Toronto address · Ward 12, Toronto-St. Paul's
1515 Bathurst St
The City of Toronto has 22 building permits since 2017 (11 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing · Piping: other buildings
REV01: Proposed revision to revise location of chamer based on field measurementsProposal for a new 200 mm Fire Water Line
Applied Aug 7, 2026 · issued Sep 9, 2026 · Permit 26 188032 PSA (revision 01)
- Permit issued
Plumbing · Piping: other buildings
Proposal for a new 200 mm Fire Water Line
Applied Jun 19, 2026 · issued Jul 31, 2026 · Permit 26 188032 PSA
- Permit issued
Temporary structure · Temporary structures
Proposal to construct a temporary air supported structure (dome) in the same location from December 1st 2025 and dismantiled on March 9th, 2026.
Applied Oct 27, 2025 · issued Nov 27, 2025 · Permit 25 245103 TPS
- Closed
Temporary structure · Temporary structures
temporary air supported structure to be constructed on Dec 2nd 2024 and dismantled on march 10th 2025.
Applied Oct 30, 2024 · issued Nov 28, 2024 · completed Apr 7, 2025 · Permit 24 232950 TPS
- Inspections under way
Addition or alteration · Interior alterations
Proposal for structural repair of deteriorated open-web steel floor joists and concrete floor slab; Partial removal and replacement of concrete floor slab to facilitate construction access; Extents of work limited to east portion of ground floor
Applied Jun 7, 2024 · issued Jul 26, 2024 · Permit 24 161366 BLD
- Closed
Temporary structure · Temporary structures
Temporary Air Supported to be constructed on December 4th 2023 and dismantled on March 15th 2023..
Applied Nov 21, 2023 · issued Dec 11, 2023 · completed Apr 7, 2025 · Permit 23 228184 TPS
- Closed
Temporary structure · Temporary structures
Temporary Air Supported Structure to be constructed in the same location for past several years.
Applied Nov 16, 2022 · issued Dec 12, 2022 · completed Apr 7, 2025 · Permit 22 230116 TPS
- Closed
Temporary structure · Temporary structures
Temporary Air Supported Structure to be constructed, installation date Dec. 7/2021 and removal date March 14/2022.
Applied Dec 8, 2021 · issued Jan 19, 2022 · completed Apr 7, 2025 · Permit 21 246557 TPS
- Closed
Temporary structure · Certified tents
Proposal to install 4 30'*50' legacy tent structures. Install on 4th Septemeber, 2020 and remove on September 12, 2020.
Applied Aug 22, 2020 · issued Sep 3, 2020 · completed Apr 7, 2025 · Permit 20 184130 TPS
- Closed
Temporary structure · Temporary structures
Seasonal instalment of temporary air supported structure, to be erected August 17, 2020 and dismantled August 30, 2020.
Applied Aug 6, 2020 · issued Aug 24, 2020 · completed Apr 7, 2025 · Permit 20 177084 TPS
- Closed
Temporary structure · Temporary structures
Seasonal installment of temporary air supported structure. UP Dec 2nd 2019, DOWN March 9th 2019.
Applied Nov 19, 2019 · issued Dec 16, 2019 · completed Apr 7, 2025 · Permit 19 251086 TPS
- Closed
Temporary structure · Temporary structures
Seasonal installment of temporary air supported structure. UP Dec 3rd, 2018, DOWN Mar.11th, 2018.Original infrastrucuture constuction under 2004 137314 TPS.
Applied Nov 21, 2018 · issued Dec 13, 2018 · completed Apr 4, 2025 · Permit 18 259186 TPS
Show 10 more permits
- Closed
Temporary structure · Temporary structures
Seasonal installment of temporary air supported structure, to be erected Dec 6th, 2017 and to be taken down Mar.12, 2017. See last years permit 16-257692 TPS.
Applied Dec 1, 2017 · issued Dec 28, 2017 · completed Apr 19, 2018 · Permit 17 270046 TPS
- Closed
Temporary structure · Temporary structures
Seasonal installment of temporary air supported structure, to be erected Dec 2nd, 2016 and to be taken down Apr 1, 2016. See last years permit 15-261480 TPS.
Applied Nov 29, 2016 · issued Jan 17, 2017 · completed Apr 19, 2018 · Permit 16 257692 TPS
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior renovations (255m2) for St.Michaels College
Applied Jun 27, 2014 · issued Jul 9, 2014 · Permit 14 181897 BLD
- Inspections under way
Fire and security upgrade · Sprinklers
Proposal to install sprinkler system to new auditorium addition (1948.6m2) in relation to building permit 08-186525 BLD for St Michael's College School.
