Toronto address · Ward 3, Etobicoke-Lakeshore
150 Hay Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve
Applied Dec 4, 2017 · issued Dec 4, 2017 · completed Dec 7, 2017 · Permit 17 271224 DRN
- Closed
Heating and ventilation
HVAC - Proposal for a 2nd and 3rd floor addition, 2nd floor deck, interior alterations to basement and ground floors in proposed 2 unit dwelling.
Applied Jul 19, 2017 · issued Aug 25, 2017 · completed Nov 18, 2019 · Permit 17 201745 HVA
- Closed
Plumbing
Plumbing - Proposal for a 2nd and 3rd floor addition, 2nd floor deck, interior alterations to basement and ground floors in proposed 2 unit dwelling.
Applied Jul 19, 2017 · issued Aug 25, 2017 · completed Nov 18, 2019 · Permit 17 201745 PLB
- Closed
Small residential project · Multiple projects
Proposal for a 2nd and 3rd floor addition, 2nd floor deck, interior alterations to basement and ground floors in proposed 2 unit dwelling.
Applied Jul 19, 2017 · issued Aug 25, 2017 · completed Mar 13, 2020 · 1 home added · Permit 17 201745 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey cantilevered front addition, a third floor cantilevered rear addition, and to create a secondary suite.
Decision: Approved (hearing May 9, 2017)
Filed Mar 16, 2017 · File A0261/17EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
349 Melrose St · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Jan 29, 2026 · Approved
349 Melrose St · Consent
To obtain consent to sever the lot into two undersized residential lots.
240 m away · filed Jan 29, 2026 · Approved
349 Melrose St · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Jan 29, 2026 · Approved
139 Hay Ave · Minor variance
To construct a fourplex with an attached garage.
80 m away · filed Oct 2, 2025 · Refused
139 Hay Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
80 m away · filed Oct 2, 2025 · Refused
139 Hay Ave · Minor variance
To construct a fourplex with an attached garage.
80 m away · filed Oct 2, 2025 · Refused
360 Melrose St · Minor variance
To construct a new detached dwelling with an attached garage.
140 m away · filed Sep 26, 2024 · Approved
360 Melrose St · Consent
To obtain consent to sever the property into two undersized residential lots.
140 m away · filed Sep 26, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.