Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

157 Ridley Blvd

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposed demolition of dwelling to be replaced by 2 storey single family dwelling with finished basement and integrated garage.

    Applied Feb 5, 2018 · issued May 1, 2018 · completed Jul 15, 2018 · 1 home removed · Permit 18 113438 DEM

    Closed
  • Heating and ventilation

    HVAC - Proposed demolition of dwelling to be replaced by 2 storey single family dwelling with finished basement and integrated garage.

    Applied Feb 2, 2018 · issued Jun 1, 2018 · completed Jan 7, 2020 · Permit 18 111670 HVA

    Closed
  • Plumbing

    Plumbing - Proposed demolition of dwelling to be replaced by 2 storey single family dwelling with finished basement and integrated garage.

    Applied Feb 2, 2018 · issued May 1, 2018 · completed Jan 10, 2020 · Permit 18 111670 PLB

    Closed
  • Drains and site services

    Drain - Proposed demolition of dwelling to be replaced by 2 storey single family dwelling with finished basement and integrated garage.

    Applied Feb 2, 2018 · issued May 1, 2018 · completed Jan 7, 2020 · Permit 18 111670 DRN

    Closed
  • New house · New building

    Proposed demolition of dwelling to be replaced by 2 storey single family dwelling with finished basement and integrated garage.

    Applied Jan 30, 2018 · issued May 1, 2018 · completed Mar 5, 2020 · 1 home added · Permit 18 111670 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey dwelling with an integral garage. The existing dwelling would be demolished.

    Decision: Refused (hearing Apr 20, 2016)

    Filed Feb 26, 2016 · File A0210/16NY

    OMB appeal

What’s planned nearby

Development sites within 500 m

  • 190-200 Ridley Boulevard

    4 storeys · 20 homes · Residential

    210 m away · Site plan · Under appeal · filed Jan 18, 2023

    Under appeal

Neighbours’ Committee of Adjustment files within 250 m

  • 177 Joicey Blvd · Minor variance

    To construc a new detached dwelling with an integral garage.

    190 m away · filed Feb 25, 2026 · Approved on condition

  • 178 Joicey Blvd · Minor variance

    To permit the lot coverage and side yard setbacks of the detached dwelling. Please note this application was previously deferred at the June 4, 2026 Committee of Adjustment Public Hearing.

    170 m away · filed Feb 19, 2026 · Approved

  • 177 Joicey Blvd · Minor variance

    To build a new detached house with a built-in garage.

    190 m away · filed Oct 2, 2025 · Refused

  • 123 Ridley Blvd · Minor variance

    To construct two ancillary structures (cabana and pergola) in the rear yard of the property.

    230 m away · filed May 15, 2025 · Approved

  • 9 Hedon Ave · Minor variance

    To construct a new detached dwelling with integral garage.

    230 m away · filed Mar 31, 2025 · Approved

  • 45 Esgore Dr · Minor variance

    To alter the existing rear deck in conjunction with constructing a new roof over the deck. Please note, this application was previously deferred Thursday, March 20, 2025.

    220 m away · filed Feb 5, 2025 · Approved

  • 41 Esgore Dr · Minor variance

    To construct a new detached dwelling.

    240 m away · filed Oct 1, 2024 · Approved

  • 449 Elm Rd · Minor variance

    To construct a new dwelling.

    190 m away · filed Aug 7, 2024 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.