharmacy unit 103 & 104 in existing multiple unit building.
Applied Jul 14, 2017 · issued Jul 27, 2017 · completed Oct 4, 2019 · Permit 17 198851 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alteration for a medical centre and pharmacy unit 103 & 104 in existing multiple unit building.
Applied Jul 14, 2017 · issued Aug 15, 2017 · completed Apr 27, 2026 · Permit 17 198851 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alteration for a medical centre and pharmacy unit 103 & 104 in existing multiple unit building.
Applied Jul 14, 2017 · issued Aug 15, 2017 · completed Nov 5, 2018 · Permit 17 198851 PLB
- Closed
Demolition
Demolition of remainder of Building C Phase 4
Applied Sep 1, 2016 · issued Dec 19, 2016 · completed Jun 13, 2025 · Permit 16 216722 DEM
- Closed
Demolition
Proposal to demolish retail plaza, Building B, 2903.31m2 and part of Building C, 640.50m2.
Applied Feb 28, 2014 · issued Apr 9, 2014 · completed Jan 17, 2017 · Permit 14 122974 DEM
- Closed
Demolition
Demolition of existing one storey service centre.
Applied Feb 14, 2014 · issued Apr 9, 2014 · completed Jan 17, 2017 · Permit 14 117576 DEM
Show 2 more permits
- Closed
Plumbing
Plumbing - interior alterations to existing space to create dental office (UNIT 28) for Toronto Public Health
Applied Apr 6, 2011 · issued May 4, 2011 · completed Jun 10, 2025 · Permit 11 166477 PLB
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - *Stonegate Medical Health* Ground floor - Interior partitions to existing health care clinic- Expand office and washroom. Reduce child care room. Sprinkler work.
Applied May 14, 2008 · Permit 08 120340 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
144-150 Berry Road and 1-25 Neighbourhood Lane
10 storeys · 234 homes · Residential
80 m away · Condominium · Under review · filed May 16, 2022
Neighbours’ Committee of Adjustment files within 250 m
100 Stephen Dr · Minor variance
To maintain the existing semi-detached duplex with an attached garage and accessory structures in the rear yard.
230 m away · filed Nov 10, 2025 · Approved
100 Stephen Dr · Consent
To obtain consent to sever the lot into two under sized residential lots.
230 m away · filed Nov 10, 2025 · Approved
102 Stephen Dr · Minor variance
To permit the existing semi-detached duplex with an attached garage.
220 m away · filed Nov 10, 2025 · Approved
8 Newholm Rd · Minor variance
To alter the existing building by converting a portion of the existing indoor parking spaces into 4 additional dwelling units. The existing three-storey apartment building will contain a total of 31 dwelling units.
230 m away · filed Mar 3, 2025 · Approved
25 Neighbourhood Lane · Minor variance
To permit as-built parking deficiencies within the proposed 10-storey residential condominium with 5 levels of underground parking (Building C).
90 m away · filed Jan 18, 2023 · Approved
161 Berry Rd · Minor variance
To convert a portion of the existing basement into 1 additional dwelling unit. The building will contain a total of 6 dwelling units.
190 m away · filed May 3, 2022 · Approved
117 Stephen Dr · Minor variance
To construct an additional dwelling unit. A total of 5 dwelling units will be provided.
190 m away · filed Aug 25, 2021 · Approved
119 Stephen Dr · Minor variance
To legalize and maintain the existing building and parking deficiencies. A total of 6 dwelling units are provided.
180 m away · filed Jun 11, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.