Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

158 Pape Ave

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Carport

    To construct detached unclosed carport.

    Applied Sep 14, 2021 · issued Sep 29, 2021 · completed May 24, 2022 · Permit 21 212675 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations and complete the partly finished basement.

    Applied May 4, 2018 · issued May 10, 2018 · completed Aug 20, 2018 · Permit 18 144587 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations and complete the partly finished basement.

    Applied Apr 16, 2018 · issued Apr 26, 2018 · completed Aug 20, 2018 · Permit 18 144587 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for interior alterations and complete the partly finished basement.

    Applied Apr 16, 2018 · issued Apr 26, 2018 · completed Aug 20, 2018 · Permit 18 144587 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 929 Queen Street East

    9 storeys · 78 homes · Mixed use

    330 m away · Site plan · Approved · filed May 3, 2023

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    190 m away · filed Aug 21, 2026 · Postponed

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    160 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    110 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    230 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    110 m away · filed Jun 5, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    100 m away · filed Apr 22, 2025 · Approved

  • 53 Boston Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.

    60 m away · filed Dec 3, 2024 · Approved

  • 43 Boston Ave · Minor variance

    To alter the existing two-storey rowhouse dwelling by constructing a new front basement walkout with stairs for the purposes of accommodating a secondary suite. Also, to reconstruct the rear ground level deck. There will be two dwellings on the lot (duplex).

    60 m away · filed Sep 5, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.