Applied Jan 12, 2009 · issued Feb 6, 2009 · Permit 09 101897 FSU
- Inspections under way
Heating and ventilation
HVAC - Permit for theatre addition to front west cornet of existing Secondary School
Applied Jul 25, 2008 · issued Dec 18, 2008 · Permit 08 186525 HVA
- Inspections under way
Plumbing
Plumbing - Permit for theatre addition to front west cornet of existing Secondary School
Applied Jul 25, 2008 · issued Dec 18, 2008 · Permit 08 186525 PLB
- Inspections under way
Addition or alteration · Addition(s)
New three storey auditorium addition at an existing school.**St. Michael's College School**
Applied Jul 25, 2008 · issued Dec 18, 2008 · Permit 08 186525 BLD
- Closed
Demolition
Demolition of exisitng student accommodation building associated with secondary school.**St Michael's College School**
Applied May 23, 2008 · issued Jun 27, 2008 · completed Aug 25, 2025 · Permit 08 161886 DEM
- Inspections under way
Non-residential building permit · Addition/Alteration to existing building
Addition and renovations to existing secondary school
Applied Jan 12, 2000 · issued Sep 19, 2000 · Permit 00 120378 CMB
- Inspections under way
Non-residential building permit · Partial permit - foundation
Foundation and excavation for three storey additon and renovations
Applied Nov 1, 1999 · issued Feb 21, 2000 · Permit 99 106759 PRT
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
40 storeys · 1,338 homes · Mixed use
170 m away · Condominium · Under review · filed Oct 25, 2021
- Under review
28 storeys · 210 homes · Residential
210 m away · Condominium · Under review · filed Nov 1, 2021
- Approved
37 storeys · 355 homes · Mixed use
230 m away · Site plan · Approved · filed Sep 16, 2022
- Approved
34 storeys · 440 homes · Mixed use
240 m away · Site plan · Approved · filed Apr 11, 2022
- Under review
26 storeys · 225 homes · Residential
250 m away · Site plan · Under review · filed Sep 16, 2021
- Under review
35 storeys · 380 homes · Mixed use
270 m away · Site plan · Under review · filed Aug 23, 2022
Neighbours’ Committee of Adjustment files within 250 m
1500 Bathurst St · Minor variance
To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.
130 m away · filed Sep 1, 2026 · Hearing scheduled
1467 Bathurst St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 648-2020) for a mixed-use building (Tower 1 (40-storeys), Tower 2 (35-storeys), and Tower 3 (37-storeys)), by reducing the residential bicycle parking space requirements. There will be a total of 1,338 residential dwelling units, 692 vehicular parking spaces (within a level below grade garage), 669 residential bicycle parking spaces, and 10 non-residential bicycle parking spaces will be provided on this lot.
150 m away · filed Nov 4, 2025 · Approved
5 Raglan Ave · Minor variance
To alter the development standards (as approved by site-specific Zoning By-law No. 531-2024(OLT)) for the 28-storey mixed-use building to increase the building height to 34 storeys, increase the gross floor area and modify building setbacks. There will be a total of 236 residential dwelling units on this lot. This is currently under the review of Site Plan Control (File No. 21 232984 STE 12 SA).
200 m away · filed May 20, 2025 · Refused
40 Raglan Ave · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building (including a mechanical penthouse), to permit indoor amenity space on the rooftop. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot. Committee of Adjustment considered and approved variances to the Zoning By-law under Minor Variance Decision A0686/24TEY, however the construction alterations necessitates further minor variances.
220 m away · filed Apr 11, 2025 · Approved
91 Raglan Ave · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2022), for a new 30-storey mixed-use building, by increasing building height, non-residential and residential gross floor areas, and decreasing outdoor amenity space, Site Plan Control Application File 20 21 213475 STE 12 SA, which is currently under review. There will be a total of 305 residential dwelling units on this lot.
230 m away · filed Feb 18, 2025 · Approved
40 Raglan Ave · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building, including a mechanical penthouse. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot.
220 m away · filed Aug 2, 2024 · Approved
370 St Clair Ave W · Minor variance
To construct a one-storey ancillary structure (above-grade exit stair enclosure with a below-grade service structure) in the north entrance of the property. The ancillary structure will be connected to the existing subway vent shaft.
220 m away · filed Jun 14, 2024 · Approved
191 Montclair Ave · Minor variance
To legalize and to maintain the ancillary structures (gazebo and pergolas), in the rear yard of the property, which were constructed without an authorized building permit.
170 m away · filed Oct 12, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.